Southwestern Power Administration August 2008 – Federal Register Recent Federal Regulation Documents

Notice of Re-Opening of Public Comment Period for White River Minimum Flows-Proposed Determination of Federal and Non-Federal Hydropower Impacts
Document Number: E8-18574
Type: Notice
Date: 2008-08-12
Agency: Department of Energy, Southwestern Power Administration
Southwestern Power Administration (Southwestern) is re-opening the public comment period on its proposed determination of the Federal and non-Federal hydropower impacts of the White River Minimum Flows project for an additional 45 days. The original notice, issued July 3, 2008, provided a 30-day comment period ending on August 4, 2008 (73 FR 38198). Southwestern is re-opening the comment period until September 18, 2008.
Robert D. Willis Power Rate
Document Number: E8-17912
Type: Notice
Date: 2008-08-05
Agency: Department of Energy, Southwestern Power Administration
The Administrator, Southwestern Power Administration (Southwestern), has prepared Current and Revised 2008 Power Repayment Studies that show the need for an increase in annual revenues to meet cost recovery criteria. Such increased revenues are required primarily due to increases in U.S. Army Corps of Engineers' operations and maintenance estimates. The Administrator has developed a proposed Robert D. Willis rate schedule, which is supported by a power repayment study, to recover the required revenues. Beginning October 1, 2008, the proposed rates would increase annual revenues approximately 14.0 percent from $815,580 to $929,388.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.