Environmental Protection Agency 2017 – Federal Register Recent Federal Regulation Documents

Results 401 - 450 of 1,524
Significant New Use Rule on Certain Chemical Substances
Document Number: 2017-21237
Type: Rule
Date: 2017-10-03
Agency: Environmental Protection Agency
EPA is finalizing a significant new use rule (SNUR) under section 5(a)(2) of the Toxic Substances Control Act (TSCA) for the chemical substance identified generically as bimodal mixture consisting of multi-walled carbon nanotubes and other classes of carbon nanotubes, which was the subject of premanufacture notice (PMN) P-11-482. This action requires persons who intend to manufacture (defined by statute to include import) or process the chemical substance for a use that is designated as a significant new use by this final rule to notify EPA at least 90 days before commencing that activity. The required notification initiates EPA's evaluation of the intended use within the applicable review period. Manufacture and processing for the significant new use is unable to commence until EPA has conducted a review of the notice, made an appropriate determination on the notice, and take such actions as are required with that determination. The required notification would provide EPA with the opportunity to evaluate the intended use and, if necessary, to prohibit or limit that activity before it occurs.
Air Plan Approval; South Carolina; Interstate Transport (Prongs 1 and 2) for the 2010 1-Hour NO2
Document Number: 2017-21121
Type: Rule
Date: 2017-10-03
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is taking final action to approve a revision to the South Carolina State Implementation Plan (SIP), submitted by the South Carolina Department of Health and Environmental Control (DHEC), on December 7, 2016, addressing the Clean Air Act (CAA) interstate transport (prongs 1 and 2) infrastructure SIP requirements for the 2010 1-hour Nitrogen Dioxide (NO2) National Ambient Air Quality Standard (NAAQS). The CAA requires that each state adopt and submit a SIP for the implementation, maintenance, and enforcement of each NAAQS promulgated by EPA, commonly referred to as an ``infrastructure SIP.'' Specifically, EPA is taking final action to approve South Carolina's December 7, 2016, SIP submission addressing prongs 1 and 2 to ensure that air emissions in the State do not significantly contribute to nonattainment or interfere with maintenance of the 2010 1-hour NO2 NAAQS in any other state.
Approval and Promulgation of Air Quality Implementation Plans; Maryland; 2011 Base Year Inventory for the 2008 8-Hour Ozone National Ambient Air Quality Standard for the Baltimore, Maryland Nonattainment Area
Document Number: 2017-21109
Type: Proposed Rule
Date: 2017-10-03
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) proposes to approve, as a state implementation plan (SIP) revision, the 2011 base year inventory for the Baltimore, Maryland moderate nonattainment area for the 2008 8-hour ozone national ambient air quality standard (NAAQS) submitted by the State of Maryland through the Maryland Department of the Environment (MDE). In the Final Rules section of this issue of the Federal Register, EPA is approving the State's SIP submittal as a direct final rule without prior proposal because the Agency views this as a noncontroversial submittal and anticipates no adverse comments. A more detailed description of the state submittal and EPA's evaluation is included in a technical support document (TSD) prepared in support of this rulemaking action. A copy of the TSD is available, upon request, from the EPA Regional Office listed in the ADDRESSES section of this document or is also available electronically within the Docket for this rulemaking action. If no adverse comments are received in response to this action, no further activity is contemplated. If EPA receives adverse comments, the direct final rule will be withdrawn and all public comments received will be addressed in a subsequent final rule based on this proposed rule. EPA will not institute a second comment period. Any parties interested in commenting on this action should do so at this time.
Approval and Promulgation of Air Quality Implementation Plans; Maryland; 2011 Base Year Inventory for the 2008 8-Hour Ozone National Ambient Air Quality Standard for the Baltimore, Maryland Nonattainment Area
Document Number: 2017-21106
Type: Rule
Date: 2017-10-03
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is taking direct final action to approve the 2011 base year inventory for the Baltimore, Maryland moderate nonattainment area for the 2008 8-hour ozone national ambient air quality standard (NAAQS). The State of Maryland submitted the emission inventory through the Maryland Department of the Environment (MDE) to meet the nonattainment requirements for moderate ozone nonattainment areas for the 2008 8-hour ozone NAAQS. EPA is approving the 2011 base year emissions inventory for the 2008 8-hour ozone NAAQS as a revision to the Maryland state implementation plan (SIP) in accordance with the requirements of the Clean Air Act (CAA).
Casmalia Resources Superfund Site; Notice of Proposed CERCLA Administrative De Minimis Settlement
Document Number: 2017-21123
Type: Notice
Date: 2017-10-02
Agency: Environmental Protection Agency
In accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, as amended (CERCLA) and the Resource Conservation and Recovery Act (RCRA), the Environmental Protection Agency (EPA) is hereby providing notice of a proposed administrative de minimis settlement concerning the Casmalia Resources Superfund Site in Santa Barbara County, California (the Casmalia Resources Site). CERCLA provides EPA with the authority to enter into administrative de minimis settlements. This settlement is intended to resolve the liabilities of the 57 settling parties identified below for the Casmalia Resources Site. These parties have also elected to resolve their liability for response costs and potential natural resource damage claims by the United States Fish and Wildlife Service (USFWS) and the National Oceanic and Atmospheric Administration (NOAA). These 57 parties sent 6,517,494 lbs. of waste to the Casmalia Resources Site, which represents 0.00114 (0.114%) of the total Site waste of 5.6 billion pounds. This settlement requires these parties to pay $590,772 to EPA.
Office of Research and Development; Ambient Air Monitoring Reference and Equivalent Methods: Designation of One New Reference Method
Document Number: 2017-21119
Type: Notice
Date: 2017-10-02
Agency: Environmental Protection Agency
Notice is hereby given that the Environmental Protection Agency (EPA) has designated one new reference method for measuring concentrations of carbon monoxide (CO) in ambient air.
Agency Information Collection Activities; Proposed Collection; Comment Request; Implementation of the 2008 Ozone National Ambient Air Quality Standards for Ozone; State Implementation Plan Requirements, EPA ICR No. 2347.03, OMB Control No. 2060-0695
Document Number: 2017-21117
Type: Notice
Date: 2017-10-02
Agency: Environmental Protection Agency
In compliance with the Paperwork Reduction Act (PRA), this document announces that the Environmental Protection Agency (EPA) is planning to submit a request to renew an existing approved Information Collection Request (ICR) 2347.02, ``Implementation of the 2008 National Ambient Air Quality Standards for Ozone,'' to the Office of Management and Budget (OMB). This existing ICR is scheduled to expire on January 31, 2018. Before submitting the ICR renewal request to OMB for review and approval, the EPA is soliciting comments on specific aspects of the proposed information collection as described below.
Fluoxastrobin; Pesticide Tolerances
Document Number: 2017-21113
Type: Rule
Date: 2017-10-02
Agency: Environmental Protection Agency
This regulation establishes tolerances for residues of fluoxastrobin in or on multiple commodities which are identified and discussed later in this document. Arysta LifeScience North America, LLC requested these tolerances under the Federal Food, Drug, and Cosmetic Act (FFDCA).
Hazardous Waste Management System; Identification and Listing of Hazardous Waste
Document Number: 2017-21112
Type: Rule
Date: 2017-10-02
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is granting a petition submitted by Samsung Austin Semiconductor (Samsung) to exclude from hazardous waste control (or delist) a certain solid waste. This final rule responds to the petition submitted by Samsung to have the copper filter cake from the electroplating process excluded, or delisted from the definition of a hazardous waste. The Copper filter cake is listed as F006, wastewater treatment sludges from electroplating operations. The basis of the listing is cadmium, hexavalent chromium, nickel, and cyanide (complexed). After careful analysis and evaluation of comments submitted by the public, the EPA has concluded that the petitioned wastes are not hazardous waste when disposed of in Subtitle D landfills. This exclusion applies to the copper filter cake generated at Samsung Austin Semiconductor's Austin, Texas facility. Accordingly, this final rule excludes the petitioned waste from the requirements of hazardous waste regulations under the Resource Conservation and Recovery Act (RCRA) when disposed of in Subtitle D landfills, but imposes testing conditions to ensure that the future-generated wastes remain qualified for delisting.
Notice of Final NPDES General Permit; Final NPDES General Permit for New and Existing Sources and New Dischargers in the Offshore Subcategory of the Oil and Gas Extraction Category for the Western Portion of the Outer Continental Shelf of the Gulf of Mexico (GMG290000)
Document Number: 2017-21108
Type: Notice
Date: 2017-10-02
Agency: Environmental Protection Agency
The Director of the Water Division, EPA Region 6 today provides notice that the National Pollutant Discharge Elimination System (NPDES) General Permit No. GMG290000 for existing and new sources and new dischargers in the Offshore Subcategory of the Oil and Gas Extraction Point Source Category, located in and discharging to the Outer Continental Shelf offshore of Louisiana and Texas was reissued on September 19, 2017, with an effective date of October 1, 2017. The discharge of produced water to that portion of the Outer Continental Shelf from Offshore Subcategory facilities located in the territorial seas of Louisiana and Texas is also authorized by this permit.
Approval and Promulgation of Implementation Plans; New Mexico; Albuquerque and Bernalillo County; Regional Haze Progress Report State Implementation Plan
Document Number: 2017-21006
Type: Proposed Rule
Date: 2017-10-02
Agency: Environmental Protection Agency
Pursuant to the Federal Clean Air Act (CAA or the Act), the Environmental Protection Agency (EPA) is proposing to approve a revision to a State Implementation Plan (SIP) for the City of Albuquerque and Bernalillo County, New Mexico (the County) submitted by the Governor on June 24, 2016. The SIP revision addresses requirements of the Act and the EPA's rules that require the County to submit a periodic report assessing reasonable progress goals (RPGs) for regional haze with a determination of the adequacy of the existing regional haze SIP.
EPA Smart Sectors Program Launch
Document Number: C1-2017-20310
Type: Notice
Date: 2017-09-29
Agency: Environmental Protection Agency
Approval of Implementation Plans; State of Iowa; Elements of Infrastructure SIP Requirements for the 2010 Sulfur Dioxide National Ambient Air Quality Standard (NAAQS)
Document Number: 2017-20965
Type: Proposed Rule
Date: 2017-09-29
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is proposing to approve elements of a State Implementation Plan (SIP) submission from the State of Iowa for the 2010 Sulfur Dioxide (SO2) National Ambient Air Quality Standard (NAAQS). Infrastructure SIPs address the applicable requirements of Clean Air Act (CAA) section 110, which requires that each state adopt and submit a SIP for the implementation, maintenance, and enforcement of each new or revised NAAQS promulgated by the EPA. These SIPs are commonly referred to as ``infrastructure'' SIPs. The infrastructure requirements are designed to ensure that the structural components of each state's air quality management program are adequate to meet the state's responsibilities under the CAA. In the ``Rules and Regulations'' section of this issue of the Federal Register, we are approving the state's SIP revisions as a direct final rule without a prior proposed rule. If we receive no adverse comment, we will not take further action on this proposed rule.
Approval of Implementation Plans; State of Iowa; Elements of the Infrastructure SIP Requirements for the 2010 Sulfur Dioxide National Ambient Air Quality Standard (NAAQS)
Document Number: 2017-20964
Type: Rule
Date: 2017-09-29
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is taking direct final action to approve elements of a State Implementation Plan (SIP) submission, and an amended SIP submission from the State of Iowa for the 2010 Sulfur Dioxide (SO2) National Ambient Air Quality Standard (NAAQS). Infrastructure SIPs address the applicable requirements of Clean Air Act (CAA) section 110, which requires that each state adopt and submit a SIP for the implementation, maintenance, and enforcement of each new or revised NAAQS promulgated by the EPA. These SIPs are commonly referred to as ``infrastructure'' SIPs. The infrastructure requirements are designed to ensure that the structural components of each state's air quality management program are adequate to meet the state's responsibilities under the CAA.
Approval of California Air Plan Revisions; Anti-Idling Regulations
Document Number: 2017-20963
Type: Proposed Rule
Date: 2017-09-29
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is proposing to approve a revision to the California State Implementation Plan (SIP). This revision concerns emissions of volatile organic compounds (VOCs), oxides of nitrogen (NOX) and particulate matter (PM) from the idling of diesel-powered trucks. We are proposing to approve portions of a state rule to regulate these emission sources under the Clean Air Act (CAA or the Act). We are taking comments on this proposal and plan to follow with a final action.
Environmental Impact Statements; Notice of Availability
Document Number: 2017-20938
Type: Notice
Date: 2017-09-29
Agency: Environmental Protection Agency
Approval and Promulgation of Air Quality Implementation Plans; Maryland; Nonattainment New Source Review Requirements for the 2008 8-Hour Ozone Standard
Document Number: 2017-20837
Type: Proposed Rule
Date: 2017-09-29
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) proposes to approve the state implementation plan (SIP) revision submitted by the Maryland Department of the Environment (MDE) on behalf of the State of Maryland in response to EPA's February 3, 2017 Findings of Failure to Submit for various requirements relating to the 2008 8-hour ozone national ambient air quality standards (NAAQS). This SIP revision is specific to nonattainment new source review (NNSR) requirements. In the Final Rules section of this Federal Register, EPA is approving the State's SIP submittal as a direct final rule without prior proposal because the Agency views this as a noncontroversial submittal and anticipates no adverse comments. A detailed description of the state submittal and EPA's evaluation is included in a technical support document (TSD) prepared in support of this rulemaking action. A copy of the TSD is available, upon request, from the EPA Regional Office listed in the ADDRESSES section of this document or is also available electronically within the Docket for this rulemaking action. If no adverse comments are received in response to this action, no further activity is contemplated. If EPA receives adverse comments, the direct final rule will be withdrawn and all public comments received will be addressed in a subsequent final rule based on this proposed rule. EPA will not institute a second comment period. Any parties interested in commenting on this action should do so at this time.
Approval and Promulgation of Air Quality Implementation Plans; Maryland; Nonattainment New Source Review Requirements for the 2008 8-Hour Ozone Standard
Document Number: 2017-20834
Type: Rule
Date: 2017-09-29
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is taking direct final action to approve a revision to the State of Maryland's state implementation plan (SIP). The revision is in response to EPA's February 3, 2017 Findings of Failure to Submit for various requirements relating to the 2008 8-hour ozone national ambient air quality standards (NAAQS). This SIP revision is specific to nonattainment new source review (NNSR) requirements. EPA is approving this revision in accordance with the requirements of the Clean Air Act (CAA).
Interstate Transport of Fine Particulate Matter: Revision of Federal Implementation Plan Requirements for Texas
Document Number: 2017-20832
Type: Rule
Date: 2017-09-29
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is finalizing withdrawal of the federal implementation plan (FIP) provisions that require affected electricity generating units (EGUs) in Texas to participate in Phase 2 of the Cross-State Air Pollution Rule (CSAPR) trading programs for annual emissions of sulfur dioxide (SO2) and nitrogen oxides (NOX). Withdrawal of the FIP requirements is intended to address a decision of the U.S. Court of Appeals for the District of Columbia Circuit (D.C. Circuit) remanding the CSAPR Phase 2 SO2 budget for Texas to the EPA for reconsideration. With this action, the EPA is also determining that, following withdrawal of the FIP requirements, sources in Texas do not contribute significantly to nonattainment in, or interfere with maintenance by, any other state with regard to the 1997 national ambient air quality standard (NAAQS) for fine particulate matter (PM2.5). Accordingly, we are also determining that the EPA has no obligation to issue new FIP requirements for Texas sources to address transported PM2.5 pollution under Clean Air Act (CAA) section 110(a)(2)(D)(i)(I) with regard to that NAAQS. Finally, the EPA is also affirming the continued validity of the Agency's 2012 determination that participation in CSAPR meets the Regional Haze Rule's criteria for an alternative to the application of source- specific best available retrofit technology (BART). The EPA has determined that changes to CSAPR's geographic scope resulting from the actions EPA has taken or expects to take in response to the D.C. Circuit's remand do not affect the continued validity of participation in CSAPR as a BART alternative, because the changes in geographic scope would not have adversely affected the results of the air quality modeling analysis upon which the EPA based the 2012 determination.
Approval of Iowa Air Quality Implementation Plans; Elements of the Infrastructure SIP Requirements for the 2012 Annual Fine Particulate Matter (PM2.5
Document Number: 2017-20829
Type: Rule
Date: 2017-09-29
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is taking direct final action to approve elements of a State Implementation Plan (SIP) submission, for the 2012 Annual Fine Particulate Matter (PM2.5) National Ambient Air Quality Standard (NAAQS). Infrastructure SIPs address the applicable requirements of Clean Air Act (CAA) section 110, which requires that each state adopt and submit a SIP for the implementation, maintenance, and enforcement of each new or revised NAAQS promulgated by the EPA. These SIPs are commonly referred to as ``infrastructure'' SIPs. The infrastructure requirements are designed to ensure that the structural components of each state's air quality management program are adequate to meet the state's responsibilities under the CAA.
Approval of Iowa Air Quality Implementation Plans; Elements of the Infrastructure SIP Requirements for the 2012 Annual Fine Particulate Matter (PM2.5
Document Number: 2017-20825
Type: Proposed Rule
Date: 2017-09-29
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is proposing to approve elements of a State Implementation Plan (SIP) submission from the State of Iowa for the 2012 Annual Fine Particulate Matter (PM2.5) National Ambient Air Quality Standard (NAAQS). Infrastructure SIPs address the applicable requirements of Clean Air Act (CAA) section 110, which requires that each state adopt and submit a SIP for the implementation, maintenance, and enforcement of each new or revised NAAQS promulgated by the EPA. These SIPs are commonly referred to as ``infrastructure'' SIPs. The infrastructure requirements are designed to ensure that the structural components of each state's air quality management program are adequate to meet the state's responsibilities under the CAA. In the ``Rules and Regulations'' section of this issue of the Federal Register, we are approving the state's SIP revisions as a direct final rule without a prior proposed rule. If we receive no adverse comment, we will not take further action on this proposed rule.
Approval and Promulgation of Implementation Plans; New York; Regional Haze Five-Year Progress Report State Implementation Plan
Document Number: 2017-20823
Type: Rule
Date: 2017-09-29
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is approving New York's regional haze progress report, submitted on June 16, 2015, as a revision to its State Implementation Plan (SIP). New York's SIP revision addresses requirements of the Clean Air Act and the EPA's rules that require each state to submit periodic reports describing progress towards reasonable progress goals established for regional haze and a determination of the adequacy of the state's existing regional haze SIP. The EPA is approving New York's determination that the State's regional haze SIP is adequate to meet these reasonable progress goals for the first implementation period which extends through 2018.
Approval and Promulgation of Implementation Plans; New Jersey; Regional Haze Five-Year Progress Report State Implementation Plan
Document Number: 2017-20821
Type: Rule
Date: 2017-09-29
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is approving New Jersey's regional haze progress report, submitted on June 28, 2016, as a revision to its State Implementation Plan (SIP). New Jersey's SIP revision addresses requirements of the Clean Air Act and the EPA's rules that require each state to submit periodic reports describing progress towards reasonable progress goals established for regional haze and a determination of the adequacy of the state's existing regional haze SIP. The EPA is approving New Jersey's determination that the State's regional haze SIP is adequate to meet these reasonable progress goals for the first implementation period which extends through 2018.
Proposed Information Collection Request; Comment Request; Annual Public Water Systems Compliance Report
Document Number: 2017-20434
Type: Notice
Date: 2017-09-29
Agency: Environmental Protection Agency
The Environmental Protection Agency is planning to submit an information collection request (ICR), ``Annual Public Water System Compliance Report'' (EPA ICR No. 1812.06, OMB Control No. 2020-0020) to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act. Before doing so, EPA is soliciting public comments on specific aspects of the proposed information collection as described below. This is a proposed extension of the ICR, which is currently approved through April 30, 2018. An Agency may not conduct or sponsor and a person is not required to respond to a collection of information unless it displays a currently valid OMB control number.
Air Plan Approval; North Carolina Miscellaneous Rules
Document Number: 2017-20325
Type: Rule
Date: 2017-09-29
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is approving several changes to the North Carolina State Implementation Plan (SIP) submitted by the State of North Carolina, through the North Carolina Department of Environmental Quality (NCDEQ), on December 14, 2004, and March 1, 2016. The March 1, 2016, submission adds a new rule to the ``Exclusionary Rules'' of the North Carolina SIP, and the portion of the December 14, 2004, submission EPA is approving adds two new rules under a new section called ``Permit Exemptions.'' This action is being taken pursuant to the Clean Air Act (CAA or Act).
Protection of Stratospheric Ozone: Refrigerant Management Regulations for Small Cans of Motor Vehicle Refrigerant
Document Number: 2017-20840
Type: Rule
Date: 2017-09-28
Agency: Environmental Protection Agency
EPA is taking direct final action to correct an editing oversight that led to a potential conflict in a prior rulemaking as to whether or not containers holding two pounds or less of non-exempt substitute refrigerants for use in motor vehicle air conditioning that are not equipped with a self-sealing valve can be sold to persons that are not certified technicians, provided those small cans were manufactured or imported prior to January 1, 2018. This action clarifies that those small cans may continue to be sold to persons that are not certified as technicians under sections 608 or 609 of the Clean Air Act.
Protection of Stratospheric Ozone: Refrigerant Management Regulations for Small Cans of Motor Vehicle Refrigerant
Document Number: 2017-20838
Type: Proposed Rule
Date: 2017-09-28
Agency: Environmental Protection Agency
EPA is proposing this action to correct an editing oversight that lead to a potential conflict in a prior rulemaking as to whether or not containers holding two pounds or less of non-exempt substitute refrigerants for use in motor vehicle air conditioning that are not equipped with a self-sealing valve can be sold to persons that are not certified technicians, provided those small cans were manufactured or imported prior to January 1, 2018. This action clarifies that those small cans may continue to be sold to persons that are not certified as technicians under sections 608 or 609 of the Clean Air Act. In the ``Rules and Regulations'' section of this Federal Register, EPA is publishing this action as a direct final rule without a prior proposed rule. If we receive no adverse comment, we will not take further action on this proposed rule.
Approval and Promulgation of Air Quality Implementation Plans; Virginia; Removal of Clean Air Interstate Rule (CAIR) Trading Programs
Document Number: 2017-20724
Type: Rule
Date: 2017-09-28
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is taking direct final action to approve a state implementation plan (SIP) revision submitted by the Commonwealth of Virginia. The submitted revision requests EPA remove from the Virginia SIP regulations from the Virginia Administrative Code that established EPA-administered trading programs under the Clean Air Interstate Rule (CAIR), one of which also included requirements to address nitrogen oxide (NOX) reductions required under the NOX SIP Call. The EPA-administered trading programs under CAIR were discontinued on December 31, 2014 upon the implementation of the Cross-State Air Pollution Rule (CSAPR), which was promulgated by EPA to replace CAIR. CSAPR established federal implementation plans (FIPs) for 23 states, including Virginia. The SIP submittal seeks removal from the Virginia SIP of Virginia regulations that implemented the CAIR annual NOX, ozone season NOX, and sulfur dioxide (SO2) trading programs (as CSAPR has replaced CAIR). EPA is approving the SIP revision in accordance with the requirements of the Clean Air Act (CAA).
Approval and Promulgation of Air Quality Implementation Plans; Virginia; Removal of Clean Air Interstate Rule (CAIR) Trading Programs
Document Number: 2017-20723
Type: Proposed Rule
Date: 2017-09-28
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) proposes to approve the state implementation plan (SIP) revision submitted by the Commonwealth of Virginia for the purpose of removing regulations from the Virginia SIP that established EPA-administered annual NOX, ozone season NOX, and sulfur dioxide (SO2) trading programs under the Clean Air Interstate Rule (CAIR). These EPA-administered trading programs under CAIR were discontinued on December 31, 2014 upon the implementation of the Cross- State Air Pollution Rule (CASPR), which was promulgated by EPA to replace CAIR. In the Final Rules section of this Federal Register, EPA is approving the State's SIP submittal as a direct final rule without prior proposal because the Agency views this as a noncontroversial submittal and anticipates no adverse comments. A detailed rationale for the approval is set forth in the direct final rule. If no adverse comments are received in response to this action, no further activity is contemplated. If EPA receives adverse comments, the direct final rule will be withdrawn and all public comments received will be addressed in a subsequent final rule based on this proposed rule. EPA will not institute a second comment period. Any parties interested in commenting on this action should do so at this time.
Approval and Promulgation of Implementation Plans; Enhanced Monitoring; California
Document Number: 2017-20722
Type: Rule
Date: 2017-09-28
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is taking final action to approve a State Implementation Plan (SIP) revision submitted by the State of California on November 10, 1993. This SIP revision concerns the establishment of a Photochemical Assessment Monitoring System (PAMS) network in six ozone nonattainment areas within California. The EPA is taking this action under the Clean Air Act based on the conclusion that all applicable statutory and regulatory requirements related to PAMS SIP revisions have been met.
Air Plan Approval; New Hampshire; Nonattainment Plan for the Central New Hampshire SO2
Document Number: 2017-20721
Type: Proposed Rule
Date: 2017-09-28
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is proposing to approve the State Implementation Plan (SIP) revision that the State of New Hampshire submitted to EPA on January 31, 2017 for attaining the 1- hour sulfur dioxide (SO2) primary national ambient air quality standard (NAAQS) for the Central New Hampshire Nonattainment Area. This plan (herein called a ``nonattainment plan'') includes New Hampshire's attainment demonstration and other elements required under the Clean Air Act (CAA). In addition to an attainment demonstration, the nonattainment plan addresses the requirement for meeting reasonable further progress (RFP) toward attainment of the NAAQS, reasonably available control measures and reasonably available control technology (RACM/RACT), base-year and projection-year emission inventories, and contingency measures. As a part of approving the attainment demonstration, EPA is also proposing to approve SO2 emission limits and associated compliance parameters for Merrimack Station into the New Hampshire SIP. EPA proposes to conclude that New Hampshire has appropriately demonstrated that the nonattainment plan provisions provide for attainment of the 2010 1-hour primary SO2 NAAQS in the Central New Hampshire Nonattainment Area by the applicable attainment date and that the nonattainment plan meets the other applicable requirements under the CAA.
Phosphoric Acid Manufacturing and Phosphate Fertilizer Production Risk and Technology Review Reconsideration
Document Number: 2017-20171
Type: Rule
Date: 2017-09-28
Agency: Environmental Protection Agency
This action finalizes amendments to the National Emission Standards for Hazardous Air Pollutants (NESHAP) for the Phosphoric Acid Manufacturing and Phosphate Fertilizer Production source categories. These final amendments are in response to two petitions for reconsideration filed by industry stakeholders on the rule revisions to the NESHAP for the Phosphoric Acid Manufacturing and Phosphate Fertilizer Production source categories that were promulgated on August 19, 2015. We are revising the compliance date by which affected sources must include emissions from oxidation reactors when determining compliance with the total fluoride emission limits for superphosphoric acid (SPA) process lines. In addition, we are revising the compliance date for the monitoring requirements for low-energy absorbers. We are also clarifying one option and adding a new option, to the monitoring requirements for low-energy absorbers.
Certain New Chemicals; Receipt and Status Information for June 2017
Document Number: 2017-20749
Type: Notice
Date: 2017-09-27
Agency: Environmental Protection Agency
EPA is required under the Toxic Substances Control Act (TSCA) to publish in the Federal Register a notice of receipt of a premanufacture notice (PMN); an application for a test marketing exemption (TME), both pending and/or expired; and a periodic status report on any new chemicals under EPA review and the receipt of notices of commencement (NOC) to manufacture those chemicals. This document covers the period from June 1, 2017 to June 30, 2017.
Fluazifop-P-Butyl; Pesticide Tolerances
Document Number: 2017-20748
Type: Rule
Date: 2017-09-27
Agency: Environmental Protection Agency
This regulation establishes tolerances for residues of fluazifop-p-butyl in or multiple commodities which are identified and discussed later in this document. Interregional Research Project Number 4 (IR-4) requested these tolerances under the Federal Food, Drug, and Cosmetic Act (FFDCA).
Oxathiapiprolin; Pesticide Tolerance
Document Number: 2017-20747
Type: Rule
Date: 2017-09-27
Agency: Environmental Protection Agency
This regulation establishes a tolerance for residues of the fungicide oxathiapiprolin in or on cacao bean, dried bean. Interregional Research Project Number 4 (IR-4) requested the tolerance under the Federal Food, Drug, and Cosmetic Act (FFDCA).
Certain New Chemicals; Receipt and Status Information for July 2017
Document Number: 2017-20727
Type: Notice
Date: 2017-09-27
Agency: Environmental Protection Agency
EPA is required under the Toxic Substances Control Act (TSCA) to publish in the Federal Register a notice of receipt of a premanufacture notice (PMN); an application for a test marketing exemption (TME), both pending and/or expired; and a periodic status report on any new chemicals under EPA review and the receipt of notices of commencement (NOC) to manufacture those chemicals. This document covers the period from July 3, 2017 to July 31, 2017.
Air Plan Approval; Delaware; State Implementation Plan for Interstate Transport for the 2008 Ozone Standard
Document Number: 2017-20599
Type: Proposed Rule
Date: 2017-09-27
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) proposes to approve a portion of the state implementation plan (SIP) revision submitted by the State of Delaware that pertains to the interstate transport requirements of the Clean Air Act (CAA) for the 2008 ozone national ambient air quality standards (NAAQS). In the Final Rules section of this issue of the Federal Register, EPA is approving the State's SIP submittal as a direct final rule without prior proposal because the Agency views this as a noncontroversial submittal and anticipates no adverse comments. A detailed rationale for the approval is set forth in the direct final rule. If no adverse comments are received in response to this action, no further activity is contemplated. If EPA receives adverse comments, the direct final rule will be withdrawn and all public comments received will be addressed in a subsequent final rule based on this proposed rule. EPA will not institute a second comment period. Any parties interested in commenting on this action should do so at this time.
Air Plan Approval; Delaware; State Implementation Plan for Interstate Transport for the 2008 Ozone Standard
Document Number: 2017-20598
Type: Rule
Date: 2017-09-27
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is taking direct final action to approve a portion of a state implementation plan (SIP) revision submitted by the State of Delaware. The Clean Air Act's (CAA) good neighbor provision requires EPA and states to address the interstate transport of air pollution that affects the ability of downwind states to attain and maintain the national ambient air quality standards (NAAQS). Specifically, the good neighbor provision requires each state in its SIP to prohibit emissions that will significantly contribute to nonattainment, or interfere with maintenance, of a NAAQS in a downwind state. Delaware has submitted a SIP revision that addresses the interstate transport requirements, among other things, for the 2008 ozone NAAQS. EPA has determined that Delaware's SIP has adequate provisions to prohibit the state from significantly contributing to nonattainment, or interfering with maintenance, of the 2008 ozone NAAQS in any other state. EPA is approving Delaware's SIP revision submittal in regards to the good neighbor interstate transport provision in accordance with the requirements of the CAA.
Extension of Public Comment Period for the Draft Updated Aquatic Life Ambient Water Quality Criteria for Aluminum in Freshwater
Document Number: 2017-20597
Type: Notice
Date: 2017-09-26
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is extending the comment period for the Draft Updated Aquatic Life Ambient Water Quality Criteria for Aluminum in Freshwater. The current comment period closes on September 26, 2017. The public comment period will be extended for an additional 30 days.
Approval and Promulgation of State Plans for Designated Facilities and Pollutants: Colorado, Montana, North Dakota, South Dakota, Utah, and Wyoming; Negative Declarations
Document Number: 2017-20595
Type: Rule
Date: 2017-09-26
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is taking final action to approve 20 negative declarations for four designated facility classes in all Region 8 states. First, the EPA is approving negative declarations from Colorado, Montana, North Dakota, South Dakota and Wyoming for existing small municipal waste combustor (MWC) units. Second, the EPA is approving negative declarations from Colorado, Montana, North Dakota, South Dakota, Utah and Wyoming for existing large MWC units. Third, the EPA is approving negative declarations from Montana, South Dakota, Utah and Wyoming for existing commercial and industrial solid waste incineration (CISWI) units. Fourth, the EPA is approving negative declarations from Montana, North Dakota, South Dakota, Utah and Wyoming for existing other solid waste incineration (OSWI) units. Each of the negative declaration letters approved in this final rulemaking action is a certified statement from the issuing state that there are no existing designated facilities of the source category specified in the negative declaration, within the jurisdiction of that state, which would require the development of a Clean Air Act (CAA) section 111(d)/129 state plan. These approved negative declarations will serve in lieu of a state plan unless a previously unknown facility falling under these particular emissions guidelines is identified and development of a state plan becomes necessary.
Access to Confidential Business Information by Eastern Research Group (ERG)
Document Number: 2017-20594
Type: Notice
Date: 2017-09-26
Agency: Environmental Protection Agency
EPA will authorize its contractor, Eastern Research Group (ERG) to access Confidential Business Information (CBI) which has been submitted to EPA under the authority of all sections of the Resource Conservation and Recovery Act (RCRA) of 1976, as amended. EPA has issued regulations that outline business confidentiality provisions for the Agency and require all EPA Offices that receive information designated by the submitter as CBI to abide by these provisions.
Approval and Promulgation of Implementation Plans; Louisiana; Regional Haze State Implementation Plan
Document Number: 2017-20533
Type: Proposed Rule
Date: 2017-09-26
Agency: Environmental Protection Agency
Pursuant to the Federal Clean Air Act (CAA or the Act), the Environmental Protection Agency (EPA) is amending our recent proposal to approve a revision to the Louisiana State Implementation Plan (SIP) for regional haze submitted for parallel processing on August 24, 2017. On July 13, 2017, we proposed to approve a SIP revision by the State of Louisiana through the Louisiana Department of Environmental Quality (LDEQ) to address certain Best Available Retrofit Technology requirements under Regional Haze for the Entergy R. S. Nelson facility (Nelson), which is an electric generating unit in Calcasieu Parish. We now amend that proposal, by proposing to approve a compliance date three years from the effective date of the final EPA approval of the SIP revision for Nelson to meet an emission limit for sulfur dioxide (SO2) emissions.
Finding of Failure To Submit State Implementation Plans Required for the 2008 8-Hour Ozone NAAQS; California; Sacramento Metro
Document Number: 2017-20445
Type: Rule
Date: 2017-09-26
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is taking final action finding that the state of California has failed to submit State Implementation Plans (SIPs) to satisfy certain requirements of the Clean Air Act (CAA) for the 2008 8-hour ozone National Ambient Air Quality Standards (NAAQS or ``standards''). Under the CAA and EPA's implementing regulations, states with nonattainment areas classified as Moderate, Serious, Severe or Extreme were required to submit by July 20, 2016, SIPs demonstrating reasonable further progress (RFP) and attainment of the 2008 8-hour ozone standard as expeditiously as practicable but no later than the applicable dates established in the implementing regulations. States were also required to submit contingency plans to be triggered if attainment or RFP milestones were not met. The EPA is by this action making a finding of failure to submit attainment demonstration, attainment demonstration contingency, RFP, and RFP contingency SIPs for the Sacramento Metro nonattainment area. If the EPA has not affirmatively found that the state has submitted the required plans within 18 months, the offset sanction applies in the area. If within 6 additional months the EPA has still not affirmatively determined that the state has submitted the required plan, the highway funding sanction applies in the area. No later than 2 years after the EPA makes the finding, if the state has not submitted, and EPA has not approved, the required SIP, the EPA must promulgate a Federal Implementation Plan.
Air Plan Approval; Minnesota; Prevention of Significant Deterioration
Document Number: 2017-20443
Type: Rule
Date: 2017-09-26
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is approving a revision to the Minnesota State Implementation Plan (SIP) submitted on October 4, 2016. EPA is approving the state's Prevention of Significant Deterioration (PSD) rules which incorporate the Federal PSD rules by reference.
EPA Smart Sectors Program Launch
Document Number: 2017-20310
Type: Notice
Date: 2017-09-26
Agency: Environmental Protection Agency
The U.S. Environmental Protection Agency (EPA) is announcing the Smart Sectors program in the Office of Policy. Based on the successful EPA Sector Strategies program, EPA's Smart Sectors program will re-examine how EPA engages with industry in order to reduce unnecessary regulatory burden, create certainty and predictability, and improve the ability of both EPA and industry to conduct long-term regulatory planning while also protecting the environment and public health.
National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Vancouver Water Station #1 Superfund Site
Document Number: 2017-20449
Type: Proposed Rule
Date: 2017-09-25
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) Region 10 is issuing a Notice of Intent to Delete the Vancouver Water Station #1 Contamination Superfund Site (Site) located in Vancouver, Washington, from the National Priorities List (NPL) and requests public comments on this proposed action. The NPL, promulgated pursuant to section 105 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The EPA and the State of Washington, through the Department of Ecology have determined that all appropriate response actions under CERCLA, have been completed. However, this deletion does not preclude future actions under Superfund.
National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Vancouver Water Station #4 Superfund Site
Document Number: 2017-20448
Type: Proposed Rule
Date: 2017-09-25
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) Region 10 is issuing a Notice of Intent to Delete the Vancouver Water Station #4 Contamination Superfund Site (Site) located in Vancouver, Washington, from the National Priorities List (NPL) and requests public comments on this proposed action. The NPL, promulgated pursuant to section 105 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The EPA and the State of Washington, through the Department of Ecology have determined that all appropriate response actions under CERCLA, have been completed. However, this deletion does not preclude future actions under Superfund.
Ambient Air Monitoring Reference and Equivalent Methods: Designation of Three New Reference Methods
Document Number: 2017-20447
Type: Notice
Date: 2017-09-25
Agency: Environmental Protection Agency
Notice is hereby given that the Environmental Protection Agency (EPA) has designated three new reference methods for measuring concentrations of PM2.5, PM10, and PM10-2.5 in the ambient air.
Approval and Promulgation of Plans for Designated Facilities; New Jersey; Delegation of Authority
Document Number: 2017-20440
Type: Rule
Date: 2017-09-25
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is approving a request from the New Jersey Department of Environmental Protection (NJDEP) for delegation of authority to implement and enforce the Federal plan for Sewage Sludge Incineration (SSI) units. On April 29, 2016, the EPA promulgated the Federal plan for SSI units to fulfill the requirements of the Clean Air Act. The Federal plan addresses the implementation and enforcement of the emission guidelines applicable to existing SSI units located in areas not covered by an approved and currently effective state plan. The Federal plan imposes emission limits and other control requirements for existing affected SSI facilities which will reduce designated pollutants. On January 24, 2017, the NJDEP signed a Memorandum of Agreement which is intended to be the mechanism for the transfer of authority between the EPA and the NJDEP and defines the policies, responsibilities and procedures pursuant to the Federal plan for existing SSI units.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.