Notice of Final Federal Agency Actions on Proposed Railroad Project in California on Behalf of the California High-Speed Rail Authority
The Federal Railroad Administration (FRA), on behalf of the California High-Speed Rail Authority (Authority), is issuing this notice to announce actions taken by the Authority that are final agency actions. The actions relate to the California High-Speed Rail (HSR) Palmdale to Burbank Project Section (Project). The Project will provide the public with electric-powered HSR service that provides predictable and consistent travel times between the Antelope Valley and the San Fernando Valley; provide connectivity to airports, mass transit systems, and the highway network in the Antelope Valley and the San Fernando Valley; and connect the Northern and Southern portions of the planned statewide HSR system. These actions grant permits, approvals, or authorizations for the Project.
Quarterly Reports of Positive Train Control System Performance
The purpose of this notice is to inform the public that FRA has determined it is in the public interest for railroads to continue submitting reports of their positive train control (PTC) systems' performance to FRA on a quarterly basis as the Infrastructure Investment and Jobs Act currently requires, and as the Office of Management and Budget (OMB) has approved through March 31, 2027.
Notice of Proposed Nonavailability Waiver of Buy America Requirements for Certain High-Speed Rail Products for the California Inaugural High-Speed Rail Service Project
The Federal Railroad Administration (FRA) is seeking comments on whether to grant a waiver of its Buy America requirements to the California High-Speed Rail Authority (the Authority) to use certain products that are not produced in the United States for use in the California Inaugural High-Speed Rail Service Project between Merced, California and Bakersfield, California (Project). FRA is funding the Project under the Federal-State Partnership for Intercity Passenger Rail Program (FSP Program); therefore, FRA's Buy America requirements apply to the Project. FRA's Buy America requirements include both FRA's statutory requirements, which require 100 percent of the manufactured products and steel and iron used in an FRA-funded project to be produced in the United States, and the Build America, Buy America Act (BABA), which requires that all construction materials used in the FRA- funded project be produced in the United States. FRA is not proposing to waive the applicable BABA requirements for construction materials used in the Project. The proposed waiver would apply to the aluminum car shells, signal systems, high-speed rail turnouts and fire alarm systems based on the domestic nonavailability of such products, as identified by the Authority. The Authority estimates that over 98 percent of the total direct dollar expenditures for the Project would be spent on domestically sourced products and labor, including 100 percent of the civil infrastructure costs.
Proposed Agency Information Collection Activities; Comment Request
Under the Paperwork Reduction Act of 1995 (PRA) and its implementing regulations, this notice announces that FRA is forwarding the Information Collection Request (ICR) summarized below to the Office of Management and Budget (OMB) for review and comment. The ICR describes the information collection and its expected burden. On July 9, 2024, FRA published a notice providing a 60-day period for public comment on the ICR. FRA received no comments in response to the notice.
Application Package From the State of Ohio to the Surface Transportation Project Delivery Program and Proposed Memorandum of Understanding (MOU) Assigning Environmental Responsibilities to the State
This notice announces that FRA has received and reviewed an application package from the State of Ohio (State), Ohio Department of Transportation (ODOT) in conjunction with the Ohio Rail Development Commission (ORDC), requesting participation in the Surface Transportation Project Delivery Program (Program). Under the Program, FRA may assign, and the State may assume, responsibilities under the National Environmental Policy Act (NEPA), and all or part of FRA's responsibilities for environmental review, consultation, or other actions required under any Federal environmental laws with respect to one or more railroad projects within the State. FRA has determined the application package to be complete and developed a draft MOU with the State outlining how the State will implement the Program with FRA oversight. The public is invited to comment on the State's request, including its application package and the proposed MOU, which includes the proposed assignments and assumptions of environmental review, consultation, and other activities.
Railroad Safety Advisory Committee; Notice of Meeting
FRA announces the sixty-seventh meeting of the Railroad Safety Advisory Committee (RSAC or Committee), a Federal Advisory Committee that provides advice and recommendations to FRA on railroad safety matters through a consensus process. This meeting of the RSAC will focus on efforts critical to railroad safety including safety improvements in the wake of the February 3, 2023, East Palestine, Ohio, derailment, electronic devices, remote control operations, and roadway worker protection.