Exelon Generation Company, LLC; Byron Station, Unit Nos. 1 and 2 and Independent Spent Fuel Storage Installation
Document Number: 2021-21435
Type: Notice
Date: 2021-10-01
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has granted the request of Exelon Generation Company, LLC (Exelon, the licensee) to withdraw its application dated November 2, 2020, for proposed amendments to Renewed Facility Operating License Nos. NPF-37 and NPF-66 for Byron Station, Unit Nos. 1 and 2 (Byron), respectively, and the general license for the Independent Spent Fuel Storage Installation (ISFSI). The proposed amendments would have revised the Byron emergency plan following the permanent cessation of power operations to reflect the post-shutdown and permanently defueled condition of the units.
List of Approved Spent Fuel Storage Casks: Holtec International HI-STAR 100 Cask System, Certificate of Compliance No. 1008, Renewal of Initial Certificate and Amendment Nos. 1, 2, and 3
Document Number: 2021-21428
Type: Proposed Rule
Date: 2021-10-01
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is proposing to amend its spent fuel storage regulations by revising the Holtec International HI-STAR 100 Cask System listing within the ``List of approved spent fuel storage casks'' to renew, for an additional 40 years, the initial certificate and Amendment Nos. 1, 2, and 3 of Certificate of Compliance No. 1008. The renewal of the initial certificate and Amendment Nos. 1, 2, and 3 revises the certificate of compliance's conditions and technical specifications to address aging management activities related to the structures, systems, and components of the dry storage system to ensure that these will maintain their intended functions during the period of extended storage operations.
List of Approved Spent Fuel Storage Casks: Holtec International HI-STAR 100 Cask System, Certificate of Compliance No. 1008, Renewal of Initial Certificate and Amendment Nos. 1, 2, and 3
Document Number: 2021-21427
Type: Rule
Date: 2021-10-01
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is amending its spent fuel storage regulations by revising the Holtec International HI- STAR 100 Cask System listing within the ``List of approved spent fuel storage casks'' to renew, for an additional 40 years, the initial certificate and Amendment Nos. 1, 2, and 3 of Certificate of Compliance No. 1008. The renewal of the initial certificate and Amendment Nos. 1, 2, and 3 revises the certificate of compliance's conditions and technical specifications to address aging management activities related to the structures, systems, and components of the dry storage system to ensure that these will maintain their intended functions during the period of extended storage operations.
Exelon Generation Company, LLC; Dresden Nuclear Power Station, Units 2 and 3
Document Number: 2021-21400
Type: Notice
Date: 2021-10-01
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has granted the request of Exelon Generation Company, LLC (Exelon, the licensee) to withdraw its application dated October 29, 2020, for proposed amendments to Renewed Facility Operating License Nos. DPR-19 and DPR-25 for Dresden Nuclear Power Station, Units 2 and 3 (Dresden), respectively. The proposed amendments would have made changes to the Dresden licenses and technical specifications (TSs) to reflect the permanent cessation of reactor operations and permanent defueling of the reactors.
Exelon Generation Company, LLC; Dresden Nuclear Power Station, Units 1, 2, and 3
Document Number: 2021-21399
Type: Notice
Date: 2021-10-01
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has granted the request of Exelon Generation Company, LLC (Exelon, the licensee) to withdraw its application dated September 24, 2020, for proposed amendments to Amended Facility Operating License No. DPR-2 and Renewed Facility Operating License Nos. DPR-19 and DPR-25 for Dresden Nuclear Power Station, Units 1, 2, and 3 (Dresden), respectively. The proposed amendments would have made changes to technical specifications (TSs) definitions and administrative controls for the permanently defueled condition.
Exelon Generation Company, LLC; Dresden Nuclear Power Station, Units 1, 2, and 3 and Independent Spent Fuel Storage Installation
Document Number: 2021-21398
Type: Notice
Date: 2021-10-01
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has granted the request of Exelon Generation Company, LLC (Exelon, the licensee) to withdraw its application dated November 2, 2020, for proposed amendments to Amended Facility Operating License No. DPR-2 and Renewed Facility Operating License Nos. DPR-19 and DPR-25 for Dresden Nuclear Power Station, Units 1, 2, and 3 (Dresden), respectively, and the general license for the Independent Spent Fuel Storage Installation (ISFSI). The proposed amendments would have revised the Dresden emergency plan following the permanent cessation of power operations to reflect the post-shutdown and permanently defueled condition of the units.
Oregon State University
Document Number: 2021-21359
Type: Notice
Date: 2021-10-01
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) staff has received an application from Oregon State University (OSU or the licensee) to renew special nuclear materials (SNM) license number SNM- 2013. The renewed license would authorize the applicant to continue research on used research and test reactor fuel rods that contain greater than critical mass amounts of special nuclear material. The license renewal would allow OSU to continue licensed activities for 10 years beyond its current license.
Order Suspending General License Authority To Export Radioactive Material and Deuterium to China General Nuclear (CGN), CGN Subsidiaries, or Related Entities
Document Number: 2021-21342
Type: Notice
Date: 2021-10-01
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing an Order suspending the general license authority under NRC regulations to export radioactive material and deuterium to China General Nuclear (CGN), CGN subsidiaries, or related entities.
Acceptability of ASME Code Section XI, Division 2, Requirements for Reliability and Integrity Management (RIM) Programs for Nuclear Power Plants, for Non-Light Water Reactors
Document Number: 2021-21295
Type: Notice
Date: 2021-09-30
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment a draft regulatory guide (DG), DG-1383, ``Acceptability of ASME Code Section XI, Division 2, `Requirements for Reliability and Integrity Management (RIM) Programs for Nuclear Power Plants,' for Non- Light Water Reactors.'' This proposed DG describes an approach that is acceptable to the NRC staff for the development and implementation of a preservice inspection (PSI) and inservice inspection (ISI) program for non-light water reactors (non-LWRs). It endorses, with conditions, the 2019 Edition of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (ASME Code), Section XI, ``Rules for Inservice Inspection of Nuclear Power Plant Components,'' Division 2, for non-LWR applications. This RG also describes a method that applicants can use to incorporate PSI and ISI programs into a licensing basis.
List of Approved Spent Fuel Storage Casks: NAC International NAC-UMS® Universal Storage System, Certificate of Compliance No. 1015, Amendment No. 8
Document Number: 2021-21063
Type: Rule
Date: 2021-09-30
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is confirming the effective date of October 19, 2021, for the direct final rule that was published in the Federal Register on August 5, 2021. This direct final rule amended the NAC International NAC-UMS[supreg] Universal Storage System listing in the ``List of approved spent fuel storage casks'' to include Amendment No. 8 to Certificate of Compliance No. 1015. Amendment No. 8 revises the certificate of compliance to add the storage of damaged boiling-water reactor spent fuel, including higher enrichment and higher burnup spent fuel; change the allowable fuel burnup range; expand the boiling-water reactor class 5 fuel inventory that could be stored in the cask; and revise definitions in the technical specifications.
Florida Power & Light Company; NextEra Energy; St. Lucie Plant, Units Nos. 1 and 2
Document Number: 2021-21168
Type: Notice
Date: 2021-09-29
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is considering an application for the subsequent license renewal of Renewed Facility Operating License Nos. DPR-67 and NPF-16, which authorize Florida Power & Light Company (FPL or the applicant) to operate St. Lucie Plant (St. Lucie), Unit Nos. 1 and 2. The subsequent renewed operating licenses would authorize the applicant to operate St. Lucie for an additional 20 years beyond the period specified in each of the current renewed licenses. The current renewed operating licenses for St. Lucie expire as follows: Unit 1 on March 1, 2036, and Unit 2 on April 6, 2043. Because this application contains sensitive unclassified non-safeguards information (SUNSI), an order imposes procedures to obtain access to SUNSI for contention preparation.
Westinghouse Electric Company, LLC, Columbia Fuel Fabrication Facility
Document Number: 2021-21053
Type: Notice
Date: 2021-09-28
Agency: Nuclear Regulatory Commission, Agencies and Commissions
On July 30, 2021, the U.S. Nuclear Regulatory Commission (NRC) issued a draft Environmental Impact Statement (EIS) for Westinghouse Electric Company, LLC's (WEC's) license renewal application to continue to operate its Columbia Fuel Fabrication Facility (CFFF) for an additional 40 years. The public comment period for the draft EIS opened on August 6 and closed on September 20, 2021. The NRC has decided to re-open the public comment period until November 19, 2021 to allow more time for the public to submit comments. The CFFF is located in Hopkins, South Carolina, and manufactures nuclear fuel assemblies for commercial nuclear power plants. The WEC's license renewal request, if granted as proposed, would allow the CFFF to continue to be a source of nuclear fuel for commercial nuclear power plants for 40 years from the date the NRC approves the renewal.
Sunshine Act Meetings
Document Number: 2021-20986
Type: Notice
Date: 2021-09-27
Agency: Nuclear Regulatory Commission, Agencies and Commissions
689th Meeting of the Advisory Committee on Reactor Safeguards (ACRS)
Document Number: 2021-20751
Type: Notice
Date: 2021-09-24
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Acceptable Standard Format and Content for the Fundamental Nuclear Material Control Plan Required for Special Nuclear Material of Moderate Strategic Significance
Document Number: 2021-20631
Type: Notice
Date: 2021-09-23
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment a draft NUREG, NUREG-2159, ``Acceptable Standard Format and Content for the Fundamental Nuclear Material Control Plan Required for Special Nuclear Material of Moderate Strategic Significance.'' This draft NUREG provides information to facilitate compliance with NRC regulations applicable to fundamental nuclear material control plans.
SHINE Medical Technologies, LLC; SHINE Medical Isotope Production Facility
Document Number: 2021-20622
Type: Notice
Date: 2021-09-23
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an amendment to Construction Permit No. CPMIF-001, issued to SHINE Medical Technologies, LLC, for the construction of the SHINE Medical Isotope Production Facility. The proposed amendment would allow the receipt and possession of certain radioactive materials necessary for the continued construction of the SHINE Medical Isotope Production Facility. Because this amendment request contains sensitive unclassified non-safeguards information (SUNSI), an order imposes procedures to obtain access to SUNSI for contention preparation.
Preparing Probabilistic Fracture Mechanics Submittals
Document Number: 2021-20566
Type: Notice
Date: 2021-09-23
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment a draft regulatory guide (DG), DG-1382, ``Preparing Probabilistic Fracture Mechanics Submittals'' and accompanying draft NUREG/CR-7278, ``Technical Basis for the use of Probabilistic Fracture Mechanics in Regulatory Applications.'' This DG is proposed new Regulatory Guide (RG) 1.245. This draft guide describes a framework to develop the contents of a licensing submittal that the staff of the NRC considers acceptable when performing probabilistic fracture mechanics (PFM) analyses in support of regulatory applications. The draft NUREG provides the technical basis for DG-1382.
Measuring, Evaluating, and Reporting Radioactive Material in Liquid and Gaseous Effluents and Solid Waste
Document Number: 2021-20565
Type: Notice
Date: 2021-09-23
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing revision 3 of Regulatory Guide (RG) 1.21, ``Measuring, Evaluating, and Reporting Radioactive Material in Liquid and Gaseous Effluents and Solid Waste.'' The revision of RG describes an approach that is acceptable to the staff of the NRC to meet regulatory requirements for; (1) measuring, evaluating, and reporting plant related radioactivity in effluents and solid radioactive waste shipments from NRC licensed facilities, and (2) assessing and reporting the public dose to demonstrate compliance with NRC regulations.
NRC's Full Draft Strategic Plan for Fiscal Years 2022 Through 2026
Document Number: 2021-20542
Type: Notice
Date: 2021-09-23
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is requesting comments on its Fiscal Years (FYs) 2022-2026 Full Draft Strategic Plan. The Full Draft Strategic Plan provides the agency's proposed strategic goals and objectives and proposed strategies for achieving them. The NRC encourages and welcomes stakeholder feedback that can help inform the continued development of the NRC's FYs 2022-2026 Strategic Plan and evidence building and evaluation activities.
Information Collection: NRC Insider Threat Program for Licensees and Others Requiring Access to Classified Information
Document Number: 2021-20475
Type: Notice
Date: 2021-09-22
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) invites public comment on this proposed information collection. The information collection is entitled, ``NRC Insider Threat Program for Licensees and Others Requiring Access to Classified Information.''
Extending the Duration of the AP1000 Design Certification
Document Number: 2021-20227
Type: Proposed Rule
Date: 2021-09-22
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is proposing to amend its regulations to update the design to reflect changes provided by Westinghouse Electric Company LLC and to extend the duration of the AP1000 design certification for an additional 5 years. The NRC invites public comment on this proposed rule and environmental assessment.
Extending the Duration of the AP1000 Design Certification
Document Number: 2021-20226
Type: Rule
Date: 2021-09-22
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is amending its regulations to update the design to reflect changes provided by Westinghouse Electric Company LLC and to extend the duration of the AP1000 design certification for an additional 5 years. The NRC is also issuing an environmental assessment.
Sunshine Act Meetings
Document Number: 2021-20296
Type: Notice
Date: 2021-09-17
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Operator Licensing Examination Standards for Power Reactors
Document Number: 2021-20171
Type: Notice
Date: 2021-09-17
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing NUREG- 1021, Revision 12, ``Operator Licensing Examination Standards for Power Reactors.''
Interim Storage Partners, LLC; WCS Consolidated Interim Storage Facility; Issuance of Materials License and Record of Decision
Document Number: 2021-20092
Type: Notice
Date: 2021-09-17
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has issued Materials License No. SNM-2515 to Interim Storage Partners, LLC (ISP) to construct and operate the WCS Consolidated Interim Storage Facility (CISF) as proposed in its license application, as amended, and to receive, possess, store, and transfer spent nuclear fuel and Greater- than-Class-C radioactive waste at the WCS CISF in Andrews County, Texas. ISP will be required to operate under the conditions listed in Materials License No. SNM-2515. The NRC staff has published a record of decision (ROD) that supports the NRC's decision to approve ISP's license application for the WCS CISF and to issue the license.
Perma-Fix Northwest Richland, Inc.
Document Number: 2021-19841
Type: Notice
Date: 2021-09-15
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) received and is considering issuing an export license (XW029) requested by Perma-Fix Northwest Richland, Inc. (PFNW). On July 2, 2021, PFNW filed an application with the NRC for a license authorizing the export of low- level radioactive waste to BWXT Medical, Ltd., Canada. The NRC is providing notice of the opportunity to comment, request a hearing, and petition to intervene on PFNW's application.
Perma-Fix Northwest Richland, Inc.
Document Number: 2021-19840
Type: Notice
Date: 2021-09-15
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) received and is considering issuing an export license (XW028) requested by Perma-Fix Northwest Richland, Inc. (PFNW). On July 2, 2021, PFNW filed an application with the NRC for a license authorizing the export of low- level radioactive waste to Nordion (Canada) Inc., Canada. The NRC is providing notice of the opportunity to comment, request a hearing, and petition to intervene on PFNW's application.
Issuance of Exemption in Response to COVID-19 Public Health Emergency
Document Number: 2021-19824
Type: Notice
Date: 2021-09-15
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) issued one exemption in August 2021 in response to a request from one licensee for relief due to the coronavirus 2019 disease (COVID-19) public health emergency (PHE). The exemption affords the licensee temporary relief from certain requirements under NRC regulations.
Considerations for Estimating Site-Specific Probable Maximum Precipitation at Nuclear Power Plants in the United States of America
Document Number: 2021-19636
Type: Notice
Date: 2021-09-13
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing a knowledge management NUREG, NUREG/KM-0015, ``Considerations for Estimating Site-Specific Probable Maximum Precipitation at Nuclear Power Plants in the United States of America.'' The NRC staff and Oak Ridge National Laboratory have prepared a reference document summarizing recent lessons-learned in connection with a review of the site-specific probable maximum precipitation (SSPMP) estimates used by some nuclear power plant owners and operators in connection with a recent re-evaluation of external flooding at their respective project sites.
Safety-Related Steel Structures and Steel-Plate Composite Walls for Other Than Reactor Vessels and Containments
Document Number: 2021-19621
Type: Notice
Date: 2021-09-13
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is correcting a notice that was published in the Federal Register (FR) on September 7, 2021, regarding the issuance of Regulatory Guide (RG) 1.243, ``Safety- Related Steel Structures and Steel-Plate Composite Walls for other than Reactor Vessels and Containments.'' This action is necessary to correct the NRC Docket ID in the notice title and the ADDRESSES section and to correct a date in the Additional Information section.
Sunshine Act Meetings
Document Number: 2021-19719
Type: Notice
Date: 2021-09-10
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Systematic Assessment for How the NRC Addresses Environmental Justice in Its Programs, Policies, and Activities
Document Number: 2021-19549
Type: Notice
Date: 2021-09-10
Agency: Nuclear Regulatory Commission, Agencies and Commissions
On July 9, 2021, the U.S. Nuclear Regulatory Commission (NRC) requested comments as part of its systematic review for how NRC programs, policies, and activities address environmental justice. Specifically, the NRC requested input on how the agency is addressing environmental justice, considering the agency's mission and statutory authority. The information will be used to inform the agency's assessment of how it addresses environmental justice. The public comment period was originally scheduled to close on August 23, 2021 and was extended to September 22, 2021. The NRC has decided to extend the public comment period to allow more time for members of the public to develop and submit their comments.
NextEra Energy Duane Arnold, LLC; Duane Arnold Energy Center; Post-Shutdown Decommissioning Activities Report
Document Number: 2021-19417
Type: Notice
Date: 2021-09-09
Agency: Nuclear Regulatory Commission, Agencies and Commissions
On June 19, 2020, the U.S. Nuclear Regulatory Commission (NRC) solicited comments on the post-shutdown decommissioning activities report (PSDAR) for the Duane Arnold Energy Center (DAEC). The PSDAR, which includes the site-specific decommissioning cost estimate (DCE), provides an overview of NextEra Energy Duane Arnold, LLC's planned decommissioning activities, schedule, projected costs, and environmental impacts for DAEC. The NRC will hold an in-person as well as a virtual public meeting to discuss the DAEC PSDAR and DCE and to receive comments.
Southern Nuclear Operating Company, Inc; Vogtle Electric Generating Plant, Units 3 and 4; Inspections, Tests, Analyses, and Acceptance Criteria
Document Number: 2021-19306
Type: Notice
Date: 2021-09-08
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) staff has determined that specified inspections, tests, and analyses have been successfully completed, and that specified acceptance criteria are met for the Vogtle Electric Generating Plant (VEGP), Units 3 and 4. The NRC staff is also rescinding a prior determination of the successful completion of particular inspections, tests, analyses, and acceptance criteria (ITAAC) for VEGP Units 3 and 4.
Seeks Qualified Candidates for the Advisory Committee on Reactor Safeguards
Document Number: 2021-19179
Type: Notice
Date: 2021-09-08
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) seeks qualified candidates for the Advisory Committee on Reactor Safeguards (ACRS). Submit resumes to Ms. Makeeka Compton and Ms. Jamila Perry, ACRS, Mail Stop: T2B50, U.S. Nuclear Regulatory Commission, Washington, DC 20555- 0001, or email Makeeka.Compton@nrc.gov and Jamila.Perry@nrc.gov.
In the Matter of LaCrosseSolutions, LLC; La Crosse Boiling Water Reactor
Document Number: 2021-19343
Type: Notice
Date: 2021-09-07
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing an order to extend the effectiveness of a September 24, 2019, order, which approved the direct transfer of Possession Only License No. DPR-45 for the La Crosse Boiling Water Reactor (LACBWR) from the current holder, LaCrosseSolutions, LLC, to Dairyland Power Cooperative and approved a conforming license amendment, for 12 months beyond its current September 24, 2021, expiration date.
In the Matter of ZionSolutions, LLC and Exelon Generation Company, LLC; Zion Nuclear Power Station, Units 1 and 2
Document Number: 2021-19342
Type: Notice
Date: 2021-09-07
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing an order to extend until November 26, 2022, the effectiveness of a November 26, 2019, order, which approved the direct transfer of Facility Operating License Nos. DPR-39 and DPR-48 for Zion Nuclear Power Station (ZNPS), Units 1 and 2, respectively, and the general license for the ZNPS independent spent fuel storage installation from the current holder, ZionSolutions, LLC, to Exelon Generation Company, LLC and approved conforming license amendments.
Safety-Related Steel Structures and Steel-Plate Composite Walls for Other Than Reactor Vessels and Containments
Document Number: 2021-19178
Type: Notice
Date: 2021-09-07
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing Regulatory Guide (RG) 1.243, ``Safety-Related Steel Structures and Steel-Plate Composite Walls for Other Than Reactor Vessels and Containments.'' RG 1.243 is a new guide that proposes guidance to meet regulatory requirements for safety-related steel structures and steel plate composite walls for other than reactor vessels and containments by endorsing with exceptions, the 2018 edition of ANSI/ANS N690-2018, ``Specification for Safety-Related Steel Structures for Nuclear Facilities.''
Monthly Notice Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations
Document Number: 2021-18934
Type: Notice
Date: 2021-09-07
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Pursuant to section 189.a.(2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is publishing this regular monthly notice. The Act requires the Commission to publish notice of any amendments issued, or proposed to be issued, and grants the Commission the authority to issue and make immediately effective any amendment to an operating license or combined license, as applicable, upon a determination by the Commission that such amendment involves no significant hazards consideration (NSHC), notwithstanding the pendency before the Commission of a request for a hearing from any person. This monthly notice includes all amendments issued, or proposed to be issued, from July 23, 2021, to August 19, 2021. The last monthly notice was published on August 10, 2021.
Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information
Document Number: 2021-17612
Type: Notice
Date: 2021-09-07
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) received and is considering approval of two amendment requests. The amendment requests are for Florida Power & Light Co., Turkey Point Nuclear Generating Station, Unit Nos. 3 and 4 and Tennessee Valley Authority, Browns Ferry Nuclear Plant, Units 1, 2, and 3. For each amendment request, the NRC proposes to determine that they involve no significant hazards consideration (NSHC). Because each amendment request contains sensitive unclassified non-safeguards information (SUNSI), an order imposes procedures to obtain access to SUNSI for contention preparation by persons who file a hearing request or petition for leave to intervene.
Sunshine Act Meetings
Document Number: 2021-19241
Type: Notice
Date: 2021-09-03
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Southern Nuclear Operating Company Inc; Vogtle Electric Generating Plant, Units 3 and 4
Document Number: 2021-19133
Type: Notice
Date: 2021-09-03
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an amendment and exemption to Combined Licenses (COL) NPF- 91 and NPF-92, issued to Southern Nuclear Operating Company, Inc. (SNC), and Georgia Power Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC, MEAG Power SPVJ, LLC, MEAG Power SPVP, LLC, and the City of Dalton, Georgia (collectively, SNC), for construction and operation of the Vogtle Electric Generating Plant (VEGP), Units 3 and 4, located in Burke County, Georgia.
Sunshine Act Meetings
Document Number: 2021-18680
Type: Notice
Date: 2021-08-30
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Exelon Generation Company, LLC, Byron Station, Unit Nos. 1 and 2
Document Number: 2021-18601
Type: Notice
Date: 2021-08-30
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing an exemption in response to a September 28, 2020, request from Exelon Generation Company, LLC. The exemption allows either a licensed senior operator or a certified fuel handler to approve the emergency suspension of security measures for Byron Station, Unit Nos. 1 and 2 during certain emergency conditions or during severe weather after both the certification of permanent cessation of operations and the certification of permanent fuel removal have been docketed for the facility.
Exelon Generation Company, LLC, Dresden Nuclear Power Station, Units 2 and 3
Document Number: 2021-18600
Type: Notice
Date: 2021-08-30
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing an exemption in response to a September 28, 2020, request from Exelon Generation Company, LLC. The exemption allows either a licensed senior operator or a certified fuel handler to approve the emergency suspension of security measures for Dresden Nuclear Power Station, Units 2 and 3 during certain emergency conditions or during severe weather after both the certification of permanent cessation of operations and the certification of permanent fuel removal have been docketed for the facility.
Advisory Committee on the Medical Uses of Isotopes: Meeting Notice
Document Number: 2021-18514
Type: Notice
Date: 2021-08-27
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) will convene a meeting of the Advisory Committee on the Medical Uses of Isotopes (ACMUI) on October 4, 2021. A sample of agenda items to be discussed during the public session includes: (1) A discussion of the ACMUI's review and analysis of medical events from fiscal years 2017 to 2020; (2) a discussion of the ACMUI's subcommittee report on radionuclide generator knowledge and practice requirements; (3) a discussion of the ACMUI's subcommittee report on emerging radiopharmaceutical therapy knowledge requirements in theranostics; (4) a discussion on production challenges for therapeutic radiopharmaceuticals; and (5) a discussion on the future of personalized dosimetry. The agenda is subject to change. The current agenda and any updates will be available on the ACMUI's Meetings and Related Documents web page at https://www.nrc.gov/ reading-rm/doc-collections/acmui/meetings/2021.html or by emailing Ms. Kellee Jamerson at the contact information below. Purpose: Discuss issues related to 10 CFR part 35 Medical Use of Byproduct Material. Date and Time for Open Session: October 4, 2021, from 10:00 a.m. to 4:00 p.m.
Sunshine Act Meetings
Document Number: 2021-18445
Type: Notice
Date: 2021-08-26
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Information Collection: NRC Form 7, Application for NRC Export/Import License, Amendment, Renewal or Consent Request(s)
Document Number: 2021-18363
Type: Notice
Date: 2021-08-26
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) invites public comment on the renewal of Office of Management and Budget (OMB) approval for an existing collection of information. The information collection is entitled NRC Form 7, ``Application for NRC Export/Import License, Amendment, Renewal or Consent Request(s).''
Virginia Electric and Power Company; Dominion Energy Virginia; North Anna Power Station, Unit Nos. 1 and 2
Document Number: 2021-18255
Type: Notice
Date: 2021-08-25
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment draft plant-specific Supplement 7, Second Renewal, to the Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, NUREG-1437, regarding the subsequent renewal of Facility Operating License Nos. NPF-4 and NPF-7 for an additional 20 years of operation for North Anna Power Station, Unit Nos. 1 and 2 (North Anna). The North Anna facility is located in Louisa County, Virginia. Possible alternatives to the proposed action (subsequent license renewal) include no action and reasonable replacement power alternatives.
Miscellaneous Corrections; Correction
Document Number: 2021-18156
Type: Rule
Date: 2021-08-24
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is correcting a final rule that was published in the Federal Register on August 9, 2021. The rule amended NRC's regulations to make miscellaneous corrections, remove outdated reporting requirements, clarify language, add metric units, and insert missing language. This action is necessary to correct inadvertent errors in the final rule.