Engineers Corps August 2006 – Federal Register Recent Federal Regulation Documents

Intent to Prepare a Draft Environmental Impact Statement for the Proposed Port of Vancouver Columbia Gateway Project in the State of Washington
Document Number: E6-14216
Type: Notice
Date: 2006-08-28
Agency: Department of Defense, Corps of Engineers, Department of the Army, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (Corps) is initiating the preparation of an Environmental Impact Statement under the National Environmental Policy Act (NEPA). The EIS is for a Department of the Army permit issued under Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act to install the infrastructure necessary to support an approximately 500-acre development of water dependent and industrial facilities at the Port of Vancouver.
Notice of Intent To Prepare a Draft Environmental Impact Statement for a Proposed Cumberland County Regional Water Supply Project, Cumberland County, TN
Document Number: E6-14144
Type: Notice
Date: 2006-08-25
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The Corps of Engineers, Nashville District intends to prepare a Draft Environmental Impact Statement (DEIS) for a regional water supply project in Cumberland County, TN. This DEIS is necessary to provide National Environmental Policy Act (NEPA) coverage for a proposed regional water supply system capable of providing the county a reliable water supply for 50 years. The county is currently served by six water systems and development of individual water sources has been problematic from an environmental perspective. The county's current water supply capacity is approximately ten million gallons per day. A regional approach has been recommended to allow more efficient planning to develop future water supplies in an environmentally acceptable manner.
Notice of Availability for the Draft Environmental Impact Statement/Environmental Impact Report for the Berth 97-109 Container Terminal Project, Los Angeles County, CA
Document Number: E6-13755
Type: Notice
Date: 2006-08-21
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers, Los Angeles District (Regulatory Branch), in coordination with the Port of Los Angeles, has completed a Draft Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the Berth 97-109 Container Terminal Project. The Port of Los Angeles requires authorization pursuant to Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act for wharf and terminal development (142 acres) in three phases, dredging up to 41,000 cubic yards of sediment, construction of two new concrete pile-supported wharves (for a total of 2,500 feet), new terminal buildings and two new terminal bridges.
Intent To Prepare an Environmental Impact Statement To Evaluate the Impacts Associated With a Previously Authorized Pier Extension in Strait of Georgia at Cherry Point, Near Ferndale, Whatcom County, WA
Document Number: E6-13473
Type: Notice
Date: 2006-08-16
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (Corps) Seattle District is the permitting agency and lead Federal agency for this action. The U.S Coast Guard (USCG) is cooperating agency. The Corps is announcing its intent to prepare an Environmental Impact Statement (EIS) pursuant to the National Environmental Policy Act (NEPA). The EIS will support the Corps' permit evaluation process under Section 10 of the Rivers and Harbors Act for the BP Cherry Point marine pier extension.
Intent To Prepare a Draft Environmental Impact Statement for Mississippi Coastal Improvements Program, Hancock, Harrison, and Jackson Counties, MS
Document Number: 06-6794
Type: Notice
Date: 2006-08-09
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The Mobile District, U.S. Army Corps of Engineers (Corps), intends to prepare a Draft Environmental Impact Statement (DEIS) to address the potential impacts associated with actions to comprehensively address hurricane and storm damage reduction, prevention of saltwater intrusion, preservation of fish and wildlife, prevention of erosion, and other related water resource purposes in coastal Mississippi. These actions are related to the consequences of hurricanes in the Gulf of Mexico in 2005. The Corps will forward recommendations to Congress authorized by the Department of Defense Appropriations Act, 2006 (Pub. L. 109-148) dated December 30, 2005. The EIS will be used as a basis for ensuring compliance with the National Environmental Policy Act (NEPA).
Intent To Prepare a Second Supplemental Environmental Impact Statement to the Final EIS on Herbert Hoover Dike Major Rehabilitation and Evaluation Report, Reaches 2 and 3, in Palm Beach and Glades Counties, FL
Document Number: 06-6793
Type: Notice
Date: 2006-08-09
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
On July 8, 2005, the Jacksonville District, U.S. Army Corps of Engineers (Corps) issued a Final Supplemental Environmental Impact Statement (FSEIS) for the Major Rehabilitation actions proposed for Herbert Hoover Dike (HHD), Reach One. Herbert Hoover Dike is the levee that completely surrounds Lake Okeechobee. On September 23, 2005, a Record of Decision was signed adopting the preferred alternative as the Selected Plan for Reach One. At this time the Corps plans to extend rehabilitation along Reaches Two and Three of HHD. This stretch of HHD extends for approximately 27 miles between an area west of Belle Glade, Palm Beach County to east of Moore Haven, Glades County, FL.
Record of Decision for the Boston Harbor Inner Harbor Maintenance Dredging Project
Document Number: 06-6792
Type: Notice
Date: 2006-08-09
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers, New England District announces its decision to maintenance dredge the following Federal navigation channels in Boston Harbor, Massachusetts: the Main Ship Channel upstream of Spectacle Island to the Inner Confluence, the upper Reserved Channel, the approach to the Navy Dry Dock, a portion of the Mystic River, and a portion of the Chelsea River (previously permitted). Maintenance dredging of the navigation channels landward of Spectacle Island is needed to remove shoals and restore the Federal navigation channels to their authorized depths. Dredged material suitable for unconfined open water disposal will be disposed at the Massachusetts Bay Disposal Site; material not suitable for unconfined open water disposal will be disposed in confined aquatic disposal (CAD) cell(s) located within the navigation channels. Major navigation channel improvements (deepening) were made in 1999 through 2001 in the Reserved Channel, the Mystic River, Inner Confluence, and the Chelsea River. A Final Environmental Impact Statement (EIS) prepared in June 1995 for this previous navigation improvement project (Boston Harbor Navigation Improvement ProjectBHNIP) identified selected use of CAD cells in the Mystic River, Inner Confluence, and Chelsea River for disposal. A Supplemental Draft and Final EIS was prepared for this maintenance dredging project and built on the lessons learned from the previous improvement project. A new CAD cell for the proposed maintenance project will be constructed in the Mystic River (previously permitted) and in the Main Ship Channel just below the Inner Confluence.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.