Nuclear Regulatory Commission December 2016 – Federal Register Recent Federal Regulation Documents

Advanced Light-Water Reactor Probabilistic Risk Assessment
Document Number: 2016-28962
Type: Notice
Date: 2016-12-02
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing Interim Staff Guidance (ISG), DC/COL-ISG-028, ``Assessing the Technical Adequacy of the Advanced Light-Water Reactor Probabilistic Risk Assessment for the Design Certification Application and Combined License Application.'' The purpose of this ISG is to provide guidance for assessing the technical adequacy of the probabilistic risk assessment (PRA) needed for advanced light-water reactor (ALWR) design certification (DC) and combined license (COL) applications. This guidance addresses only the typical conditions for the DC and COL application.
Miscellaneous Corrections
Document Number: 2016-28684
Type: Rule
Date: 2016-12-02
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is amending its regulations to make miscellaneous corrections. The amendments include correcting a senior NRC management position title; correcting terminology for consistency in NRC regulations; and correcting contact information, references, typographical errors, and misspellings. This document is necessary to inform the public of these non-substantive amendments to the NRC's regulations.
Tennessee Valley Authority; Browns Ferry Nuclear Plant, Units 1, 2, and 3
Document Number: 2016-28865
Type: Notice
Date: 2016-12-01
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of amendments to Renewed Facility Operating License Nos. DPR- 33, DPR-52, and DPR-68 issued to Tennessee Valley Authority (TVA, the licensee) for operation of Browns Ferry Nuclear Plant, Units 1, 2, and 3 (BFN) located in Limestone County, Alabama. The proposed amendments would increase the maximum licensed thermal power level for each reactor from 3,458 megawatts thermal (MWt) to 3,952 MWt. This change, referred to as an extended power uprate (EPU), represents an increase of approximately 14.3 percent above the current licensed thermal power limit. The NRC is issuing a draft environmental assessment (EA) and draft finding of no significant impact (FONSI) for public comment associated with the proposed EPU.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.