Office of Energy Efficiency and Renewable Energy February 21, 2012 – Federal Register Recent Federal Regulation Documents
Results 1 - 2 of 2
Notice of Petition for Waiver of LG Electronics U.S.A., Inc. From the Department of Energy Clothes Washer Test Procedure, and Grant of Interim Waiver
This notice announces receipt of and publishes the LG Electronics U.S.A., Inc. (LG) petition for waiver and application for interim waiver (hereafter, ``petition'') from specified portions of the U.S. Department of Energy (DOE) test procedure for determining the energy consumption of clothes washers. Today's notice also grants an interim waiver of the clothes washer test procedure. Through this notice, DOE also solicits comments with respect to the LG petition.
Nationwide Categorical Waivers Under Section 1605 (Buy American) of the American Recovery and Reinvestment Act of 2009 (Recovery Act)
The U.S. Department of Energy (DOE) is hereby granting a nationwide limited waiver of the Buy American requirements of section 1605 of the Recovery Act under the authority of Section 1605(b)(2), (iron, steel, and the relevant manufactured goods are not produced in the United States in sufficient and reasonably available quantities and of a satisfactory quality), with respect to Recovery Act projects funded by EERE for ((1) 400 amp Dual Element Time-Delay Fuses for electric vehicle supply equipment (EVSE) charging station; (2) Video imaging card rack mounted boards for vehicle presence and data detection; (3) 20-ton split system heat pump that meets a minimum static pressure requirement of 3.0 inches of water column (only where the 3.0 water column is a requirement of the system); and (4) network manager for conversion of proprietary protocolStaefa brand systemto a non-proprietary open source protocol.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.