Surface Transportation Board June 19, 2019 – Federal Register Recent Federal Regulation Documents
Results 1 - 2 of 2
Seven County Infrastructure Coalition-Rail Construction & Operation-in Utah, Carbon, Duchesne, and Uintah Counties, Utah
The Seven County Infrastructure Coalition (Coalition) plans to file a request with the Surface Transportation Board (Board) for authority to construct and operate an approximately 80-mile rail line between two terminus points in the Uinta Basin near Myton, Utah, and Leland Bench, Utah, and the interstate rail network. The construction and operation of the proposed rail line has the potential to result in significant environmental impacts; therefore, the Board's Office of Environmental Analysis (OEA) has determined that the preparation of an EIS is appropriate pursuant to the National Environmental Policy Act of 1969 (NEPA), as amended. The purpose of this notice is to inform stakeholdersincluding members of the public; tribes; federal, state, and local agencies; environmental groups; and potential shippers interested in or potentially affected by the proposed project. OEA will hold public scoping meetings as part of the NEPA process. Comments submitted during scoping will assist OEA in defining the range of alternatives and potential impacts to be considered in the EIS. OEA has developed a Draft Scope of Study for the EIS for stakeholder review and comment. Public meeting dates and locations, along with the Draft Scope of Study, are provided below.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.