Office of Energy Efficiency and Renewable Energy July 2011 – Federal Register Recent Federal Regulation Documents

Decision and Order Granting a Waiver to Mitsubishi Electric & Electronics USA, Inc. From the Department of Energy Commercial Package Air Conditioner and Heat Pump Test Procedures
Document Number: 2011-17311
Type: Notice
Date: 2011-07-11
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
This notice publishes the U.S. Department of Energy's (DOE) Decision and Order in Case No. CAC-030, which grants Mitsubishi Electric & Electronics USA, Inc. (Mitsubishi) a waiver from the existing DOE test procedures applicable to commercial package air- source and water-source central air conditioners and heat pumps. The waiver is specific to indoor units of the Mitsubishi variable capacity CITY MULTI WR2 and WY Series and CITY MULTI S&L Class multi-split commercial heat pumps. As a condition of this waiver, Mitsubishi must use the alternate test procedure set forth in this notice to test and rate its WR2 and WY Series and S&L Class CITY MULTI multi-split commercial heat pumps.
Availability of the Geothermal Technologies Program Blue Ribbon Panel Report and Request for Public Comment
Document Number: 2011-16579
Type: Notice
Date: 2011-07-01
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy, Energy Efficiency and Renewable Energy Office
The Department of Energy's (DOE) Office of Energy Efficiency and Renewable Energy (EERE) Geothermal Technologies Program (the Program) assembled a geothermal Blue Ribbon Panel (the Panel) on March 22/23, 2011 in Albuquerque, New Mexico for a guided discussion on the future of geothermal energy in the United States and the role of the DOE Program. The Geothermal Blue Ribbon Panel Report captures the discussions and recommendations of the experts and can be accessed at: https://geothermal.energy.gov/brp.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.