Rural Utilities Service August 3, 2009 – Federal Register Recent Federal Regulation Documents
Results 1 - 1 of 1
Tri-State Generation and Transmission Association, Inc., Notice of Intent To Hold Public Scoping Meetings and Prepare an Environmental Assessment
The Rural Utilities Service (RUS) intends to hold public scoping meetings and prepare an Environmental Assessment (EA) to meet its responsibilities under the National Environmental Policy Act (NEPA) and 7 CFR part 1794 in connection with potential impacts related to a proposed project in Colorado by Tri-State Generation and Transmission Association, Inc. (Tri-State) and Public Service Company of Colorado (Public Service), an Xcel Energy Operating Company. The proposed San Luis Valley-Calumet-Comanche Transmission Project (proposed action) consists of the following: a proposed 230/345-kilovolt (kV) Calumet Substation to be located approximately 6 miles north of the existing Walsenburg Substation in Huerfano County; a proposed double-circuit 230-kV transmission line between the existing San Luis Valley Substation in Alamosa County and the Calumet Substation; a proposed single-circuit 230-kV transmission line between the Calumet Substation and the Walsenburg Substation; and a proposed double-circuit 345-kV transmission line connecting the Calumet Substation to the existing Comanche Substation in Pueblo County. Tri-State is requesting that RUS provide financial assistance for the proposed action.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.