Pipeline and Hazardous Materials Safety Administration June 2009 – Federal Register Recent Federal Regulation Documents
Results 1 - 7 of 7
Pipeline Safety: Incorporation by Reference Update: American Petroleum Institute (API) Standards 5L and 1104
The Pipeline and Hazardous Materials Safety Administration (PHMSA) is confirming the effective date of April 14, 2009, for the direct final rule that appeared in the Federal Register on April 14, 2009. The direct final rule incorporated by reference the most recent editions of API Specification 5L, ``Specification for Line Pipe'' and API 1104, ``Welding of Pipelines and Related Facilities.''
Hazardous Materials Transportation; Miscellaneous Revisions to Registration and Fee Assessment Program
The Pipeline and Hazardous Materials Safety Administration (PHMSA) is withdrawing the notice of proposed rulemaking published under this docket on May 5, 2008 (73 FR 24519). Our revised estimates of unexpended balances from previous years and revenues expected to be generated at current registration fee levels indicate that an increase in registration fees is not necessary to fund the national Hazardous Materials Emergency Preparedness (HMEP) grants program at its authorized level of $28,318,000 for Fiscal Year 2009.
Office of Hazardous Materials Safety; Notice of Applications for Modification of Special Permit
In accordance with the procedures governing the application for, and the processing of, special permits from the Department of Transportation's Hazardous Material Regulations (49 CFR Part 107, Subpart B), notice is hereby given that the Office of Hazardous Materials Safety has received the applications described herein. This notice is abbreviated to expedite docketing and public notice. Because the sections affected, modes of transportation, and the nature of application have been shown in earlier Federal Register publications, they are not repeated here. Requests for modification of special permits (e.g., to provide for additional hazardous materials, packaging design changes, additional mode of transportation, etc.) are described in footnotes to the application number. Application numbers with the suffix ``M'' denote a modification request. These applications have been separated from the new application for special permits to facilitate processing.
Office of Hazardous Materials Safety; Notice of Application for Special Permits
In accordance with the procedures governing the application for, and the processing of, special permits from the Department of Transportation's Hazardous Material Regulations (49 CFR Part 107, Subpart B), notice is hereby given that the Office of Hazardous Materials Safety has received the application described herein. Each mode of transportation for which a particular special permit is requested is indicated by a number in the ``Nature of Application'' portion of the table below as follows: 1Motor vehicle, 2Rail freight, 3Cargo vessel, 4Cargo aircraft only, 5Passenger-carrying aircraft.
Pipeline Safety: Government/Industry Pipeline Research and Development Forum
PHMSA executes a collaborative, coordinated, competitive and co-funded research and development (R&D) program with the pipeline industry and other Federal and State regulators. PHMSA periodically holds a Pipeline R&D Forum to generate recommendations on the future
Hazardous Materials: Request for Comments on Issues or Problems Concerning International Atomic Energy Agency Regulations for the Safe Transport of Radioactive Materials
PHMSA and the U.S. Nuclear Regulatory Commission (NRC) are jointly seeking comments on issues or problems concerning requirements in the International Atomic Energy Agency (IAEA) Regulations for the Safe Transport of Radioactive Material (referred to as TS-R-1). The IAEA is considering revisions to the TS-R-1 regulations as part of its periodic two-year review cycle for a 2013 Edition.
Office of Hazardous Materials Safety; Notice of Delays in Processing of Special Permits Applications
In accordance with the requirements of 49 U.S.C. 5117(c), PHMSA is publishing the following list of special permit applications that have been in process for 180 days or more. The reason(s) for delay and the expected completion date for action on each application is provided in association with each identified application.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.