Pipeline and Hazardous Materials Safety Administration March 11, 2011 – Federal Register Recent Federal Regulation Documents

Hazardous Materials: Cargo Tank Motor Vehicle Loading and Unloading Operations
Document Number: 2011-5335
Type: Proposed Rule
Date: 2011-03-11
Agency: Pipeline and Hazardous Materials Safety Administration, Department of Transportation
In this NPRM, PHMSA is proposing to amend the Hazardous Materials Regulations to require each person (i.e., carrier or facility) who engages in cargo tank loading or unloading operations to perform a risk assessment of the loading and unloading operation and develop and implement safe operating procedures based upon the results of the risk assessment. The proposed operational procedures include requirements to address several aspects of loading and unloading, including provisions for facilities to develop maintenance testing programs for transfer equipment (i.e., hose maintenance programs) used to load or unload cargo tank motor vehicles (CTMVs). In addition, PHMSA is proposing to require each employee who engages in cargo tank loading or unloading operations to receive training and be evaluated on the employee's qualifications to perform loading or unloading functions. PHMSA is proposing these amendments to reduce the risk associated with the loading and unloading of cargo tank motor vehicles that contain hazardous materials.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.