Federal Highway Administration November 2005 – Federal Register Recent Federal Regulation Documents
Results 1 - 12 of 12
Design Standards for Highways; Interstate System
The FHWA is requesting comments on a proposed amendment to the design standards that apply to highway construction and reconstruction projects on the Interstate System. A 2005 revision of the American Association of State Highway and Transportation Officials' (AASHTO) publication entitled A Policy on Design Standards Interstate System, January 2005, has replaced the previous version of this policy published in 1991. If adopted by the FHWA, the new AASHTO publication would constitute the FHWA's policy on geometric design standards for all construction and reconstruction projects on the Interstate System.
Environmental Impact Statement: Washington and Bolivar Counties, MS
The Federal Highway Administration is issuing this notice to advise the public that an Environmental Impact Statement will be prepared for a proposed connector route from the proposed Interstate 69 to U.S. Highway 82 near the City of Greenville, MS in the above referenced counties.
Environmental Impact Statement; Skowhegan Transportation Study; Skowhegan and Madison, Somerset County, MA
The FHWA is issuing this notice to advise the public that an Environmental Impact Statement (EIS) will be prepared for a proposed highway project in the Towns of Skowhegan and Madison, Maine.
Agency Information Collection Activities; Request for Comments; Renewal of Two Information Collections
The FHWA invites public comments about our intention to request the Office of Management and Budget's (OMB) approval to renew two information collections, which are summarized below under Supplementary Information. We are required to publish this notice in the Federal Register by the Paperwork Reduction Act of 1995.
Agency Information Collection Activities; Request for Comments; Renewed Approval of an Information Collection; Environmental Streamlining: Measuring the Performance of Stakeholders in the Transportation Project Development Process II
The FHWA invites public comments about our intention to request the Office of Management and Budget's (OMB) approval to renew an information collection, which is summarized below under Supplementary Information. We are required to publish this notice in the Federal Register by the Paperwork Reduction Act of 1995.
Environmental Impact Statement: Miami-Dade County, FL
The FHWA is issuing this notice to advise the public that an Environmental Impact Statement (EIS) will be prepared for a proposed highway project in Miami-Dade County, Florida.
Draft Supplement Environmental Impact Statement for US 411 Connector, Bartow County, GA
In compliance with the National Environmental Policy Act of 1969, the FHWA, in cooperation with the Georgia Department of Transportation (GDOT), have jointly prepared a Draft Supplemental Environmental Impact Statement (DSEIS) for proposed transportation improvements in the US 411 Corridor. A Notice of Availability published in the Federal Register on October 12, 2005 included a comment period through November 21, 2005. This date has been revised and extended to December 5, 2005, to coincide with the date listed in the EPA Federal Register Notice.
Environmental Impact Statment: Sanders and Flathead Counties, MT
The FHWA is issuing this notice to advise the public that the FHWA is rescinding the Notice of Intent (NOI) to prepare an environmental impact statement (EIS) for proposed improvements to the Thompson River Road (also known as Forest Highway 56), a county road located near Thompson Falls, Montana.
Environmental Impact Statement: San Diego County, CA
The FHWA is issuing this notice to advise the public that an Environmental Impact Statement (EIS) will be prepared for a proposed highway project in San Diego County, California.
Supplemental Draft Environmental Impact Statement: Loudon, Anderson, and Knox Counties, TN
The Federal Highway Administration (FHWA) is issuing this notice to advise the public of its intent to prepare a Supplemental Draft Environmental Impact Statement in cooperation with the Tennessee Department of Transportation (TDOT) for Route 475 (Knoxville Parkway) in Loudon, Knox, and Anderson Counties, Tennessee. This project is intended to improve regional and national transportation needs.
Environmental Impact Statement: Jackson County, OR
The FHWA is issuing this notice to advise the public that an Environmental Impact Statement (EIS) will be prepared for a proposed transportation improvement in the City of Medford, Jackson County, Oregon.
Environmental Impact Statement: Miami-Dade County, Florida
The FHWA is issuing this notice to advise the public that an Environmental Impact Statement (EIS) will be prepared for a proposed highway project in Miami-Dade County, Florida.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.