Engineers Corps 2006 – Federal Register Recent Federal Regulation Documents

Results 51 - 100 of 117
Availability of a Supplement to the Draft Environmental Impact Statement for the Proposed Construction of a Dredged Material Containment Facility in the Patapsco River, at Masonville, Baltimore City, MD
Document Number: 06-5918
Type: Notice
Date: 2006-06-30
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In accordance with requirements of the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers (USACE), Baltimore District, has prepared a Draft Environmental Impact Statement (DEIS) for the proposed construction of a dredged material containment facility (DMCF) by the Maryland Port Administration (MPA). This DEIS was prepared as part of the submission of MPA's application for a Department of the Army permit to construct the facility in the Patapsco River, Baltimore City, MD. This application will be evaluated pursuant to Section 10 or the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act. The preferred alternative is for the construction of a stone, sand, and cofferdam structure that would impact approximately 131 acres of waters of the United States, including jurisdictional wetlands. The structure would be initially constructed to 10 feet above the mean lowe low water (MLLW) elevation, with a future temporary elevation to 42 feet above MLLW, and an ultimate elevation of 36 feet above MLLW. The project would also include mechanical dredging of approximately 1.7 million cubic yards of overburden material within the footprint of the proposed disposal site, and the placement of this material at the Hart Miller Island disposal site, Baltimore County, MD. On-site and off-site borrow material would be used for the construction of the containment facility. This proposal was advertised in the Federal Register on May 19, 2006 (71 FR 29128). The need to prepare a Supplement is due to the applicant's proposal to change the source of borrow material for the proposed construction of the preferred alternative. The applicant wishes to use suitable material dredged from the channel at the Seagirt Marine Terminal for the construction of a portion of the containment structure. Approximately 0.5 to 0.8 million cubic yards of sand and gravel obtained from dredging to a maximum of 54 feet below mean low water at Seagirt Marine Terminal would be used at the proposed Masonville DMCF. Detailed description of the proposed modifications and effects to the human environment are discussed in the supplement to the DEIS for the Masonville DMCF.
Intent To Prepare Draft Environmental Impact Statement for the Proposed Implementation of Interim Water Storage Contracts Associated With the Southeastern Federal Power Customers Settlement Agreement, at Lake Sidney Lanier/Buford Dam, GA
Document Number: 06-5444
Type: Notice
Date: 2006-06-16
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (Corps), Mobile District, intends to prepare a Draft Environmental Impact Statement (EIS), as required by the National Environmental Policy Act (NEPA), to address the proposed implementation of interim water storage contracts at Lake Sidney Lanier/Buford Dam, GA, as contained in a settlement agreement associated with the Southeastern Federal Power Customers, Inc. (SeFPC) v. Secretary of the Army, et al. (1:00CV02954-TPJ) lawsuit. The Draft EIS will also address any changes in water management operations at the reservoir project, as well as the potential for other changes to operations in downstream reservoir projects, which would result from implementation of the settlement agreement.
Availability of the Draft Environmental Impact Statement for the White River Minimum Flow Reallocation Study, AR
Document Number: C6-5057
Type: Notice
Date: 2006-06-14
Agency: Department of Defense, Federal Communications Commission, Agencies and Commissions, Department of Homeland Security, Department of the Army, Corps of Engineers, Customs and Border Protection, Engineers Corps, Army Department
Intent To Prepare a Draft Supplement to the Environmental Impact Statement to Evaluate Construction of Authorized Improvements to the Federal Pascagoula Harbor Navigation Project in Jackson County, MS
Document Number: 06-5385
Type: Notice
Date: 2006-06-14
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The Mobile District, U.S. Army Corps of Engineers (Corps), intends to prepare a Draft Supplement to the Environmental Impact Statement (DSEIS) to address the potential impacts associated with construction of authorized improvements to the Federal Pascagoula Harbor Navigation Project in Jackson County, MS. The DSEIS will be used as a basis for ensuring compliance with the National Environmental Policy Act (NEPA) and evaluating the following two alternative plans: ``No Action'' and widening and deepening to the authorized project dimensions. Construction of some of the authorized improvements was completed in 1999. Remaining authorized elements which will be evaluated include widening the Gulf Entrance channel from 450 feet to 550 feet wide and deepening the Upper Pascagoula channel from 38 feet to 42 feet deep.
Notice of Availability of Draft Environmental Impact Statement for the Floyd County, KY (Levisa Fork Basin), Section 202 Project
Document Number: 06-5339
Type: Notice
Date: 2006-06-13
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The comment period for the Draft Environmental Impact Statement for the Floyd County, KY (Levisa Fork Basin), Section 202 Project published in the Federal Register on Friday, May 5, 2006 (71 FR 26478), required comments be submitted 45 days (June 19, 2006) following publication in the Federal Register. The comment period has been extended to 60 days (July 5, 2006).
Inland Waterways Users Board
Document Number: 06-5337
Type: Notice
Date: 2006-06-13
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In accordance with 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the forthcoming meeting.
Intent to Prepare a Supplement to the Final Environmental Statement for the Area VI (Elm Fork of the North Fork of the Red River) Portion of the Red River Chloride Control Project, Texas and Oklahoma
Document Number: 06-5336
Type: Notice
Date: 2006-06-13
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The purpose of the Supplement to the Final Environmental Statement (SFES) is to address alternatives and modifications to the authorized plan for chloride control at Area VI on the Elm Fork of the North Fork of the Red River, OK.
Intent To Prepare a Draft Environmental Impact Statement (DEIS) for Millington and Vicinity, Tennessee
Document Number: 06-5317
Type: Notice
Date: 2006-06-13
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The Millington, Tennessee and Vicinity Feasibility Study will be conducted to analyze problems being experienced in the Big Creek drainage basin and evaluate alternatives to provide plans for ecosystem restoration, flood damage reduction, and recreation. National Ecosystem Restoration (NER) benefits will be evaluated with respect to the net change in habitat quantity and/or quality and expressed quantitatively in physical units and indices, but not monetary units. If justified, the feasibility study and EIS will recommend a plan.
Intent To Hold a North Dakota River Task Force Meeting as Established by the Missouri River Protection and Improvement Act of 2000 (Title VII)
Document Number: 06-5275
Type: Notice
Date: 2006-06-12
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The duties of the Task Force are to prepare and approve a plan for the use of the funds made available under Title VII to promote conservation practices in the Missouri River watershed, control and remove the sediment from the Missouri River, protect recreation on the Missouri River from sedimentation and protect Indian and non-Indian historical and cultural sites along the Missouri River from erosion.
Availability of the Final Supplemental Environmental Impact Statement for the Boston Harbor Inner Harbor Maintenance Dredging Project
Document Number: 06-5058
Type: Notice
Date: 2006-06-02
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers, New England District has prepared a Final Supplemental Environmental Impact Statement to maintenance dredge the following Federal navigation channels: The Main Ship Channel upstream of Spectacle Island to the Inner Confluence, the upper Reserved Channel, the approach to the Navy Dry Dock, a portion of the Mystic River, and a portion of the Chelsea River (previously permitted) in Boston Harbor, MA. Maintenance dredging of the navigation channels landward of Spectacle Island is needed to remove shoals and restore the Federal navigation channels to their authorized depths. Materials dredged from the Federal channels will either be disposed at the Massachusetts Bay Disposal Site (for the material suitable for unconfined open water disposal) or, for the material not suitable for unconfined open water disposal, in confined aquatic disposal (CAD) cell(s). Major navigation channel improvements (deepening) were made in 1999 through 2001 in the Reserved Channel, the Mystic River, Inner Confluence and the Chelsea River. A Final EIS prepared for this previous navigation improvement project in June of 1995 identified selected use of CAD cells in the Mystic River, Inner Confluence, and Chelsea River were investigated. A new CAD cell for the proposed maintenance project will be constructed in the Mystic River and in the Main Ship Channel just below the Inner Confluence.
Availability of the Draft Environmental Impact Statement for the White River Minimum Flow Reallocation Study, AR
Document Number: 06-5057
Type: Notice
Date: 2006-06-02
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
Pursuant to section 102(2)(c) of the National Environmental Policy Act (NEPA) of 1969 (as amended), the U.S. Army Corps of Engineers (USACE), Little Rock District, has prepared a Draft Environmental Impact Statement (DEIS) for the proposed implementation of the White River Minimum Flow, Arkansas. This DEIS is being made available for a 45-day public comment period.
Notice of Availability of a Draft Integrated System Investment Plan and Programmatic Environmental Impact Statement for the Ohio River Mainstem System Study
Document Number: C6-4884
Type: Notice
Date: 2006-06-01
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
Notice of Availability of a Draft Integrated System Investment Plan and Programmatic Environmental Impact Statement for the Ohio River Mainstem System Study
Document Number: 06-4884
Type: Notice
Date: 2006-05-26
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
a. Pursuant to the National Environmental Policy Act (NEPA), the Great Lakes and Ohio River Division of the U.S. Army Corps of Engineers (Corps) is seeking comments on a draft System Investment Plan and Programmatic Environmental Impact Statement (SIP/PEIS) that evaluates alternative investment strategies for the maintenance of commercial navigation infrastructure along with the ecosystem sustainability needs on the Ohio River System for the next 60 years. b. The primary purpose of the Ohio River Mainstem Systems Study (ORMSS) is to develop the best SIP for maintaining safe, environmentally sustainable, and reliable navigation on the Ohio River over a 60-year period from 2010 to 2070. The study evaluated the operation and maintenance, rehabilitation, and construction reinvestment needs at the 19 navigation lock and dam sites on the Ohio River Mainstem. The study reports on five plans for meeting these needs based on five different traffic forecast scenarios. The future reliable operation of these structures is critical to the continued growth in commercial navigation throughout the Ohio River basin. In response to stakeholder input, the study purpose was modified to include the identification of measures to improve ecological sustainability to provide a balance between economic and environmental improvements. c. In order to facilitate review, the Corps will be conducting six public meetings along the Ohio River to solicit comments on its proposed plan. (See SUPPLEMENTARY INFORMATION for dates, times and locations). d. The Corps will be providing copies of the SIP/PEIS at numerous locations for review by the public. (See SUPPLEMENTARY INFORMATION for locations). e. The review and comment period for this draft document will be 60 days.
Intent To Prepare a Real Estate Supplement/Third Supplemental Environmental Impact Statement (RES/SEIS) to the Final SEIS on Modified Water Deliveries to Everglades National Park, Tamiami Trail Feature, Miami-Dade County, FL, November 2005
Document Number: 06-4883
Type: Notice
Date: 2006-05-26
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In November 2005, the Jacksonville District, U.S. Army Corps of Engineers (Corps) issued a Final 2nd Supplemental Environmental Impact Statement (SEIS) for the Tamiami Trail feature of the Modified Water Deliveries (MWD) project to Everglades National Park in Miami- Dade County, FL. That SEIS assumed that the National Park Service (NPS) would acquire the necessary real estate interests in seven privately- owned parcels of land adjacent to the south side of Tamiami Trail to avoid flooding impacts after the Tamiami Trail project was constructed and ecosystem restoration water flows were directed south into Everglades National Park. It is now concluded that the NPS will be unable to complete the acquisition of real estate rights in time to meet the overall schedule of the MWD project. The Corps now proposes to take over responsibility for the acquisition and address the related impacts in a supplement to the previous SEIS.
Intent to Prepare a Draft Environmental Impact Statement for Residential, Commercial, and Marine Development Along the Gulf Intracoastal Waterway
Document Number: 06-4881
Type: Notice
Date: 2006-05-26
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The Mobile District, U.S. Army Corps of Engineers (Corps), intends to prepare a Draft Environmental Impact Statement (DEIS) to address the potential impacts associated with mixed-use waterfront development along the Gulf Intracoastal Waterway (GIWW) in Baldwin County, AL, specifically the stretch known as the ``Foley Land Cut''. The Corps will be evaluating 14 separate permit applications for the proposed work under the authority of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. The EIS will be used as a basis for ensuring compliance with the National Environmental Policy Act (NEPA).
Compensatory Mitigation for Losses of Aquatic Resources
Document Number: E6-7837
Type: Proposed Rule
Date: 2006-05-23
Agency: Department of Defense, Environmental Protection Agency, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
On March 28, 2006, the U.S. Army Corps of Engineers (the Corps) and the Environmental Protection Agency (EPA) published a proposed rule to revise regulations governing compensatory mitigation for activities authorized by permits issued by the Department of the Army. The Corps and EPA announce the extension of the public comment period for this proposed rule until June 30, 2006. The 30-day extension of the comment period is a result of requests from a number of entities to allow more time to comment on the proposed rule. Comments previously submitted need not be resubmitted, as they have already been incorporated into the public record and will be fully considered in the final rule.
Availability of Partially Exclusive, Exclusive or Non Exclusive License
Document Number: Z6-7331
Type: Notice
Date: 2006-05-19
Agency: Department of Defense, Employee Benefits Security Administration, Department of Labor, Department of Energy, Federal Aviation Administration, Department of Transportation, Management and Budget Office, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
Notice of Availability of the Final Environmental Impact Statement for the Proposed Everglades Agricultural Area (EAA) A-1 Reservoir located in Palm Beach County, FL
Document Number: E6-7644
Type: Notice
Date: 2006-05-19
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (USACE) is issuing this notice to advise the public that a Final Environmental Impact Statement (FEIS) has been completed and is available for review and comment.
Exchange of Government Property at Devens Reserve Forces Training Area to MassDevelopment for Future Development
Document Number: E6-7643
Type: Notice
Date: 2006-05-19
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In accordance with 10 United States Code 2869, the Department of the Army intends to enter into an Exchange Agreement with MassDevelopment for the exchange of 13.57+/- acres of Government owned land at Devens Reserve Forces Training Area, Devens, Massachusetts, in exchange for renovations to several buildings at Devens Reserve Forces Training Area. The purpose of this notice is to effect the exchange pursuant to provisions of 10 U.S.C. 2869. This is a partial transfer of the entire acreage located at the facility. Additional information is on file with the U.S. Army Engineer District, Corps of Engineers, Louisville, Kentucky.
Intent To Prepare a Draft Environmental Impact Statement for the Seven Oaks Dam Water Quality Study, San Bernadino County, CA
Document Number: 06-4685
Type: Notice
Date: 2006-05-19
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
With the construction of Seven Oaks Dam, during and immediately after storm events, water flows into the pool of water impounded behind the dam may be turbid. Once water is impounded behind the dam, all water flowing in the Santa Ana River that enters Seven Oaks Reservoir must pass through that impoundment before being released at the dam. To the extent that water impounded behind the dam can have a higher level of sediment or algae than water flowing in the Santa Ana River below the Southern California Edison (SCE) No. 1 Powerhouse, the quality of water released from Seven Oaks Dam into the Santa Ana River may be reduced. The purpose of the study is to evaluate the potential impacts, if any, of the Seven Oaks Dam regarding downstream water quality and to characterize upstream water quality. This will entail characterization of the water quality conditions that existed prior to dam construction and determination of how or whether the dam has contributed to water quality impairment as part of the ``baseline conditions analysis''. After the analysis, future studies would be determined with the resource agencies, Local Sponsors, and Stakeholders.
Availability of Draft Environmental Impact Statement for the Proposed Construction of a Dredged Material Containment Facility in the Patapsco River, at Masonville, Baltimore City, MD
Document Number: 06-4683
Type: Notice
Date: 2006-05-19
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In accordance with requirements of the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers (USACE), Baltimore District, has prepared a Draft Environmental Impact Statement (DEIS) for the proposed construction of a dredged material containment facility (DMCF) by the Maryland Port Administration (MPA). This DEIS was prepared as part of the submission of MPA's application for a Department of the Army permit to construct the facility in the Patapsco River, Baltimore City, MD. This application will be evaluated pursuant to section 10 or the Rivers and Harbors Act of 1899 and section 404 of the Clean Water Act. The preferred alternative is for the construction of a stone, sand, and cofferdam structure that would impact approximately 131 acres of waters of the United States, including jurisdictional wetlands. The structure would be initially constructed to 10 feet above the mean lower low water (MLLW) elevation, with a future temporary elevation to 42 feet above MLLW, and an ultimate elevation of 36 feet above MLLW. The project would also include mechanical dredging of approximately 1.7 million cubic yards of overburden material within the footprint of the proposed disposal site, and the placement of this material at the Hart Miller Island disposal site, Baltimore County, MD. Hydraulic dredging of approximately 1.5 million cubic yards of sand would be performed, and the sand used to construct the outer portion of the containment structure. Approximately 0.5 million cubic yards of clay is to be mechanically/hydraulically dredged and placed on the inside of this structure. Two new spillway structures and discharge outfalls are to be included in the construction of the DMCF. Other work associated with the construction of the DMCF is the relocation of a city water main line and storm drain systems, and the relocation of a commercial mooring buoy. The total proposed footprint of the proposed project is 141 acres.
Availability of Partially Exclusive, Exclusive or Non Exclusive License
Document Number: E6-7331
Type: Notice
Date: 2006-05-15
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The Department of the Army, U.S. Army Corps of Engineers, announces the general availability of partially exclusive, exclusive or non exclusive licenses under the following pending patents listed under SUPPLEMENTARY INFORMATION. Any license granted shall comply with 35 U.S.C. 209 and 37 CFR part 404.
Intent to Prepare a Draft Environmental Impact Statement for the Neuse River Basin Feasibility Study, NC
Document Number: 06-4512
Type: Notice
Date: 2006-05-15
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The Neuse River Basin is the third largest basin in North Carolina, encompassing a total area of about 6,235 square miles. The Neuse River originates in north central North Carolina and flows southeasterly until it reaches tidal waters of Pamlico Sound. Water quality in the Neuse River Basin has become degraded from multiple causes, including: Rapidly expanding urban growth with increasingly rapid runoff from storm events; deforestation; expanding high-density livestock operations; and aging wastewater infrastructure. Fish and wildlife populations have suffered declines in diversity and vigor; and waterborne fish diseases have now become apparent, especially Pfiesteria. The U.S. Army Corps of Engineers, Wilmington District, in cooperation with the State of North Carolina Division of Water Resources has initiated the Neuse River Basin Feasibility Study in North Carolina. The purpose of the feasibility study is to develop and evaluate basin wide alternatives to improve water quality, restore anadromous fish passage, wetlands, stream, riparian buffer, and oyster habitat. We will also investigate flood damage reduction. The focus of this study is to identify resource problems, needs, and opportunities and develop solutions. The feasibility study is being carried out under the Corps of Engineers General Investigation Program and is being conducted in response to a congressional resolution adopted July 23, 1997.
Intent to Prepare an Environmental Impact Statement for the Dam Safety Assurance Evaluation Report, Dover Dam, City of Dover, Tuscarawas County, OH
Document Number: C6-4234
Type: Notice
Date: 2006-05-11
Agency: Department of Defense, Employee Benefits Security Administration, Department of Labor, Environmental Protection Agency, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
Intent To Prepare a Supplemental Environmental Impact Statement to the Interim Operational Plan for Protection of the Cape Sable Seaside Sparrow, Everglades National Park, Miami-Dade County, FL, May 2002
Document Number: 06-4241
Type: Notice
Date: 2006-05-05
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In 1999, the U.S. Fish and Wildlife Service issued a Final Biological Opinion for the Modified Water Deliveries to Everglades National Park Project (MWD Project), the C-111 Project, and the Experimental Water Deliveries to Everglades National Park Project. FWS concluded that the operations, if continued, would likely jeopardize the continued existence of the endangered Cape Sable seaside sparrow and adversely modify its critical habitat. In response, the Corps implemented an Interim Structural and Operational Plan (ISOP) in March 2000, followed by the Interim Operating Plan (IOP) in July 2002. These operations were designed to protect the sparrow pending completion of construction of the MWD Project and the C-111 Project. Because of the urgency to implement IOP in time for the next sparrow breeding season, the IOP Final Environmental Impact Statement (FEIS) was completed prior to conclusion of modeling that supported the selected plan. Pursuant to a March 2006 order by the United States District Court for the Southern District of Florida, the Corps will be preparing a supplement to the IOP FEIS. The Supplemental Environmental Impact Statement (SEIS) will update the FEIS with the modeling for the selected alternative, which was completed in November 2002, as well as actual data collected since the May 2002 FEIS. In addition the SEIS will update its analysis of the default condition for the reservoirs.
Notice of Availability of Draft Environmental Impact Statement for the Floyd County, KY (Levisa Fork Basin), Section 202 Project
Document Number: 06-4235
Type: Notice
Date: 2006-05-05
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
Pursuant to the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers, DoD. Huntington District has prepared a Draft Environmental Impact Statement (DEIS) which documents planning analyses undertaken for a proposed flood damage reduction projects in the Levisa Fork basin in Floyd County, KY. The study area includes the incorporation areas of Prestonsburg and unincorporated areas in Floyd County which are subject to flood damage from the potential of a reoccurrence of the April 1977 flood. The study area does not include the City of Martin, KY where a separate flood damage reduction project is underway. The DEIS documents agency evaluation of four alternatives, two of which includes floodwall/levee alignments intended to protect Prestonsburg and non-structure flood-proofing measures, a total non- structural alternative, and the No Federal Action alternative.
Intent To Prepare an Environmental Impact Statement for the Dam Safety Assurance Evaluation Report, Dover Dam, City of Dover, Tuscarawas County, OH
Document Number: 06-4234
Type: Notice
Date: 2006-05-05
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
Pursuant to the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers (Corps), Huntington District will prepare an Environmental Impact Statement (EIS) to disclose potential impacts to the natural, physical, and human environment resulting from modifications to Dover Dam. This high hazard dam does not conform to current design standards related to stability and sliding during a probable maximum flood. Modifications will be performed so the Dam will meet these standards.
Notice of Availability of the Final Environmental Impact Statement, Dated April 2006, for Commercial Sand and Gravel Dredging Operations in the Allegheny and Ohio Rivers, PA
Document Number: E6-6622
Type: Notice
Date: 2006-05-02
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers, Pittsburgh District (Corps) is issuing this notice to advise the public that a final Environmental Impact Statement (EIS) has been completed and is available for review in compliance with the National Environmental Policy Act (NEPA). The overall purpose of the EIS is to evaluate the environmental consequences for issuing of Section 10 and 404 permits for Commercial Sand and Gravel Dredging in the Allegheny River (River Miles 0-69.5) and the Ohio River (River Miles 0-40).
Upper Columbia Alternative Flood Control and Fish Operations, Libby and Hungry Horse Dams, MT
Document Number: E6-6532
Type: Notice
Date: 2006-05-01
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (Corps), Seattle District, announces the availability of the Final Environmental Impact Statement (FEIS) for Upper Columbia Alternative Flood Control and Fish Operations. The U.S. Bureau of Reclamation (Reclamation) is a cooperating agency for this FEIS. The document describes and analyzes the environmental impacts of alternative flood control operations at Libby Dam on the Kootenai River and at Hungry Horse Dam on the South Fork Flathead River. Both dams are located in northwestern Montana. The overall goal of the FEIS is to evaluate effects of alternative dam operations to provide better reservoir and flow conditions at and below Libby and Hungry Horse Dams for anadromous and resident fish listed as threatened or endangered under the Endangered Species Act (ESA), consistent with authorized project purposes, including maintaining the current level of flood control benefits. Two new alternatives for Libby Dam were added in the FEIS and the Corps is particularly interested in any comments on those alternatives which are described in Section 2.2 and evaluated in Section 3.3 of the FEIS.
Navigation Regulations
Document Number: 06-4064
Type: Rule
Date: 2006-05-01
Agency: Department of Defense, Corps of Engineers, Department of the Army, Engineers Corps, Army Department
The Corps is amending the regulations for lockage operations at Bonneville Lock and Dam and amending the regulations which establish the restricted areas at Little Goose Lock and Dam. The Corps is making corrections and adjustments to the lockage control, signals, and permissible dimensions of vessels for Bonneville Lock and Dam. These changes correct language for the new replacement lock. For the Little Goose Lock and Dam the Corps is making adjustments in the upstream channel restricted area boundary to provide a recreational craft corridor along the north shoreline. This will provide better boat ramp access in support of the small craft portage route and reduce interference between fishermen and the boat ramp.
Intent To Prepare an Environmental Impact Statement for Pine Mountain Dam & Lake Project, AR
Document Number: 06-4061
Type: Notice
Date: 2006-05-01
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
Pursuant to the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers (USACE), Little Rock District will prepare an Environmental Impact Statement (EIS) for the proposed Pine Mountain Dam and Lake Project, AR. The purpose of the EIS will be to present alternatives and assess the impacts to the human environment associated with providing flood control, recreation and water supply for the surrounding areas in Arkansas and Oklahoma from the proposed project. The study area includes the entire Lee Creek watershed together with the lower Lee Creek reservoir near Van Buren, AR. The proposed project could affect agriculture, recreation, flood control, water supply and natural resources within the study area. The EIS will evaluate potential impacts (positive and negative) to the natural, physical, and human environment as a result of implementing any of the proposed project alternatives that may be developed during the EIS process.
Intent to Prepare a Joint Environmental Impact Statement/Environmental Impact Report for the San Francisquito Creek Study, San Mateo and Santa Clara Counties, CA
Document Number: C6-3458
Type: Notice
Date: 2006-04-14
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
Intent To Prepare a Joint Environmental Impact Statement/Environmental Impact Report for the San Francisquito Creek Study, San Mateo and Santa Clara Counties, CA
Document Number: 06-3458
Type: Notice
Date: 2006-04-11
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
Pursuant to section 102(2)(c) of the National Environmental Policy Act (NEPA) of 1969 as implemented by the Council on Environmental Quality regulations (40 CFR parts 1500-1508), the California Environmental Quality Act (CEQA), and Public Law 102-484 section 2834, as amended by Public Law 104-106 section 2867, the Department of the Army and the San Francisquito Creek Joint Powers Authority (SFCJPA) hereby give notice of intent to prepare a joint Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the San Francisquito Creek Project in San Mateo and Santa Clara Counties, CA to consider opportunities to reduce both fluvial and tidal flooding, to reduce the threat to public safety due to flooding and to restore ecosystem quality and function, where possible. The U.S. Army Corps of Engineers (Corps) is the lead agency for this project under NEPA. The SFCJPA is the lead agency for this project under CEQA. A public scoping meeting will be held to solicit comments on the environmental scope of the project and the appropriate scope of the joint EIS/EIR.
Intent To Prepare an Environmental Impact Statement for the Proposed TransAlta Pit 7 Mine Completion Project at Centralia, Washington
Document Number: E6-5083
Type: Notice
Date: 2006-04-07
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers Seattle District (Corps) and the Washington State Department of Ecology (Ecology) will serve as joint lead agencies in the preparation of an environmental impact statement (EIS) pursuant to the National Environmental Policy Act (NEPA) and State Environmental Policy Act (SEPA) to evaluate proposed approaches to TransAlta Centralia Mining LLC's (TCM) completion of mining in Pit 7, a current mining operation at its Centralia Mine. The Corps will use the EIS in making its decision whether to issue a Section 404 permit under the Clean Water Act. Ecology will use the EIS in making its decision whether to issue a Section 401 Water Quality Certification under the Clean Water Act.
Supplemental Notice of Intent To Prepare a Draft Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for a Permit Application for the Berths 136-147 Terminal Improvement Project, Also Known as the TraPac Container Terminal in the Port of Los Angeles, Los Angeles County, CA
Document Number: E6-4904
Type: Notice
Date: 2006-04-06
Agency: Department of Defense, Corps of Engineers, Department of the Army, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (Corps) Los Angeles District in conjunction with the Los Angeles Harbor Department (Port) is examining the feasibility of waterside, terminal and transportation improvements at Berths 136-147 in the Port of Los Angeles. The Corps is considering the Port's application for a Department of the Army permit under Clean Water Act section 404 and River and Harbor Act section 10 to conduct dredge and fill activities and construct one new wharf approximately 705 feet and seismically upgrade two wharves approximately 3,022 feet in length associated with the proposed project. Major project elements to be covered in the Draft EIS/EIR include: wharf construction and landside improvements. The landside developments will include expansion, redevelopment and construction of marine terminal facilities, and transportation infrastructure improvements including construction of grade separations, and potential realignment of road and railways. The primary Federal involvement is the discharge of dredge and/or fill materials within waters of the United States, work (e.g. dredging) and structures in or affecting navigable waters of the United States, and potential impacts on the human environment from such activities. Therefore, in accordance with the National Environmental Policy Act (NEPA), the Corps is requiring the preparation of an Environmental Impact Statement (EIS) prior to rendering a final decision on the Port's permit application. The Corps may ultimately make a determination to permit or deny the above project or permit or deny modified versions of the above project. Pursuant to the California Environmental Quality Act (CEQA), the Port will serve as Lead Agency for the Preparation of an Environmental Impact Report (EIR). The Corps and the Port have agreed to jointly prepare a Draft EIS/EIR for the improvements at Berth 136-147 in order to optimize efficiency and avoid duplication. The Draft EIS/EIR is intended to be sufficient in scope to address both the Federal and the state and local requirements and environmental issues concerning the proposed activities and permit approvals.
Intent To Prepare a Draft Supplement to the Environmental Impact Statement To Evaluate Construction of Authorized Improvements to the Federal Gulfport Harbor Navigation Project in Harrison County, MS
Document Number: 06-3146
Type: Notice
Date: 2006-03-31
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The Mobile District, U.S. Army Corps of Engineers (Corps), intends to prepare a Draft Supplement to the Environmental Impact Statement (DSEIS) to address the potential impacts associated with construction of authorized improvements to the Federal Gulfport Harbor Navigation Project in Harrison County, MS. The DSEIS will be used as a basis for ensuring compliance with the National Environmental Policy Act (NEPA) and evaluating the following two alternative plans: ``No Action'' and widening to the authorized project dimensions. Gulfport Harbor is authorized to (a) A channel 38 feet deep by 400 feet wide and about 8 miles long across Ship Island Bar; (b) a channel 36 feet deep by 300 feet wide and about 12 miles long through Mississippi Sound; and (c) a stepped anchorage basin at Gulfport Harbor 32 to 36 feet deep by 1,120 feet wide and 2,640 feet long.
Availability of a Draft Environmental Impact Statement To Consider Issuance of a Department of the Army Permit Pursuant to Section 404 of the Clean Water Act for Mingo Logan Coal Company's (Mingo Logan) Proposal To Construct and Operate Spruce No. 1 Mine, Near Blair in Logan County, WV
Document Number: 06-3144
Type: Notice
Date: 2006-03-31
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In accordance with the requirements of the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers (USACE) Huntington District, in cooperation with U.S. Environmental Protection Agency, the U.S. Fish and Wildlife Service, the Office of Surface Mining and the West Virginia Department of Environmental Protection, has prepared a Draft Environmental Impact Statement (DEIS). This DEIS evaluates potential impacts to the natural, physical and human environment as a result of the proposed mining activities associated with Mingo Logan Coal Company's (Mingo Logan) Spruce No. 1 Mine. The USACE regulates this proposed project pursuant to Section 404 of the Clean Water Act. The proposed activity would involve the discharge of dredged and fill material into waters of the United States associated with the proosed construction and operation of a surface bituminous coal mine.
Notice of Intent To Prepare a Joint Environmental Impact Statement/Environmental Impact Report for the Proposed BNSF Cajon Subdivision Third Main Track Project Keenbrook to Summit, San Bernardino County, CA
Document Number: 06-3143
Type: Notice
Date: 2006-03-31
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The Los Angeles District intends to prepare a joint Environmental Impact Statement/Environmental Impact Report (EIS/EIR) to analyze the environmental effects of, and support the permit decision related to, the proposed construction of a third main track through a 15.9 mile section of the Cajon Subdivision, between Keenbrook (the southerly entrance to Cajon Pass) and Summit. The third track would be constructed on either the east or the west side of the existing tracks, depending on constraints at any given location, and would parallel the western/northern track alignment (Main Track 1), between Cajon and Summit. The purpose of the EIS/EIR is to evaluate alternative approaches to increase sustainable daily capacity of train movement along the portion of the mainline through Cajon Pass to meet demand for freight movement for the present and the future. The benefits of the additional third main track include increasing operational flexibility, increasing operational efficiency, reducing severe congestion during peak travel periods, and allowing for sufficiently frequent movements of trains and goods through the Cajon Pass. Alternatives include the addition of a third main track adjacent to the existing BNSF Main 1 through Cajon Pass with the installation of retaining walls and improvements to culverts and wildlife linkages; construction of a third main track within the existing BNSF right-of-way without environmentally sensitive design features; and the No Action/No Federal Action Alternative. The EIS/EIR will analyze the potential direct, indirect and cumulative impacts of the environmental range of alternatives, including the proposed project.
Intent To Prepare a Draft Environmental Impact Statement for Elliott Bay Seawall, WA
Document Number: 06-3140
Type: Notice
Date: 2006-03-31
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
Pursuant to section 102(2)(C) of the National Environmental Policy Act (NEPA) of 1969, as amended, the U.S. Army Corps of Engineers (Corps) will prepare an environmental impact statement (EIS) for a proposed seawall rehabilitation project along the Elliott Bay shoreline in Seattle, WA. The seawall, known as the Alaskan Way Seawall, is experiencing significant decay and deterioration, leading to structural instability along the Seattle waterfront and central business district. Seawall structural instability is putting a tremendous amount of public and private infrastructure, development, and transportation linkages at risk of damage due to wave and tidal erosion, and hence potential for undermining and collapse. In addition, the failure of the seawall would result in a high risk to public safety and substantial environmental degradation. The purpose of the proposed rehabilitation effort is to protect the public facilities and economic activities along the Elliott Bay shoreline from storm damages associated with failure of the existing seawall.
Coastal Engineering Research Board (CERB)
Document Number: C6-2859
Type: Notice
Date: 2006-03-30
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
Compensatory Mitigation for Losses of Aquatic Resources
Document Number: 06-2969
Type: Proposed Rule
Date: 2006-03-28
Agency: Department of Defense, Environmental Protection Agency, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (the Corps) and the Environmental Protection Agency (EPA) are proposing to revise regulations governing compensatory mitigation for activities authorized by permits issued by the Department of the Army. The proposed regulations are intended to establish performance standards and criteria for the use of permittee-responsible compensatory mitigation and mitigation banks, and to improve the quality and success of compensatory mitigation projects for activities authorized by Department of the Army permits. The proposed regulations are also intended to account for regional variations in aquatic resource types, functions, and values, and apply equivalent standards to each type of compensatory mitigation to the maximum extent practicable. The proposed rule includes a watershed approach to improve the quality and success of compensatory mitigation projects in replacing losses of aquatic resource functions, services, and values resulting from activities authorized by Department of the Army permits. We are proposing to require in-lieu fee programs, after a five-year transition period, to meet the same standards as mitigation banks.
Intent to Prepare an Environmental Impact Statement for the Chesapeake Bay Oyster Recovery Project, Virginia and Maryland
Document Number: 06-2863
Type: Notice
Date: 2006-03-24
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (Corps), Baltimore (NAB) issued a notice of intent (NOI) for the Chesapeake Bay Native Oyster Recovery Project in the Friday, November 26, 2004 issue of the Federal Register (69 FR 68887). That NOI indicated that NAB would prepare a draft environmental impact statement (DEIS) for native oyster (Crassostrea virginica) recovery activities within Maryland waters of the Chesapeake Bay. The Corps is announcing a major change in the scope of the project. The NAB and Norfolk (NAO) Districts will prepare a single, integrated master plan (MP) and programmatic environmental impact statement (PEIS) for native oyster recovery in the entire Chesapeake Bay. This MP is a long-term plan for native oyster recovery and will be written in cooperation with the local sponsors, the Maryland Department of Natural Resources and Virginia Marine Resources Commission. The Corps is undertaking native oyster recovery in the Chesapeake Bay to support efforts to reverse the ongoing decline in oyster resources throughout the Bay.
Intent to Prepare a Supplemental Environmental Impact Statement 2.0 for the Lower Mud River Watershed Project, Milton, Cabell County, WV
Document Number: 06-2862
Type: Notice
Date: 2006-03-24
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
Pursuant to the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers (Corps), Huntington District will prepare a Supplemental Environmental Impact Statement (SEIS). The SEIS will evaluate potential impacts to the natural, physical, and human environment as a result of utilizing soil borrow material for construction of the selected plan for the proposed flood damage reduction measures for the area at the City of Milton, Cabell County, WV (lower Mud River Project). The Corps is soliciting public concerns/ issues to be evaluated during the study process.
Public Scoping Meeting and Preparation of Draft Environmental Impact Statement for Widening and Deepening of the Matagorda Ship Channel in Calhoun County and Matagorda County, TX
Document Number: 06-2861
Type: Notice
Date: 2006-03-24
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers, Galveston District intends to prepare a Draft Environmental Statement (DEIS) to assess the social, economic and environmental effects of the proposed widening and deepening of the Matagorda Ship Channel. The DEIS will assess potential impacts of a range of alternatives, including the No Action and preferred alternatives. The Federal action is consideration of a Department of Army Permit application for work under section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403), section 404 of the clean Water Act (33 U.S.C. 1344), and section 102 of the Marine Protection Research and Sanctuary Act (33 U.S.C. 1412).
Coastal Engineering Research Board (CERB)
Document Number: 06-2859
Type: Notice
Date: 2006-03-24
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In accordance with Section 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the following committee meeting: Name of Committee: Coastal Engineering Research Board (CERB). Date of Meeting: April 26, 2006. Place: Sheraton Gateway Atlanta Airport Hotel, 1900 Sullivan Road, Atlanta, GA 30337. Time: 8:30 a.m. to 3 p.m.
Intent To Prepare a Draft Environmental Impact Statement for a Proposed Dredged Material Management Plan for Cleveland Harbor, OH
Document Number: 06-2603
Type: Notice
Date: 2006-03-17
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
Pursuant to Section 102(2)(c) of the National Environmental Policy Act (NEPA) of 1969 as implemented by the Council on Environmental Quality regulations (40 CFR Parts 1500-1508) and Public Law 102-484 Section 2834, as amended by Public Law 104-106 Section 2867, the Department of the Army hereby gives notice of intent to prepare a Draft Environmental Impact Statement (EIS) for the subject Dredged Material Management Plan (DMMP). The Buffalo District of the U.S. Army Corps of Engineers will be the lead agency in preparing the EIS. The EIS will consider Federal actions associated with the development of a DMMP for the Federal harbor in the city of Cleveland, Cuyahoga County, OH. The DMMP is a study conducted to develop a long- term (20-year) strategy for providing viable dredged material placement alternatives that would meet the needs of maintaining the Federal channels at Cleveland Harbor. The overall goal of the DMMP is to develop a plan to maintain channels necessary for commercial navigation within Cleveland Harbor and to conduct dredged material placement in the most economically and environmentally sound manner, and maximize the use of dredged material as a beneficial resource.
Notice of Availability of the Final Environmental Impact Statement (FEIS) Dated July 2004 for the Route Location, Adoption, and Construction of State Route 905 Between the Otay Mesa Port of Entry and Interstate 805 in the County of San Diego, CA
Document Number: E6-3425
Type: Notice
Date: 2006-03-10
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers, Los Angeles District (Corps) intends to adopt the FEIS completed by the U.S. Department of Transportation, Federal Highways Administration (FHWA) for purposes of compliance with the National Environmental Policy Act.
Intent To Prepare a Draft Programmatic Environmental Impact Statement for the Louisiana Coastal Protection and Restoration Project
Document Number: E6-3050
Type: Notice
Date: 2006-03-03
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
This notice of intent (NOI) is for the Louisiana Coastal Protection and Restoration (LACPR) Project. This notice of intent addresses the coastal area of southern Louisiana from the state boundary of Louisiana and Mississippi at the Pearl River in the east to the state boundary of Louisiana and Texas at the Sabine River in the west as identified in the Coast 2050 coastal Louisiana restoration plan.
Notice of Intent To Adopt a Final Environmental Impact Statement
Document Number: E6-3045
Type: Notice
Date: 2006-03-03
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The Army Corps of Engineers, Los Angeles District (Corps), has reviewed the Final Environmental Impact Statement (FEIS) prepared by the U.S. Department of Transportation, Federal Highway Administration (FHWA), dated July 2004, for the proposed ``Route Location, Adoption, and Construction of State Route 905 Between the Otay Mesa Port of Entry and Interstate 805 in the County of San Diego, California.'' The Corps intends to adopt the FEIS for purposes of compliance with the National Environmental Policy Act (NEPA). This notice only solicits comments on the Corps' intent to adopt the FEIS.
Intent To Prepare a Draft Environmental Impact Statement for the Everglades National Park Seepage Management Project, Miami-Dade County, FL
Document Number: 06-1727
Type: Notice
Date: 2006-02-24
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (Corps), Jacksonville District, intends to prepare an integrated Project Implementation Report/Draft Environmental Impact Statement (PIR/DEIS) for the Everglades National Park (ENP) Seepage Management Project. The study is a cooperative effort between the Corps and the South Florida Water Management District (SFWMD), which is also a cooperating agency for this DEIS. The project seeks to reduce eastward water seepage from the Everglades system for the benefit of wetland communities within ENP. The ENP Seepage Management Project is comprised of three components that were recommended as a part of the Central and Southern Florida (C&SF) Project Comprehensive Review Study Feasibility Report and Integrated Environmental Impact Statement (EIS) dated April 1999 (Restudy), and is part of the Comprehensive Everglades Restoration Plan (CERP). The project includes an aboveground recharge area, a wetland buffer area, relocation and enhancement of levee L-31N, a sheetflow delivery system, and other features located adjacent to ENP in Miami- Dade County.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.