Pipeline and Hazardous Materials Safety Administration January 2009 – Federal Register Recent Federal Regulation Documents

Common Law Tort Claims Concerning Design and Marking of DOT Specification 39 Compressed Gas Cylinders
Document Number: E9-1993
Type: Notice
Date: 2009-01-30
Agency: Pipeline and Hazardous Materials Safety Administration, Department of Transportation
Interested parties are invited to comment on an application by AMTROL, Inc., for an administrative determination as to whether Federal hazardous material transportation law preempts State common law tort claims alleging that the manufacturer of DOT specification 39 compressed gas cylinders should have designed the cylinders to resist rusting over time and/or provided additional warnings of the potential rusting over time, beyond requirements in the Hazardous Materials Regulations (HMR) for the manufacture, marking, and labeling of these cylinders.
New York State Department of Environmental Conservation Requirements on Gasoline Transport Vehicles
Document Number: E9-1431
Type: Notice
Date: 2009-01-23
Agency: Pipeline and Hazardous Materials Safety Administration, Department of Transportation
Federal hazardous material transportation law does not preempt that part of 6 NYCRR 230.4(a)(3) requiring that a gasoline transport vehicle must be marked, near the U.S. DOT specification plate, with the date on which the tank was last tested for vapor tightness. Federal hazardous material transportation law preempts (1) the provisions in 6 NYCRR 230.4(a)(3) which require that the marking be a minimum two inches and contain ``NYS DEC''; (2) the requirement in 6 NYCRR 230.6(b) for maintaining a copy of the most recent pressure-vacuum test results with the gasoline transport vehicle; and (3) the requirement in 6 NYCRR 230.6(c) to retain pressure-vacuum test and repair results for two years, because these requirements are not substantively the same as requirements in the HMR on the marking, maintaining, repairing, or testing of a package or container that is represented, marked, certified, or sold as qualified for transporting hazardous material.
Pipeline Safety: Requests for Special Permit
Document Number: E9-1425
Type: Notice
Date: 2009-01-23
Agency: Pipeline and Hazardous Materials Safety Administration, Department of Transportation
The Federal pipeline safety laws allow a pipeline operator to request PHMSA to waive compliance with any part of the Federal pipeline safety regulations by granting a special permit to the operator. PHMSA is publishing this notice to provide a list of special permit requests we have received from pipeline operators seeking relief from compliance with certain pipeline safety regulations. This notice seeks public comment on these requests, including comments on any environmental impacts. At the conclusion of the 30 days comment period, PHMSA will evaluate each request individually to determine whether to grant or deny a special permit.
Massachusetts' Definitions of Hazardous Materials
Document Number: E9-1419
Type: Notice
Date: 2009-01-23
Agency: Pipeline and Hazardous Materials Safety Administration, Department of Transportation
The Federal Hazmat Law does not preempt the definitions of ``hazardous material'' in M.G.L. chs. 21 E and 21 K. As applied and enforced, the challenged provisions of Massachusetts' laws are not an ``obstacle'' to accomplishing and carrying out the Federal Hazmat Law, the HMR, or a hazardous materials transportation security regulation or directive issued by the Secretary of Homeland Security. Because a regulated entity may comply with the State and Federal requirements at the same time the Massachusetts' laws are not preempted under the ``dual compliance'' test. These definitions and State requirements also do not concern any of the five subject areas in which State Authority is expressly preempted by the Federal Hazmat Law, and State enforcement of these laws does not otherwise frustrate Congressional intent.
Office of Hazardous Materials Safety; Notice of Application for Special Permits
Document Number: E9-1176
Type: Notice
Date: 2009-01-23
Agency: Pipeline and Hazardous Materials Safety Administration, Department of Transportation
In accordance with the procedures governing the application for, and the processing of, special permits from the Department of Transportation's Hazardous Material Regulations (49 CFR Part 107, Subpart B), notice is hereby given that the Office of Hazardous Materials Safety has received the application described herein. Each mode of transportation for which a particular special permit is requested is indicated by a number in the 'Nature of Application'' portion of the table below as follows: 1Motor vehicle, 2Rail freight, 3Cargo vessel, 4Cargo aircraft only, 5Passenger-carrying aircraft.
Office of Hazardous Materials Safety; Notice of Applications for Modification of Special Permit
Document Number: E9-1175
Type: Notice
Date: 2009-01-23
Agency: Pipeline and Hazardous Materials Safety Administration, Department of Transportation
In accordance with the procedures governing the application for, and the processing of, special permits from the Department of Transportation's Hazardous Material Regulations (49 CFR Part 107, Subpart B), notice is hereby given that the Office of Hazardous Materials Safety has received the application described herein. This notice is abbreviated to expedite docketing and public notice. Because the sections affected, modes of transportation, and the nature of application have been shown in earlier Federal Register publications, they are not repeated here. Request of modifications of special permits (e.g. to provide for additional hazardous materials, packaging design changes, additional mode of transportation, etc.) are described in footnotes to the application number. Application numbers with the suffix ``M'' demote a modification request. There applications have been separated from the new application for special permits to facilitate processing.
Office of Hazardous Materials Safety; Notice of Delays in Processing of Special Permits Applications
Document Number: E9-1010
Type: Notice
Date: 2009-01-22
Agency: Pipeline and Hazardous Materials Safety Administration, Department of Transportation
In accordance with the requirements of 49 U.S.C. 5117(c), PHMSA is publishing the following list of special permit applications that have been in process for 180 days or more. The reason(s) for delay and the expected completion date for action on each application is provided in association with each identified application.
Pipeline Safety: Administrative Procedures, Address Updates, and Technical Amendments
Document Number: E9-628
Type: Rule
Date: 2009-01-16
Agency: Pipeline and Hazardous Materials Safety Administration, Department of Transportation
This final rule adopts, with minor modifications, an interim final rule issued by PHMSA on March 28, 2008, conforming PHMSA's administrative procedures with the Pipeline Inspection, Protection, Enforcement, and Safety Act of 2006 by establishing the procedures PHMSA will follow for issuing safety orders and handling requests for special permits, including emergency special permits. The rule also notifies operators about electronic docket information availability; updates addresses for filing reports, telephone numbers, and routing symbols; and clarifies the time period for processing requests for written interpretations of the regulations. This final rule makes minor amendments and technical corrections to the regulatory text in response to written public comments received after issuance of the interim final rule.
Hazardous Materials: Revision to Requirements for the Transportation of Batteries and Battery-Powered Devices; and Harmonization With the United Nations Recommendations, International Maritime Dangerous Goods Code, and International Civil Aviation Organization's Technical Instructions
Document Number: E8-31383
Type: Rule
Date: 2009-01-14
Agency: Pipeline and Hazardous Materials Safety Administration, Department of Transportation
This final rule revises the Hazardous Materials Regulations to maintain alignment with international standards by incorporating various amendments, including changes to proper shipping names, hazard classes, packing groups, special provisions, packaging authorizations, air transport quantity limitations, and vessel stowage requirements. These revisions are necessary to harmonize the Hazardous Materials Regulations with recent changes to the International Maritime Dangerous Goods Code, the International Civil Aviation Organization's Technical Instructions for the Safe Transport of Dangerous Goods by Air, Transport Canada's Transportation of Dangerous Goods Regulations, and the United Nations Recommendations on the Transport of Dangerous Goods. These revisions also include amendments and clarifications addressing the safe transportation of batteries and battery-powered devices. Consistent with recent changes to the International Civil Aviation Organization's Technical Instructions, PHMSA is clarifying the prohibition against transporting electrical devices, including batteries and battery-powered devices that are likely to create sparks or generate a dangerous amount of heat. PHMSA is also modifying and enhancing requirements for the packaging and handling of batteries and battery-powered devices, particularly in air commerce, to emphasize the safety precautions that are necessary to prevent incidents during transportation. PHMSA developed these revisions in conjunction with the Federal Aviation Administration to enhance the safe transportation of batteries and battery-powered devices.
Hazardous Materials: Improving the Safety of Railroad Tank Car Transportation of Hazardous Materials
Document Number: E8-31056
Type: Rule
Date: 2009-01-13
Agency: Pipeline and Hazardous Materials Safety Administration, Department of Transportation
The Pipeline and Hazardous Materials Safety Administration (PHMSA), in coordination with the Federal Railroad Administration (FRA), is amending the Hazardous Materials Regulations to prescribe enhanced safety measures for rail transportation of poison inhalation hazard (PIH) materials, including interim design standards for railroad tank cars. Pending validation and implementation of the crashworthiness performance standard proposed in the NPRM issued under this docket on April 1, 2008, the rule mandates commodity-specific improvements in safety features and design standards for newly manufactured DOT specification tank cars. The rule also adopts a 50 mph speed restriction for loaded rail tank cars transporting PIH materials; an improved top fittings performance standard; an allowance to increase the gross weight of tank cars that meet the enhanced standards; and adoption of the industry standard for normalized steel in certain tank cars. The interim standards established in this rule will enhance the accident survivability of PIH tank cars when compared to existing regulations while providing tank car owners continued flexibility in car selection. Adoption of this interim standard will ensure the ongoing availability of tank cars while PHMSA and FRA complete research and testing on advanced tank car design to validate and implement a more stringent performance standard.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.