Federal Highway Administration October 2016 – Federal Register Recent Federal Regulation Documents

Local Empowerment for Accelerating Projects (LEAP) Pilot Program
Document Number: 2016-25894
Type: Notice
Date: 2016-10-26
Agency: Federal Highway Administration, Department of Transportation
The Federal Highway Administration (FHWA) is announcing a pilot program to permit, on an experimental basis, direct delivery of Federal-aid funding of up to five Local Public Agencies (LPAs). These LPAs will be subject to Federal oversight, and the State DOT will be relieved of direct oversight and accountability for projects funded under the LEAP pilot program. The pilot program will be carried out for a period of 5 years (unless extended). It will be implemented in accordance with FHWA's experimental authority provided by the project flexibility authority granted under section 1420 of the Fixing America's Surface Transportation Act.
Asset Management Plans and Periodic Evaluations of Facilities Repeatedly Requiring Repair and Reconstruction Due to Emergency Events
Document Number: 2016-25117
Type: Rule
Date: 2016-10-24
Agency: Federal Highway Administration, Department of Transportation
The FHWA is issuing this final rule to address three new requirements established by the Moving Ahead for Progress in the 21st Century Act (MAP-21). First, as part of the National Highway Performance Program (NHPP), MAP-21 adopted a requirement for States to develop and implement risk-based asset management plans for the National Highway System (NHS) to improve or preserve the condition of the assets and the performance of the system. Second, for the purpose of carrying out the NHPP, MAP-21 requires FHWA to establish minimum standards for States to use in developing and operating bridge and pavement management systems. Third, to conserve Federal resources and protect public safety, MAP-21 mandates periodic evaluations to determine if reasonable alternatives exist to roads, highways, or bridges that repeatedly require repair and reconstruction activities. This rule establishes requirements applicable to States in each of these areas. The rule also reflects the passage of the Fixing America's Surface Transportation (FAST) Act, which added provisions on critical infrastructure to the asset management portion of the NHPP statute.
Notice of Final Federal Agency Actions on Proposed Highway in Utah
Document Number: 2016-25256
Type: Notice
Date: 2016-10-21
Agency: Federal Highway Administration, Department of Transportation
This notice announces actions taken by the FWHA that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to the proposed 106th South, Redwood Road to Jordan Gateway, Project in Salt Lake County in the State of Utah. These actions grant approvals for the project.
Notice of Final Federal Agency Actions on Proposed Haines Highway Reconstruction Milepost 3.9 to Milepost 25.0 in Alaska
Document Number: 2016-25284
Type: Notice
Date: 2016-10-19
Agency: Federal Highway Administration, Department of Transportation
This notice announces actions taken by FWHA that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to the proposed Haines Highway Reconstruction in the Haines Borough in the State of Alaska. Those actions grant approvals for the project.
Notice To Rescind a Notice of Intent To Prepare an Environmental Impact Statement: Los Angeles County, California
Document Number: 2016-25218
Type: Notice
Date: 2016-10-19
Agency: Federal Highway Administration, Department of Transportation
The FHWA, on behalf of the California Department of Transportation (Caltrans) is issuing this notice to advise the public that the Notice of Intent (NOI) published on October 11, 2016 (Page: 70247-70248 (2 pages), Document Number: 2016-24480) to prepare an Environmental Impact Statement (EIS) for a proposed highway project on Interstate 605 in Los Angeles County is being rescinded.
Environmental Impact Statement: Los Angeles County, California
Document Number: 2016-25216
Type: Notice
Date: 2016-10-19
Agency: Federal Highway Administration, Department of Transportation
The FHWA, on behalf of the California Department of Transportation (Caltrans), is issuing this amended notice to advise the public that a Draft Environmental Impact Statement (EIS) will be prepared for proposed highway improvements on Interstate 605 (I-605). The I-605 Corridor Improvement Project (Project) will consist of improvements on the I-605 corridor from the Interstate 10 (I-10) Interchange to the Interstate 105 (I-105) Interchange. The proposed Project also includes improvements along State Route 60 (SR-60) from Santa Anita Avenue to east of Turnbull Canyon Road, and on Interstate 5 (I-5) from Florence Avenue to Paramount Boulevard in the cities of Baldwin Park, El Monte, City of Industry, Pico Rivera, South El Monte, Whittier, Downey, Norwalk, Santa Fe Springs, and unincorporated Los Angeles County. The Project limits include the I-605/I-5 and I-605/SR- 60 corridors. These corridors were previously analyzed as separate projects; however, the Project limits along these corridors are being combined to connect logical termini. A Project Study Report-Project Development Support Study (PSR-PDS) for the I-605/I-5 corridor was approved in July 2014, and a PSR-PDS for the I-605/SR-60 corridor was approved in December 2015 (not attached).
Buy America Nationwide Waiver Notification for Commercially Available Off-the-Shelf (COTS) Products With Steel or Iron Components and for Steel Tie Wire Permanently Incorporated in Precast Concrete Products
Document Number: 2016-25116
Type: Notice
Date: 2016-10-18
Agency: Federal Highway Administration, Department of Transportation
The FHWA is proposing two nationwide waivers from the Buy America requirements for COTS products with steel or iron components and steel tie wire permanently incorporated into precast concrete products. Specialty steel or iron items, or any steel or iron item that is built to contract specification for a Federal-aid project, would remain subject to FHWA's Buy America requirements. The FHWA is requesting comments on these two proposed nationwide waivers, including the impact this proposal would have on State and local agencies administering Federal-aid projects; contractors; materials suppliers; railroads and utilities performing work related to a Federal-aid highway construction contract; and manufacturers.
Notice of Funding Opportunity for Accelerated Innovation Deployment Demonstration
Document Number: 2016-24851
Type: Notice
Date: 2016-10-14
Agency: Federal Highway Administration, Department of Transportation
This notice corrects information in the September 1, 2016, Notice of Funding Opportunity (NOFO) at 81 FR 60403 in reference to the amount of time by which a project must be authorized after applying for Accelerated Innovation Deployment (AID) Demonstration funding.
Notice of Intent To Prepare an Environmental Impact Statement for a Proposed Highway Project in Los Angeles County, California
Document Number: 2016-24480
Type: Notice
Date: 2016-10-11
Agency: Federal Highway Administration, Department of Transportation
The FHWA, on behalf of the California Department of Transportation (Caltrans), is issuing this notice to advise the public that a Draft Environmental Impact Statement (EIS) will be prepared for proposed highway improvements on Interstate 605 (I-605) and State Route 60 (SR-60). The limits of the Interstate 605 (I-605) and State Route 60 (SR-60) Improvement Project (Project) will traverse the cities of Baldwin Park, El Monte, City of Industry, Pico Rivera, South El Monte, Whittier, and unincorporated Los Angeles County. Improvements on I-605 are proposed from south of Slauson Avenue to the I-605/Interstate 10 (I-10) Interchange, and improvements on SR-60 are proposed from Santa Anita Avenue to east of Turnbull Canyon Road. A Project Study Report- Project Development Study (PSR-PDS) for the Project was approved in December 2015 (not attached).
Notice of Final Federal Agency Actions on Proposed Highway Project in Wisconsin
Document Number: 2016-23785
Type: Notice
Date: 2016-10-07
Agency: Federal Highway Administration, Department of Transportation
This notice announces actions taken by FHWA that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project, Interstate 94 (I-94) East-West Corridor, 70th Street to 16th Street, in Milwaukee County, Wisconsin. Those actions grant approvals for the project.
Notice To Rescind Notice of Intent To Prepare Environmental Impact Statement, Route 82/85/11 Corridor, New London County, Connecticut
Document Number: 2016-23934
Type: Notice
Date: 2016-10-04
Agency: Federal Highway Administration, Department of Transportation
The FHWA is issuing this notice to advise the public that FHWA is rescinding its Notice of Intent (NOI) to prepare an Environmental Impact Statement (EIS) for transportation improvements within the Connecticut Route 82/85/11 corridor in the towns of Salem, Montville, Waterford, and East Lyme, Connecticut.
Revise Notice of Intent for an Environmental Impact Statement: North-South Corridor Study: Interstate 10 to U.S. Highway 60, Pinal County, Arizona
Document Number: 2016-23784
Type: Notice
Date: 2016-10-03
Agency: Federal Highway Administration, Department of Transportation
A NOI to prepare an Environmental Impact Statement (EIS) was published in the Federal Register on September 20, 2010. The FHWA is issuing this notice to advise the public of a change to the environmental review process for the proposed North-South Corridor. The FHWA and the project sponsor, the Arizona Department of Transportation (ADOT), intend to use a tiered process in which a Tier 1 EIS will be prepared to evaluate potential corridor alternatives, along with a No- Action alternative, for a future project-specific alignment. The proposed tiering approach will allow FHWA and ADOT to evaluate a range of potential corridors within the North-South Corridor Study (NSCS) area boundaries and to broadly evaluate social, economic, and environmental impacts and mitigation approaches in the Tier 1 EIS. In addition, the NSCS area will be expanded to include an adjacent State Route 24 (SR 24) corridor study resulting in an updated study area encompassing the original study area between Interstate 10 (I-10) and U.S. Highway 60 (U.S. 60) and adding the extension of SR 24 from Ironwood Drive to the North-South Corridor in Pinal County, Arizona. The Tier 1 analysis will utilize technical data obtained thus far in the environmental review process and collect other information as required. If the Record of Decision identifies an Action (Build) corridor alternative, subsequent projects will complete a Tier 2 National Environmental Policy Act (NEPA) review where the agencies will evaluate project-level, site-specific impacts, and required mitigation and commitments.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.