Federal Highway Administration December 2008 – Federal Register Recent Federal Regulation Documents

Notice of Availability; Washington, DC
Document Number: E8-30773
Type: Notice
Date: 2008-12-29
Agency: Federal Highway Administration, Department of Transportation
The FHWA is issuing this notice to advise the public of the availability of the Final Section 4(f) Evaluation for the proposed roadway improvements proposed in conjunction with the consolidation of the Department of Homeland Security Headquarters at St. Elizabeths in Southeast Washington, DC in accordance with 49 U.S.C. 303.
Notice To Rescind a Notice of Intent To Prepare an Environmental Impact Statement: State Route 374, From State Route 13 to State Route 76 in Clarksville, Montgomery County, TN
Document Number: E8-30577
Type: Notice
Date: 2008-12-24
Agency: Federal Highway Administration, Department of Transportation
The Federal Highway Administration (FHWA) is issuing this notice to advise the public that the Notice of Intent published on November 12, 1996, at 61 FR 58094, to prepare an Environmental Impact Statement (EIS) for the proposed State Route 374, from State Route 13 to State Route 76 in Clarksville, Montgomery County, Tennessee, is being rescinded.
Notice To Rescind a Notice of Intent To Prepare an Environmental Impact Statement: North Second Street Connector Improvement, From Interstate 40 at North Second Street to U.S. 51/State Route 300, in Memphis, Shelby County, TN
Document Number: E8-30570
Type: Notice
Date: 2008-12-24
Agency: Federal Highway Administration, Department of Transportation
The Federal Highway Administration (FHWA) is issuing this notice to advise the public that the Notice of Intent published on November 7, 2002, at 67 FR 67893, to prepare a Environmental Impact Statement (EIS) for the proposed North Second Street Connector in Memphis, Shelby County, Tennessee, is being rescinded.
Highway Safety Improvement Program
Document Number: E8-30168
Type: Rule
Date: 2008-12-24
Agency: Federal Highway Administration, Department of Transportation
The purpose of this final rule is to revise Part 924 to incorporate changes to the Highway Safety Improvement Program (HSIP) that resulted from the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), as well as to reflect changes in the overall program that have evolved since the FHWA originally published 23 CFR Part 924.
Notice of Final Federal Agency Actions on Proposed Highway in Washington
Document Number: E8-30479
Type: Notice
Date: 2008-12-23
Agency: Federal Highway Administration, Department of Transportation
This notice announces actions taken by FHWA and other Federal agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to the proposed I-405, SR 169 to I-90, Renton to Bellevue Project (the Project) located in Renton, Newcastle, Bellevue and King County in the State of Washington. These actions grant licenses, permits, and approvals for the Project.
Fair Market Value and Design-Build Amendments
Document Number: E8-30147
Type: Rule
Date: 2008-12-19
Agency: Federal Highway Administration, Department of Transportation
The FHWA is revising its regulations to require State departments of transportation (DOT) and other public authorities to obtain fair market value as part of any concession agreement involving a facility acquired or constructed with Federal-aid highway funds. Additionally, the FHWA is revising its regulations to permit public agencies to compete against private entities for the right to obtain a concession agreement involving such facilities. Also, the FHWA is revising its design-build regulations to permit contracting agencies to incorporate unsuccessful offerors' ideas into a design-build contract upon the acceptance of a stipend.
Agency Information Collection Activities: Notice of Request for Renewal of Two Previously Approved Information Collections
Document Number: E8-30048
Type: Notice
Date: 2008-12-18
Agency: Federal Highway Administration, Department of Transportation
The FHWA invites public comments about our intention to request the Office of Management and Budget's (OMB) approval to renew two information collections, which are summarized below under SUPPLEMENTARY INFORMATION. We published a Federal Register Notice with a 60-day public comment period on this information collection on October 30, 2008. We are required to publish this notice in the Federal Register by the Paperwork Reduction Act of 1995.
Notice of Final Federal Agency Actions on State Highway 99 (Segment F-1) in Texas
Document Number: E8-30040
Type: Notice
Date: 2008-12-18
Agency: Federal Highway Administration, Department of Transportation
This notice announces actions taken by the FHWA and other Federal agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project, Grand Parkway (State Highway 99) Segment F-1, from United States Highway 290 (U.S. 290) to State Highway 249 (S.H. 249) in Harris County, Texas. Those actions grant licenses, permits, and approvals for the project.
Notice of Final Federal Agency Actions on Proposed Highway in Utah
Document Number: E8-29991
Type: Notice
Date: 2008-12-17
Agency: Federal Highway Administration, Department of Transportation
This notice announces actions taken by the USACE that are final within the meaning of 23 U.S.C.139(l)(1). The actions relate to a proposed highway project, I-15 Corridor, from the South Payson Interchange in Utah County, to the 12300 South Interchange in Salt Lake County, State of Utah. Those actions grant licenses, permits, and approvals for the project.
Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report
Document Number: E8-29628
Type: Notice
Date: 2008-12-15
Agency: Federal Highway Administration, Department of Transportation
Section 6005 of the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) established the Surface Transportation Project Delivery Pilot Program, codified at 23 U.S.C. 327. Section 327(g) of Title 23, United States Code mandates semiannual audits during each of the first 2 years of State participation to ensure compliance by each State participating in the Pilot Program. This notice announces and solicits comments on the second audit report for the California Department of Transportation (Caltrans).
Environmental Impact Statement: Wayne County, MI
Document Number: E8-29592
Type: Notice
Date: 2008-12-15
Agency: Federal Highway Administration, Department of Transportation
This notice clarifies the role of the DVD contained in the back cover of the Final Environmental Impact Statement (FEIS) for the Detroit River International Crossing Study (DRIC). The back cover of the FEIS contains a DVD that is not part of the FEIS and should be disregarded. It has no role in FHWA's NEPA process; and has not and will not be used in FHWA's decision-making process. This action is pursuant to the National Environmental Policy Act (NEPA) of 1969, 42 U.S.C. 4321 et seq., as amended and the Council on Environmental Quality Regulations (40 CFR parts 1500-1508).
Notice of Final Federal Agency Actions on Proposed Highway in the State of Utah
Document Number: E8-29585
Type: Notice
Date: 2008-12-15
Agency: Federal Highway Administration, Department of Transportation
This notice announces actions taken by the FHWA, and other Federal agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project, State Route (SR)-108 project from SR-127 (Antelope Drive) to SR-126 (1900 West) in the cities of Syracuse, West Point, Clinton, Roy, and West Haven, Utah in the Counties of Davis and Weber, State of Utah. Those actions grant licenses, permits, and approvals for the project.
Notice of Final Federal Agency Actions on Proposed Highway in Utah
Document Number: E8-29570
Type: Notice
Date: 2008-12-15
Agency: Federal Highway Administration, Department of Transportation
This notice announces actions taken by the FHWA that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to the proposed Mountain View Corridor project in Salt Lake and Utah Counties in the State of Utah. Those actions grant approvals for the project. The project includes both highway and transit components. FHWA has approval authority over the highway components of the project.
Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report
Document Number: E8-29021
Type: Notice
Date: 2008-12-08
Agency: Federal Highway Administration, Department of Transportation
Section 6005 of the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) established the Surface Transportation Project Delivery Pilot Program, codified at 23 U.S.C. 327. Section 327(g) of Title 23, United States Code mandates semiannual audits during each of the first 2 years of State participation to ensure compliance by each State participating in the Pilot Program. This notice announces and solicits comments on the second audit report for the California Department of Transportation (Caltrans).
Environmental Impact Statement: Wayne County, MI
Document Number: E8-28563
Type: Notice
Date: 2008-12-05
Agency: Federal Highway Administration, Department of Transportation
This notice announces the availability of a Final Environmental Impact Statement (FEIS) and Section 4(f) Evaluation for the Detroit River International Crossing Study (DRIC). This action is pursuant to the National Environmental Policy Act (NEPA) of 1969, 42 U.S.C. 4321 et seq., as amended and the Council on Environmental Quality Regulations (40 CFR parts 1500-1508). The FEIS identifies the Preferred Alternative for a new border crossing between Detroit, Michigan and Windsor, Ontario; describes the environmental impacts of the proposed project and proposed mitigation; and addresses comments received on the Draft Environmental Impact Statement and Section 4(f) Evaluation issued in February 2008.
Draft Environmental Impact Statement/Environmental Impact Report; Mid-County Parkway, Riverside County, CA
Document Number: E8-28429
Type: Notice
Date: 2008-12-01
Agency: Federal Highway Administration, Department of Transportation
The Federal Highway Administration is extending the review and comment period for the Mid-County Parkway (MCP) Draft Environmental Impact Report/Environmental Impact Statement (EIR/EIS) for an additional 30 days. Comments on the Draft EIR/EIS may now be submitted until January 8, 2009. The MCP is a proposed 32-mile roadway on new and existing alignment between State Route 79 and Interstate 15 in western Riverside County. A Notice of Availability was previously published in the Federal Register Volume 73, No. 199 on Tuesday, October 14, 2008 (FR Doc. ES-23805 Filed 10-10-08; 8:45 a.m.). The Notice of Availability includes supplemental information describing the project and the alternatives.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.