Nuclear Regulatory Commission September 2012 – Federal Register Recent Federal Regulation Documents

Sunshine Federal Register Notice
Document Number: 2012-24073
Type: Notice
Date: 2012-09-28
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Compliance With Information Request, Flooding Hazard Reevaluation
Document Number: 2012-23892
Type: Notice
Date: 2012-09-28
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing draft Japan Lessons-Learned Project Directorate Interim Staff Guidance (JLD-ISG), JLD-ISG-2012-05, ``Performance of an Integrated Assessment.'' This draft JLD-ISG provides guidance and clarification to assist nuclear power reactor applicants and licensees with performing an integrated assessment in response to enclosure 2 of a March 12, 2012, information request.
Environmental Qualifications of Electrical Equipment
Document Number: 2012-23792
Type: Proposed Rule
Date: 2012-09-27
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) received a petition for rulemaking (PRM), dated June 18, 2012, which was filed with the NRC by the Natural Resources Defense Council, Inc. (NRDC) and Mr. Paul M. Blanch (collectively, the petitioners). The petition was docketed by the NRC on June 22, 2012, and assigned Docket No. PRM-50-106. The petitioners request that the NRC initiate a rulemaking ``to revise its regulations to clearly and unequivocally require the environmental qualification of all safety-related cables, wires, splices, connections and other ancillary electrical equipment that may be subjected to submergence and/or moisture intrusion during normal operating conditions, severe weather, seasonal flooding, seismic events, and post-accident conditions, both inside and outside of containment.'' The NRC is not instituting a public comment period for this PRM at this time.
Sunshine Act Meeting
Document Number: 2012-23665
Type: Notice
Date: 2012-09-25
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Preoperational Testing of Instrument and Control Air Systems
Document Number: 2012-23560
Type: Notice
Date: 2012-09-25
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or Commission) is issuing Revision 1 to Regulatory Guide (RG) 1.68.3, ``Preoperational Testing of Instrument and Control Air Systems.'' This regulatory guide is being revised to address new issues that have been raised since RG 1.68.3 was first issued. These include vibration testing of instrument and control air systems (ICAS) to meet seismic requirement, ICAS air- dryer testing to meet dew point design requirements, ICAS accumulator check valves and solenoid valves operating and testing experience, an update to ISA S7.3 for acceptable industry standards for oil, water and particle matter in ICAS.
License Amendment Request for the U.S. Department of the Army, National Ground Intelligence Center, Charlottesville, VA
Document Number: 2012-23558
Type: Notice
Date: 2012-09-25
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is considering the issuance of a license renewal and amendment to Byproduct Materials License No. 45-25134-01. This license is held by the U.S. Department of the Army, National Ground Intelligence Center (the licensee), for activities conducted at the facilities located in Charlottesville, Virginia; Aberdeen Proving Ground, Maryland; and temporary jobsites anywhere in the United States.
Agency Information Collection Activities: Proposed Collection; Comment Request
Document Number: 2012-23470
Type: Notice
Date: 2012-09-24
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) invites public comment about our intention to request the OMB's approval for renewal of an existing information collection that is summarized below. We are required to publish this notice in the Federal Register under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. chapter 35). Information pertaining to the requirement to be submitted: 1. The title of the information collection: 10 CFR Part 40, ``Domestic Licensing of Source Material.'' 2. Current OMB approval number: 3150-0020. 3. How often the collection is required: On occasion. Reports required under 10 CFR Part 40 are collected and evaluated on a continuing basis as events occur. There is a one-time submittal of information to receive a license. Renewal applications need to be submitted every 5 to 10 years. Information in previous applications may be referenced without being resubmitted. In addition, recordkeeping must be performed on an on-going basis. 4. Who is required or asked to report: 10 CFR Part 40: Applicants for and holders of NRC licenses authorizing the receipt, possession, use, or transfer of radioactive source and byproduct material. 5. The number of annual respondents: 99 (33 NRC Licensees + 66 Agreement State Licensees). 6. The number of hours needed annually to complete the requirement or request: 10,548 hours (4,256 NRC Licensees hours [2,184 reporting + 2,072 recordkeeping] + 6,292 Agreement States Licensees hours [2,500 reporting + 3,792 recordkeeping]). 7. Abstract: 10 CFR Part 40 establishes requirements for licenses for the receipt, possession, use and transfer of radioactive source and byproduct material. The application, reporting and recordkeeping requirements are necessary to permit the NRC to make a determination on whether the possession, use, and transfer of source and byproduct material is in conformance with the Commission's regulations for protection of public health and safety. Submit, by November 23, 2012, comments that address the following questions: 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? 2. Is the burden estimate accurate? 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? 4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology? The public may examine and have copied for a fee, publicly available documents, including the draft supporting statement, at the NRC's Public Document Room, Room O-1F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. The OMB clearance requests are available at the NRC's Web site: https://www.nrc.gov/public-involve/ doc-comment/omb/. The document will be available on the NRC home page site for 60 days after the signature date of this notice. Comments submitted in writing or in electronic form will be made available for public inspection. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions you against including any information in your submission that you do not want to be publicly disclosed. Comments submitted should reference Docket No. NRC- 2012-0198. You may submit your comments by any of the following methods: Electronic comments to: https://www.regulations.gov and search for Docket No. NRC-2012-0198. Mail comments to the NRC's Clearance Officer, Tremaine Donnell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Questions about the information collection requirements may be directed to the NRC's Clearance Officer, Tremaine Donnell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, by telephone at 301-415-6258, or by email to INFOCOLLECTS.Resource@NRC.GOV.
Agency Information Collection Activities: Proposed Collection; Comment Request
Document Number: 2012-23469
Type: Notice
Date: 2012-09-24
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) invites public comment about our intention to request the OMB's approval of the vendor information collection method that is summarized below. We are required to publish this notice in the Federal Register under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). Information pertaining to the requirement to be submitted: 1. The title of the information collection: NRC Reactor Vendor Registration. 2. Current OMB approval number: 3150-XXXX. 3. How often the collection is required: Annually. 4. Who is required or asked to report: Power reactor licensee and applicants are asked to report voluntary. 5. The number of annual respondents: 192. 6. The number of hours needed annually to complete the requirement or request: 183.5 hrs. 7. Abstract: The NRC is commencing an effort to identify vendors of safety- related parts and services to nuclear power plants both directly (vendors) and indirectly (sub-vendors). For the purpose of this document, the term vendor includes supplier. The NRC licensees and applicants are responsible for the safety of facilities licensed by the NRC. As such, they are responsible for ensuring that their vendors meet applicable regulations and requirements, both technical and quality, in purchase documents. In order to ensure that licensees are meeting the regulatory requirements in this area, the NRC inspects vendors to evaluate their conformance with technical and quality requirements in part 21 of Title 10 of the Code of Federal Regulations (10 CFR), ``Reporting of Defects and Noncompliance,'' and Appendix B, ``Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants,'' to 10 CFR part 50, as required by procurement contracts with licensees. There is no requirement for vendors to register with the NRC. This collection will assist the NRC in assessing the number and variety of vendors of safety-related parts and services for resource and vendor inspection planning. As part of that effort, the NRC plans to (1) issue a communication to power reactor licensee and applicants requesting the voluntary submittal of vendor information and (2) create a Web page on its public Web site that allows vendor and sub-vendor information to be submitted individually. When power reactor licensee and applicants respond either by submitting their information by mail or online they will be asked to provide the following information: Vendor names, vendor addresses, vendor points of contact, vendor point of contact email address, vendor telephone number, scope of supply, and comments. Additionally, Vendors will also be able to use this Web page voluntarily to complete self registration. Submit, by November 23, 2012, comments that address the following questions: 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? 2. Is the burden estimate accurate? 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? 4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology? The public may examine and have copied for a fee publicly available documents, including the draft supporting statement, at the NRC's Public Document Room, Room O-1F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. The OMB clearance requests are available at the NRC's Web site: https://www.nrc.gov/public-involve/ doc-comment/omb/. The document will be available on the NRC's home page site for 60 days after the signature date of this notice. Comments submitted in writing or in electronic form will be made available for public inspection. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions you against including any information in your submission that you do not want to be publicly disclosed. Comments submitted should reference Docket No. NRC- 2012-0191. You may submit your comments by any of the following methods: Electronic comments to https://www.regulations.gov and search for Docket No. NRC-2012-0191. Mail comments to the NRC's Clearance Officer, Tremaine Donnell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Questions about the information collection requirements may be directed to the NRC's Clearance Officer, Tremaine Donnell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, by telephone at 301-415-6258, or by email to INFOCOLLECTS.Resource@ NRC.GOV.
Northern States Power Company; Establishment of Atomic Safety and Licensing Board
Document Number: 2012-23363
Type: Notice
Date: 2012-09-21
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Report on Waste Burial Charges: Changes in Decommissioning Waste Disposal Costs at Low-Level Waste Burial Facilities
Document Number: 2012-23351
Type: Notice
Date: 2012-09-21
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) has issued for public comment a document entitled: NUREG-1307 Revision 15, ``Report on Waste Burial Charges: Changes in Decommissioning Waste Disposal Costs at Low-Level Waste Burial Facilities.''
Mr. James Chaisson; Confirmatory Order (Effective Immediately)
Document Number: 2012-23348
Type: Notice
Date: 2012-09-21
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Determining Technical Adequacy of Probabilistic Risk Assessment for Risk-Informed License Amendment Requests After Initial Fuel Load
Document Number: 2012-23347
Type: Notice
Date: 2012-09-21
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing its final Revision 3 to NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition,'' Section 19.1, ``Determining the Technical Adequacy of Probabilistic Risk Assessment for Risk-Informed License Amendment Requests after Initial Fuel Load.'' The NRC staff issues revisions to Standard Review Plan (SRP) sections to facilitate timely implementation of the current staff guidance and to facilitate reviews to amendments to licenses for operating reactors or for activities associated with review of applications for early site permits and combined licenses (COL) for the Office of New Reactors (NRO).
Agency Information Collection Activities: Proposed Collection; Comment Request
Document Number: 2012-23307
Type: Notice
Date: 2012-09-21
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) invites public comment about our intention to request the OMB's approval for the renewal of an existing information collection that is summarized below. We are required to publish this notice in the Federal Register under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). Information pertaining to the required to be submitted: 1. The title of the information collection: NRC Form 790, Classification Record. 2. Current OMB approval number: 3150-0052. 3. How often the collection is required: On occasion. 4. Who is required or asked to report: NRC licensees, contractors, and certificate holders who classify and declassify NRC information. 5. The number of annual respondents: 1400. 6. The number of hours needed annually to complete the requirements or request: 70. 7. Abstract: Completion of the NRC Form 790 is a mandatory requirement for NRC licensees, contractors, and only certificate holder who classifies and declassifies NRC information in accordance with Executive Order 13526, ``Classified National Security Information,'' the Atomic Energy Act, and implementing directives. Submit, by November 20, 2012, comments that address the following questions. 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? 2. Is the burden estimate accurate? 3. Is there a way to enhance the quality, utility, and clarity of the Information to be collected? 4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology? A copy of the draft supporting statement may be viewed free of charge at the NRC Public Document Room, One White Flint North, 11555 Rockville Pike, Room O-1 F21, Rockville, MD, 20852. OMB clearance requests are available at the NRC's Web site: https://www.nrc.gov/ public-involve/doc-comment/omb/. The document will be available on the NRC's home page site for 60 days after the signature date of this notice. Comments submitted in writing or in electronic form will be made available for public inspection. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions you against including any information in your submission that you do not want to be publicly disclosed. Comments submitted should reference Docket No. NRC-2012-0178. You may submit your comments by any of the following methods: (1) Electronic comments. Go to https://www.regulations.gov and search for Docket No. NRC-2012-0178; (2) email comments to the NRC's Clearance Officer, Tremaine Donnell (T-5-F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Questions about the information collection requirements may be directed to the NRC's Clearance Officer, Tremaine Donnell (T-5 F53), Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone 301-415-6258; or (3) email to: INFOCOLLECTS.Resource@NRC.GOV.
Agency Information Collection Activities: Proposed Collection; Comment Request
Document Number: 2012-23287
Type: Notice
Date: 2012-09-21
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) invites public comment about our intention to request the OMB's approval for renewal of an existing information collection that is summarized below. We are required to publish this notice in the Federal Register under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). Information pertaining to the requirement to be submitted: 1. The title of the information collection: NRC Form 531, ``Request for Taxpayer Identification Number.'' 2. Current OMB approval number: 3150-0188. 3. How often the collection is required: One time from each applicant or individual to enable the Department of the Treasury to process electronic payments or collect debts owed to the Government. 4. Who is required or asked to report: All individuals doing business with the NRC, including contractors and recipients of credit, licenses, permits, and benefits. 5. The number of annual respondents: 300. 6. The number of hours needed annually to complete the requirement or request: 25 hours. 7. Abstract: The Debt Collection Improvement Act of 1996, requires that agencies collect taxpayer identification numbers (TINs) from individuals who do business with the Government, including contractors and recipients of credit, licenses, permits, and benefits. The TIN will be used to process all electronic payments (refunds) made to licensees by electronic funds transfer by the Department of the Treasury. The Department of the Treasury will use the TIN to determine whether the refund can be used to administratively offset any delinquent debts reported to the Treasury by other government agencies. In addition, the TIN will be used to collect and report to the Department of the Treasury any delinquent indebtedness arising out of the licensee's or applicant's relationship with the NRC. Submit, by November 20, 2012, comments that address the following questions: 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? 2. Is the burden estimate accurate? 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? 4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology? The public may examine and have copied for a fee publicly available document, including the draft supporting statement, at the NRC's Public Document Room, Room O-1F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. OMB clearance requests are available at the NRC's Web site: https://www.nrc.gov/public-involve/doc-comment/ omb/. The document will be available on the NRC's home page site for 60 days after the signature date of this notice. Comments submitted in writing or in electronic form will be made available for public inspection. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions you against including any information in your submission that you do not want to be publicly disclosed. Comments submitted should reference Docket No. NRC- 2012-0190. You may submit your comments by any of the following methods: Electronic comments to: https://www.regulations.gov and search for Docket No. NRC-2012-0190. Mail comments to the NRC's Clearance Officer, Tremaine Donnell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Questions about the information collection requirements may be directed to the NRC's Clearance Officer, Tremaine Donnell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone at 301-415-6258, or by email to: INFOCOLLECTS.Resource@NRC.GOV.
Guidelines for Preparing and Reviewing Licensing Applications for Instrumentation and Control Upgrades for Non-Power Reactors
Document Number: 2012-23326
Type: Notice
Date: 2012-09-20
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is requesting public comment on Chapter 7, Instrumentation and Control Systems, augmenting NUREG-1537, Part 1, ``Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors: Format and Content,'' for instrumentation and control upgrades and NUREG-1537, Part 2, ``Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors: Standard Review Plan and Acceptance Criteria,'' for instrumentation and control upgrades. This draft chapter of NUREG-1537, Part 1 and Part 2, provides revised guidance for preparing and reviewing applications to amend a facility operating license for I&C upgrades.
Model Safety Evaluation for Plant-Specific Adoption of Technical Specifications Task Force Traveler TSTF-522, Revision 0, “Revise Ventilation System Surveillance Requirements To Operate for 10 Hours per Month,” Using the Consolidated Line Item Improvement Process
Document Number: 2012-23208
Type: Notice
Date: 2012-09-20
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is announcing the availability of Technical Specifications (TSs) Task Force (TSTF) Traveler TSTF-522, Revision 0, ``Revise Ventilation System Surveillance Requirements to Operate for 10 Hours per Month,'' for plant-specific adoption. Additionally, the NRC staff finds the proposed TS (Volume 1) and TS Bases (Volume 2) changes in Traveler TSTF-522 acceptable for inclusion in the following Standard Technical Specifications (STS): NUREG-1430, ``[STS] Babcock and Wilcox Plants,'' NUREG-1431 ``[STS] Westinghouse Plants,'' NUREG-1432 ``[STS] Combustion Engineering Plants,'' NUREG-1433 ``[STS] General Electric BWR/4 Plants,'' NUREG-1434, ``[STS] General Electric BWR/6 Plants.''
Comparative Environmental Evaluation of Alternatives for Handling Low-Level Radioactive Waste Spent Ion Exchange Resins From Commercial Nuclear Power Plants
Document Number: 2012-23205
Type: Notice
Date: 2012-09-20
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Notice is hereby given that the U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing for public comment the Draft Comparative Environmental Evaluation of Alternatives for Handling Low-Level Radioactive Waste Spent Ion Exchange Resins from Commercial Nuclear Power Reactors.
Advisory Committee On Reactor Safeguards; Notice of Meeting
Document Number: 2012-23201
Type: Notice
Date: 2012-09-20
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Sunshine Act Meeting
Document Number: 2012-23198
Type: Notice
Date: 2012-09-19
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Sunshine Federal Register Notice
Document Number: 2012-23062
Type: Notice
Date: 2012-09-18
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Petition for Rulemaking Submitted by Annette User on Behalf of GE Osmonics, Inc.
Document Number: 2012-22699
Type: Proposed Rule
Date: 2012-09-14
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) will consider the issue raised in the petition for rulemaking (PRM) submitted by Annette User, on behalf of GE Osmonics, Inc. (GE or the petitioner), in the rulemaking process. The petitioner requests that the NRC amend its regulations regarding the commercial distribution of byproduct material to allow recipients of exempt quantities of polymer (polycarbonate or polyester) track etch (PCTE) membranes that have been irradiated with mixed fission products (MFP) to commercially redistribute the material without a license. In its review of the PRM, the NRC concluded that the petitioner raised a valid issue concerning regulatory control of the commercial distribution of PCTE membranes that the NRC will consider in its rulemaking process.
Sunshine Federal Register Notice
Document Number: 2012-22540
Type: Notice
Date: 2012-09-12
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Notice of Withdrawal of Final Design Approval; Westinghouse Electric Company; Advanced Passive 1000
Document Number: 2012-22443
Type: Notice
Date: 2012-09-12
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Advisory Committee on Reactor Safeguards (ACRS) Meeting of the ACRS Subcommittee on US-APWR; Notice of Meeting
Document Number: 2012-22439
Type: Notice
Date: 2012-09-12
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Sunshine Act Meetings
Document Number: 2012-22423
Type: Notice
Date: 2012-09-11
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Initial Test Program of Condensate and Feedwater Systems for Light-Water Reactors
Document Number: 2012-22310
Type: Notice
Date: 2012-09-11
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing Revision 2 to Regulatory Guide (RG) 1.68.1, ``Preoperational and Initial Startup Testing of Feedwater and Condensate Systems for Boiling Water Reactor Power Plants.'' This regulatory guide is being revised to: (1) Expand the scope of the guide to encompass preoperational, initial plant startup, and power ascension tests for the condensate and feedwater systems in all types of light water reactor facilities; and (2) to incorporate lessons learned by the NRC staff since the last revision.
Florida Power & Light Company; Receipt of Request for Action
Document Number: 2012-22309
Type: Notice
Date: 2012-09-11
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Fitness-for-Duty Programs
Document Number: 2012-22185
Type: Proposed Rule
Date: 2012-09-10
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) will periodically make publicly available a series of documents related to the ongoing proposed rulemaking effort to amend its regulations regarding Fitness-for-Duty Programs. The NRC does not plan to institute a public comment period for these materials when making them publicly available. This document announces the availability of two rulemaking documents: The regulatory basis and preliminary proposed rule language for requiring personnel performing certain quality control and quality verification (QC/QV) duties to comply with the work hour provisions. The availability of these documents provides increased awareness to interested stakeholders and provides preparatory material for future public meetings.
Guidance on Performing a Seismic Margin Assessment
Document Number: 2012-22174
Type: Notice
Date: 2012-09-10
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment the draft Japan Lessons-Learned Project Directorate Interim Staff Guidance (JLD-ISG), JLD-ISG-2012-04, ``Guidance on Performing a Seismic Margin Assessment in response to the March 2012 Request for Information Letter.'' This draft JLD-ISG provides guidance on an acceptable method for licensees to carry out a Seismic Margins Analysis (SMA) method referred to in the seismic portion of a letter requiring recipients (licensees) to submit information under oath and affirmation to the NRC.
Indiana Michigan Power Company; Donald C. Cook Nuclear Plant, Unit 2; Exemption
Document Number: 2012-22173
Type: Notice
Date: 2012-09-10
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-02; Compliance With Order EA-12-050, Order Modifying Licenses With Regard to Reliable Hardened Containment Vents
Document Number: 2012-22078
Type: Notice
Date: 2012-09-07
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing the Final Japan Lessons-Learned Project Directorate Interim Staff Guidance (JLD-ISG), JLD-ISG-2012-02, ``Compliance with Order EA- 12-050, Order Modifying Licenses With Regard to Reliable Hardened Containment Vents'' (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12229A475). This JLD-ISG provides guidance and clarification to assist nuclear power reactors applicants and licensees with the identification of measures needed to comply with requirements to mitigate challenges to key safety functions. These requirements are contained in Order EA-12-050, ``Order Modifying Licenses with Regard to Reliable Hardened Containment Vents'' (ADAMS Accession No. ML12054A696).
Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-03; Compliance With Order EA-12-051, Order Modifying Licenses With Regard to Reliable Spent Fuel Pool Instrumentation
Document Number: 2012-22069
Type: Notice
Date: 2012-09-07
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing the Final Japan Lessons-Learned Project Directorate (JLD) Interim Staff Guidance (ISG), JLD-ISG-2012-03, ``Compliance with Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation'' (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12221A339). This JLD-ISG provides guidance and clarification to assist nuclear power reactors applicants and licensees with the identification of measures needed to comply with requirements to install enhanced spent fuel pool monitoring capability. These requirements are contained in Order EA-12-051, ``Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation,'' (ADAMS Accession No. ML12054A679).
Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-01; Compliance With Order EA-12-049, Order Modifying Licenses With Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
Document Number: 2012-22066
Type: Notice
Date: 2012-09-07
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing the Final Japan Lessons-Learned Project Directorate Interim Staff Guidance (JLD-ISG), JLD-ISG-2012-01, ``Compliance with Order EA- 12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events,'' Agencywide Documents Access and Management System (ADAMS) Accession No. ML12229A174. This JLD-ISG provides guidance and clarification to assist nuclear power reactor applicants and licensees with the identification of measures needed to comply with requirements to mitigate challenges to key safety functions. These requirements are contained in Order EA- 12-049, ``Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events,'' (ADAMS Accession No. ML12054A736).
Clarification of Submission of Requests for Relief or Alternatives From the Regulatory Requirements Pertaining to Codes and Standards
Document Number: 2012-21541
Type: Proposed Rule
Date: 2012-09-06
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is seeking public comment on a draft regulatory issue summary (RIS) that provides information on requests for alternatives to and relief from the regulatory requirements pertaining to Codes and Standards. The draft RIS also provides clarification when relief is requested by licensees and applicants where American Society of Mechanical Engineers Code requirements are determined impractical, and when proposed alternatives to the regulations are submitted to the NRC.
Sunshine Act Meeting
Document Number: 2012-21940
Type: Notice
Date: 2012-09-05
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Agency Information Collection Activities: Proposed Collection; Comment Request
Document Number: 2012-21832
Type: Notice
Date: 2012-09-05
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) invites public comment about our intention to request the OMB's approval for renewal of an existing information collection that is summarized below. We are required to publish this notice in the Federal Register under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). Information pertaining to the requirement to be submitted: 1. The title of the information collection: NRC Form 398, ``Personal Qualification StatementLicensee.'' 2. Current OMB approval number: 3150-0090. 3. How often the collection is required: Upon application for an initial or upgrade operator license and every six years for the renewal of operator or senior operator licenses. 4. Who is required or asked to report: Facility licensees who are tasked with certifying that the applicants and renewal operators are qualified to be licensed as reactor operators and senior reactor operators. 5. The number of annual respondents: 1,436. 6. The number of hours needed annually to complete the requirement or request: 3,680.25. 7. Abstract: NRC Form 398 is used to transmit detailed information required to be submitted to the NRC by a facility licensee on each applicant applying for new and upgraded licenses or license renewals to operate the controls at a nuclear reactor facility. This information is used to determine that each applicant or renewal operator seeking a license or renewal of a license is qualified to be issued a license and that the licensed operator would not be expected to cause operational errors and endanger public health and safety. Submit, by November 5, 2012, comments that address the following questions: 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? 2. Is the burden estimate accurate? 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? 4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology? The public may examine and have copied for a fee publicly available documents, including the draft supporting statement, at the NRC's Public Document Room, Room O-1F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. OMB clearance requests are available at the NRC's Web site: https://www.nrc.gov/public-involve/doc- comment/omb/. The document will be available on the NRC home page site for 60 days after the signature date of this notice. Comments submitted in writing or in electronic form will be made available for public inspection. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions you against including any information in your submission that you do not want to be publicly disclosed. Comments submitted should reference Docket No. NRC- 2012-0184. You may submit your comments by any of the following methods: Electronic comments; go to https://www.regulations.gov and search for Docket No. NRC-2012-0184. Mail comments to NRC Clearance Officer, Tremaine Donnell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Questions about the information collection requirements may be directed to the NRC's Clearance Officer, Tremaine Donnell (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone at 301-415-6258, or by email: INFOCOLLECTS.Resource@NRC.GOV.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.