Pipeline and Hazardous Materials Safety Administration February 2006 – Federal Register Recent Federal Regulation Documents
Results 1 - 8 of 8
Houston, TX Requirements on Storage of Hazardous Materials During Transportation
A. Federal hazardous material transportation law preempts the following requirements in the Houston Fire Code as applied by the Houston Fire Department to the storage of hazardous materials during transportation at George Bush Intercontinental Airport, because (a) the designation, description, and classification of hazardous materials in the Fire Code is not substantively the same as in the HMR; (b) these requirements are not substantively the same as requirements in the HMR regarding the use of shipping documents to provide emergency response information in the event of an incident during the transportation of hazardous material; and (c) these requirements require advance notification of the transportation of hazardous materials which creates an obstacle to accomplishing and carrying out the purposes and goals of Federal hazardous material transportation law and the HMR: 1. Sections 105.8.h.1 and 8001.3.1, which require a permit to store, transport on site, dispense, use or handle hazardous materials in excess of certain ``exempt'' amounts listed in Table 105-C of the Fire Code. 2. Sections 105.8.f.3 and 7901.3.1, which require a permit to store, handle, transport, dispense, or use flammable or combustible liquids in excess of the amounts specified in Sec. 105.8.f.3. 3. Sections 8001.3.2 and 8001.3.3, which specify the Houston Fire Chief may require an applicant for a permit to provide a hazardous materials management plan and a hazardous materials inventory statement in accordance with the provisions of Appendix II-E of the Fire Code. B. Federal hazardous material transportation law preempts the separation requirements in sections 7902.1.6 and 8001.11.8 of the Houston Fire Code as applied by the Houston Fire Department to the storage of hazardous materials during transportation at George Bush Intercontinental Airport, because these requirements are not substantively the same as the segregation requirements in 49 CFR 175.78. C. There is insufficient information to find Federal hazardous material transportation law preempts the secondary containment requirements in sections 7901.8 and 8003.1.3.3 in the Houston Fire Code as enforced and applied by the Houston Fire Department to the storage of hazardous materials during transportation at George Bush Intercontinental Airport, including the construction and capacity requirements for storage cabinets for secondary containment in sections 7902.5.9 and 8001.10.6, because the application and comments do not show (a) it is impossible to comply with both these requirements and the Federal hazardous material transportation law, the regulations issued under that law, or a hazardous materials transportation security regulation or directive issued by the Secretary of Homeland Security (DHS), or (b) these requirements, as enforced and applied, are likely to cause diversions or delays in the transportation of hazardous materials. If the applicant wishes to provide further information regarding the secondary containment requirements in the Houston Fire Code, it may submit a new application.
Pipeline Safety: Random Drug Testing Rate
Each year pipeline operators randomly select employees to test for prohibited drugs. The number of selections may not be less than the minimum annual percentage rate PHMSA determines, either 50 percent or 25 percent of covered employees, based on the industry's positive rate of random tests. In accordance with applicable standards, PHMSA has determined that the positive rate of random drug tests reported by operators this calendar year for testing done in calendar year 2005 is less than 1.0 percent. Therefore, in calendar year 2006, the minimum annual percentage rate for random drug testing is 25 percent of covered employees.
Office of Hazardous Materials Safety; Notice of Application for Special Permits
In accordance with the procedures governing the application for, and the processing of, special permits from the Department of Transportation's Hazardous Material Regulations (49 CFR part 107, subpart B), notice is hereby given that the Office of Hazardous Materials Safety has received the application described herein. Each mode of transportation for which a particular special permit is requested is indicated by a number in the ``Nature of Application'' portion of the table below as follows: 1Motor vehicle, 2Rail freight, 3Cargo vessel, 4Cargo aircraft only, 5Passenger-carrying aircraft.
Office of Hazardous Materials Safety; Notice of Applications for Modification of Special Permit
In accordance with the procedures governing the application for, and the processing of, special permits from the Department of Transportation's Hazardous Material Regulations (49 CFR part 107, subpart B), notice is hereby given that the Office of Hazardous Material Safety has received the application described herein. This notice is abbreviated to expedite docketing and public notice. Because the sections affected, modes of transportation, and the nature of application have been shown in earlier Federal Register publications, they are not repeated here. Request of modifications of special permits (e.g. to provide for additional hazardous materials, packaging design changes, additional mode of transportation, etc.) are described in footnotes to the application number. Application numbers with the suffix ``M'' denote a modification request. There applications have been separated from the new applications for special permits to facilitate processing.
Hazardous Materials: Revisions to Civil and Criminal Penalties; Penalty Guidelines
The Pipeline and Hazardous Materials Safety Administration is revising its regulations to reflect revisions to the civil and criminal penalties in the Hazardous Materials Safety and Security Reauthorization Act (Title VII of the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users), enacted on August 10, 2005. We are also revising baseline assessments for violations related to training and security plans and making editorial changes in our List of Frequently Cited Violations in our Guidelines for Civil Penalties. We publish our Guidelines for Civil Penalties in order to provide the regulated community and the general public with information on the hazardous material penalty assessment process.
Request for Public Comments and Office of Management and Budget (OMB) Approval of an Existing Information Collection (2137-0589)
This notice requests public participation in the Office of Management and Budget (OMB) approval process for the renewal of an existing PHMSA information collection. In compliance with the Paperwork Reduction Act of 1995, this notice announces that the Information Collection Request (ICR) described below has been forwarded to OMB for extension of the currently approved collection. The ICR describes the nature of the information collection and the expected burden. PHMSA published a Federal Register Notice soliciting comments on the following information collection and received none. The purpose of this notice is to allow the public an additional 30 days from the date of this notice to submit comments.
Hazardous Materials: Enforcement Procedures; Correction
On January 25, 2006, PHMSA published a notice of public meetings inviting interested persons to participate in a series of public meetings addressing the enhanced hazardous materials transportation enforcement authority contained in the Hazardous Materials Safety and Security Reauthorization Act of 2005 (Title VII of the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU)), enacted on August 10, 2005. In the January 25, 2006, notice we published a 3 p.m. start time for the March 15, 2006 public meeting in error. The Seattle, Washington meeting will instead begin at 12 p.m. on March 15, 2006.
Office of Hazardous Materials Safety; Notice of Delays in Processing of Special Permit Applications
In accordance with the requirements of 49 U.S.C. 5117(c), PHMSA is publishing the following list of special permit applications that have been in process for 180 days or more. The reason(s) for delay and the expected completion date for action on each application is provided in association with each identified application.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.