Pipeline and Hazardous Materials Safety Administration May 2023 – Federal Register Recent Federal Regulation Documents
Results 1 - 10 of 10
Pipeline Safety: Request for Special Permit; Florida Gas Transmission Company, LLC
PHMSA is publishing this notice to solicit public comments on a request for special permit received from Florida Gas Transmission Company, LLC (FGT). The special permit request is seeking relief from compliance with certain requirements in the federal pipeline safety regulations. At the conclusion of the 30-day comment period, PHMSA will review the comments received from this notice as part of its evaluation to grant or deny the special permit request.
Pipeline Safety: Request for Special Permit; Florida Gas Transmission Company, LLC
PHMSA is publishing this notice to solicit public comments on a request for a special permit received from Florida Gas Transmission Company, LLC (FGT). The special permit request is seeking relief from compliance with certain requirements in the Federal pipeline safety regulations. At the conclusion of the 30-day comment period, PHMSA will review the comments received from this notice as part of its evaluation to grant or deny the special permit request.
Hazardous Materials: Harmonization With International Standards
PHMSA proposes to amend the Hazardous Materials Regulations to maintain alignment with international regulations and standards by adopting various amendments, including changes to proper shipping names, hazard classes, packing groups, special provisions, packaging authorizations, air transport quantity limitations, and vessel stowage requirements.
Hazardous Materials: Notice of Actions on Special Permits
In accordance with the procedures governing the application for, and the processing of, special permits from the Department of Transportation's Hazardous Material Regulations, notice is hereby given that the Office of Hazardous Materials Safety has received the application described herein.
Hazardous Materials: Notice of Applications for Modification to Special Permits
In accordance with the procedures governing the application for, and the processing of, special permits from the Department of Transportation's Hazardous Material Regulations, notice is hereby given that the Office of Hazardous Materials Safety has received the application described herein.
Hazardous Materials: Notice of Applications for New Special Permits
In accordance with the procedures governing the application for, and the processing of, special permits from the Department of Transportation's Hazardous Material Regulations, notice is hereby given that the Office of Hazardous Materials Safety has received the application described herein.
Hazardous Materials: Adjusting Registration and Fee Assessment Program; Notice of Public Meeting
PHMSA's Office of Hazardous Materials Safety will hold a public meeting to solicit input on potential adjustments to the statutorily mandated hazardous materials registration and fee assessment program. The potential adjustment of fees may be necessary to fund PHMSA's national emergency preparedness grant programs at the newly authorized level in accordance with the Infrastructure Investment and Jobs Act of 2021.
Hazardous Materials: Information Collection Activities
In accordance with the Paperwork Reduction Act of 1995, PHMSA invites comments on six Office of Management and Budget (OMB) control numbers pertaining to hazardous materials transportation. PHMSA intends to request renewal for these six control numbers from OMB.
Pipeline Safety: Gas Pipeline Leak Detection and Repair
PHMSA proposes regulatory amendments that implement congressional mandates in the Protecting our Infrastructure of Pipelines and Enhancing Safety Act of 2020 to reduce methane emissions from new and existing gas transmission pipelines, distribution pipelines, regulated (Types A, B, C and offshore) gas gathering pipelines, underground natural gas storage facilities, and liquefied natural gas facilities. Among the proposed amendments for part 192- regulated gas pipelines are strengthened leakage survey and patrolling requirements; performance standards for advanced leak detection programs; leak grading and repair criteria with mandatory repair timelines; requirements for mitigation of emissions from blowdowns; pressure relief device design, configuration, and maintenance requirements; and clarified requirements for investigating failures. Finally, PHMSA proposes expanded reporting requirements for operators of all gas pipeline facilities within DOT's jurisdiction, including underground natural gas storage facilities and liquefied natural gas facilities.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.