Federal Highway Administration February 2013 – Federal Register Recent Federal Regulation Documents

Environmental Impact and Related Procedures
Document Number: 2013-04678
Type: Proposed Rule
Date: 2013-02-28
Agency: Federal Highway Administration, Department of Transportation, Federal Transit Administration
This NPRM provides interested parties with the opportunity to comment on proposed changes to the Federal Highway Administration (FHWA) and the Federal Transit Administration's (FTA) joint procedures that implement the National Environmental Policy Act (NEPA). The revisions are prompted by enactment of the Moving Ahead for Progress in the 21st Century Act (MAP-21). This NPRM proposes to add new categorical exclusions for projects within an existing operational right-of-way and projects receiving limited Federal funding, as described in MAP-21. The Agencies seek comments on the proposals contained in this document.
Notice of Final Federal Agency Actions on Proposed Highway in California
Document Number: 2013-04643
Type: Notice
Date: 2013-02-28
Agency: Federal Highway Administration, Department of Transportation
The FHWA, on behalf of Caltrans, is issuing this notice to announce actions taken by Caltrans that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project, Palo Comado Canyon Road Interchange, along U.S. 101 from postmile 33.0 to 34.4 in the County of Los Angeles, State of California. Those actions grant licenses, permits, and approvals for the project.
Buy America Waiver Notification
Document Number: 2013-04247
Type: Notice
Date: 2013-02-25
Agency: Federal Highway Administration, Department of Transportation
This notice provides information regarding the FHWA's finding that a Buy America waiver is appropriate for the use of non-domestic (1) Electrical Controls and Electrical Equipment; (2) Main Drive Electrical Motor; (3) Auxiliary Drive Electric Motor; (4) Span Lock Electric Motor & Controls for a specific project in the State of Washington.
Buy America Waiver Notification
Document Number: 2013-04244
Type: Notice
Date: 2013-02-25
Agency: Federal Highway Administration, Department of Transportation
This notice provides information regarding the FHWA's finding that a Buy America waiver is appropriate for the use of non-domestic iron and steel products in (1) Auxiliary two speed motor, (2) Auxiliary back up drive clutch, (3) Main span and backup span motor, and (4) Brakes for the Memorial Bridge project in the State of New Hampshire.
Agency Information Collection Activities: Request for Comments for a New Information Collection
Document Number: 2013-03938
Type: Notice
Date: 2013-02-21
Agency: Federal Highway Administration, Department of Transportation
FHWA invites public comments about our intention to request the Office of Management and Budget's (OMB) approval for a new information collection, which is summarized below under SUPPLEMENTARY INFORMATION. We published a Federal Register Notice with a 60-day public comment period on this information collection on November 23, 2012. We are required to publish this notice in the Federal Register by the Paperwork Reduction Act of 1995.
Agency Information Collection Activities: Request for the Renewal of an Information Collection
Document Number: 2013-03935
Type: Notice
Date: 2013-02-21
Agency: Federal Highway Administration, Department of Transportation
FHWA invites public comments about our intention to request the Office of Management and Budget's (OMB) approval for a new information collection, which is summarized below under SUPPLEMENTARY INFORMATION. We published a Federal Register Notice with a 60-day public comment period on this information collection on November 23, 2012. We are required to publish this notice in the Federal Register by the Paperwork Reduction Act of 1995.
Agency Information Collection Activities: Request for the Renewal of an Information Collection
Document Number: 2013-03934
Type: Notice
Date: 2013-02-21
Agency: Federal Highway Administration, Department of Transportation
FHWA invites public comments about our intention to request the Office of Management and Budget's (OMB) approval for a new information collection, which is summarized below under Supplementary Information. We published a Federal Register Notice with a 60-day public comment period on this information collection on November 23, 2012. We are required to publish this notice in the Federal Register by the Paperwork Reduction Act of 1995.
Environmental Impact and Related Procedures
Document Number: 2013-03494
Type: Rule
Date: 2013-02-19
Agency: Federal Highway Administration, Department of Transportation, Federal Transit Administration
This final rule amends the Federal Highway Administration (FHWA) and Federal Transit Administration (FTA) joint procedures that implement the National Environmental Policy Act (NEPA) by enacting a new categorical exclusion (CE) for emergency actions as required by the Moving Ahead for Progress in the 21st Century Act (MAP-21). The final rule modifies the existing lists of FHWA and FTA CEs and expands the existing CE for emergencies to include emergency actions as described in MAP-21 and pursuant to this rulemaking.
Notice of Final Federal Agency Actions on Proposed Highway in California
Document Number: 2013-03535
Type: Notice
Date: 2013-02-15
Agency: Federal Highway Administration, Department of Transportation
The FHWA, on behalf of Caltrans, is issuing this notice to announce actions taken by Caltrans, that are final within the meaning of 23 U.S.C. Sec. 139(l)(1). The actions relate to a proposed highway project on the West Mission Bay Drive crossing of the San Diego River flood control channel between West Mission Bay Drive/Sea World Drive intersection and the Sports Arena Boulevard/I-8 intersection in the County of San Diego, State of California. Those actions grant licenses, permits, and approvals for the project.
Agency Information Collection Activities: Request for Comments for a New Information Collection
Document Number: 2013-03510
Type: Notice
Date: 2013-02-15
Agency: Federal Highway Administration, Department of Transportation
The FHWA invites public comments about our intention to request the Office of Management and Budget's (OMB) approval for a new information collection, which is summarized below under SUPPLEMENTARY INFORMATION. We are required to publish this notice in the Federal Register by the Paperwork Reduction Act of 1995.
Establishment of the National Freight Network
Document Number: C1-2013-02580
Type: Notice
Date: 2013-02-13
Agency: Federal Highway Administration, Department of Transportation
Notice of Final Federal Agency Actions on Proposed Highway in California
Document Number: 2013-03307
Type: Notice
Date: 2013-02-13
Agency: Federal Highway Administration, Department of Transportation
The FHWA, on behalf of Caltrans, is issuing this notice to announce actions taken by Caltrans, that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project on Georgia Street Bridge over University Avenue in the City of San Diego, State of California. Those actions grant licenses, permits, and approvals for the project.
Environmental Impact Statement: Will and Kankakee Counties, IL and Lake County, IN
Document Number: 2013-03289
Type: Notice
Date: 2013-02-13
Agency: Federal Highway Administration, Department of Transportation
The FHWA is issuing this notice to advise the public that a Tier Two Environmental Impact Statement will be prepared for the Illiana Corridor in Will and Kankakee Counties, Illinois and Lake County, Indiana.
Buy America Waiver Notification
Document Number: 2013-03145
Type: Notice
Date: 2013-02-12
Agency: Federal Highway Administration, Department of Transportation
This notice provides information regarding the FHWA's finding that a Buy America waiver is appropriate for the use of non-domestic 35', 45', and 55' Pre-stressed Spun Concrete Transmission and Distribution Power Poles in the Territory of Guam for synchronization of the existing system. This waiver is a general standing waiver that is applicable to the Territory of Guam.
Environmental Impact and Related Procedures
Document Number: 2013-02345
Type: Rule
Date: 2013-02-07
Agency: Federal Highway Administration, Department of Transportation, Federal Transit Administration
This final rule makes revisions to the joint Federal Transit Administration (FTA) and Federal Highway Administration (FHWA) regulations that implement the National Environmental Policy Act (NEPA). The revisions are aimed at streamlining the FTA environmental process for transit projects, in response to the August 31, 2011, Presidential Memorandum titled ``Speeding Infrastructure Development through More Efficient and Effective Permitting and Environmental Review.'' The revisions also respond to Executive Order 13563's directive to periodically review existing regulations to determine if they can be made more effective and/or less burdensome. The new categorical exclusions (CEs) established by this rule, which affect actions by FTA and FTA grant applicants, are intended to improve the efficiency of the environmental review process by making available the least intensive form of review for those actions that typically do not have the potential for significant environmental effects, and, therefore, do not merit additional analysis and documentation associated with an environmental assessment or an environmental impact statement.
Multistate Corridor Operations and Management Program
Document Number: 2013-02157
Type: Notice
Date: 2013-02-01
Agency: Federal Highway Administration, Department of Transportation
This notice invites existing and potential multistate organizations, coalitions, or other arrangements or entities engaged in corridor transportation activities to apply for participation in the Multistate Corridor Operations and Management Program authorized by the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU). The purpose of this program is to promote regional cooperation, planning, and shared project implementation for programs and projects to improve multimodal transportation system management and operations. This notice seeks applications for available fiscal year (FY) 2012 funding ($7 million) for this program, which will be provided to cover a maximum of 80 percent of proposed program/project costs. Multiple awards are possible, but not guaranteed.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.