Environmental Protection Agency October 25, 2011 – Federal Register Recent Federal Regulation Documents
Results 1 - 4 of 4
Agency Information Collection Activities; Proposed Collection; Comment Request
In compliance with the Paperwork Reduction Act (PRA) (44 U.S.C. 3501 et seq.), this document announces that EPA is planning to submit a request to renew an existing approved Information Collection Request (ICR) to the Office of Management and Budget (OMB). This ICR, entitled: ``Recordkeeping and Reporting Requirements for Allegations of Significant Adverse Reactions to Human Health or the Environment (TSCA Section 8(c))'' and identified by EPA ICR No. 1031.10 and OMB Control No. 2070-0017, is scheduled to expire on August 31, 2012. Before submitting the ICR to OMB for review and approval, EPA is soliciting comments on specific aspects of the proposed information collection.
Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery and Reinvestment Act of 2009 (ARRA) to the Borough of Ocean Gate, NJ
The EPA is hereby granting a project waiver of the Buy American requirements of ARRA Section 1605 under the authority of Section 1605(b)(2) [manufactured goods are not produced in the United States in sufficient and reasonably available quantities and of a satisfactory quality] to the Borough of Ocean Gate, New Jersey (Borough), for the purchase of a foreign manufactured 50 kW wind turbine generator that meets the Borough's design and performance specifications. This is a project specific waiver and only applies to the use of the specified product for the ARRA project being proposed. Any other ARRA project that may wish to use the same product must apply for a separate waiver based on project specific circumstances. Based upon information submitted by the Borough and its consulting engineer, EPA has concluded that there are currently no domestic manufactured 50 kW wind turbines available in sufficient and reasonable quantity and of a satisfactory quality to meet the Borough's project design and performance specifications, and that a waiver is justified. The Regional Administrator is making this determination based on the review and recommendations of the State Revolving Fund Program Team. The Assistant Administrator of the Office of Administration and Resources Management has concurred on this decision to make an exception to Section 1605(a) of ARRA. This action permits the purchase of a foreign manufactured 50 kW wind turbine generator by the Borough, as specified in its June 6, 2011 waiver request.
Approval and Promulgation of Air Quality Implementation Plans; Missouri; Reasonably Available Control Technology (RACT) for the 8- Hour Ozone National Ambient Air Quality Standard (NAAQS)
EPA is proposing to conditionally approve a State Implementation Plan (SIP) revision submitted by the State of Missouri to EPA on January 17, 2007, with a supplemental revision submitted to EPA on June 1, 2011. The purpose of these SIP revisions is to satisfy the RACT requirements for volatile organic compounds (VOCs) set forth by the Clean Air Act (CAA or Act) with respect to the 8-hour ozone NAAQS. In addition to proposing approval on the 2007 submission, EPA is also proposing to approve several VOC rules adopted by Missouri and submitted to EPA in a letter dated August 16, 2011 for approval into its SIP. We are approving these revisions because they enhance the Missouri SIP by improving VOC emission controls in Missouri. EPA's proposal to conditionally approve the SIP submittal is consistent with section 110(k)(4) of the CAA. As part of the conditional approval, Missouri would have up to twelve months from the date of EPA's final conditional approval of the SIP revisions in which to revise its rules to be consistent with the CAA.
Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment Request; Application for Reimbursement to Local Governments for Emergency Response to Hazardous Substance Releases Under CERCLA Section 123 (Renewal)
In compliance with the Paperwork Reduction Act (PRA)(44 U.S.C. 3501 et seq.), this document announces that an Information Collection Request (ICR) has been forwarded to the Office of Management and Budget (OMB) for review and approval. This is a request to renew an existing approved collection. The ICR, which is abstracted below, describes the nature of the information collection and its estimated burden and cost.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.