Surface Mining Reclamation and Enforcement Office May 23, 2008 – Federal Register Recent Federal Regulation Documents
Results 1 - 1 of 1
Black Mesa and Kayenta Coal Mines, Coal Slurry Preparation Plant and Pipeline, and Coconino Aquifer Water-Supply System, Coconino, Mohave, Navajo, and Yavapai Counties, AZ, and Clark County, NV
The Office of Surface Mining Reclamation and Enforcement (OSM) is reopening the comment period for the proposed Black Mesa Project draft EIS and preferred alternative. Since the close of the extended comment period on the draft EIS on February 6, 2007, the scope of the proposed project has been reduced. The proposed project no longer includes supplying coal to the Mohave Generating Station (MGS). The draft EIS is the same document as previously issued, and comments are solicited on the preferred alternative as described in this notice. Previously submitted comments will be considered in the final EIS and do not need to be resubmitted.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.