Department of the Interior August 24, 2005 – Federal Register Recent Federal Regulation Documents

Request for Comments on the Preparation of a New 5-Year Outer Continental Shelf (OCS) Oil and Gas Leasing Program for 2007-2012; and on the Intent To Prepare an Environmental Impact Statement (EIS) for the Proposed 5-Year Program
Document Number: 05-16905
Type: Notice
Date: 2005-08-24
Agency: Department of the Interior, Minerals Management Service
Section 18 of the OCS Lands Act (43 U.S.C. 1344) requires the Department of the Interior to solicit information from interested and affected parties during the preparation of a 5-year OCS oil and gas leasing program. The current 5-year program covers the period July 2002 to July 2007. The Department's MMS intends to prepare a new 5-year program for July 2007 to July 2012 to succeed the current one. Section 18 requires completion of a lengthy, multi-step process of public consultation and analysis before the Secretary of the Interior may approve a new 5-year program. The section 18 process includes the following required steps: This initial solicitation of comments; development of a draft proposed program, a proposed program, and a proposed final program; and Secretarial approval. The MMS will also prepare an EIS that analyzes the alternatives considered for the new 5- year program. This notice announces the start of the EIS preparation process. The MMS will consider comments received in response to this notice in developing the draft proposed program and in determining the scope of the EIS. The public will have additional opportunities to comment on the draft proposed program, the draft EIS, and the proposed program.
Draft Revised Recovery Plan for Hawaiian Waterbirds, Second Draft of Second Revision
Document Number: 05-16833
Type: Notice
Date: 2005-08-24
Agency: Fish and Wildlife Service, Department of the Interior
The U.S. Fish and Wildlife Service (we) announces the availability of the Draft Revised Recovery Plan for Hawaiian Waterbirds, Second Draft of Second Revision, for public review and comment.
San Luis Drainage Feature Re-evaluation Draft Environmental Impact Statement, Alameda, Contra Costa, Fresno, Kern, Kings, Merced, San Joaquin, San Luis Obispo, and Stanislaus Counties, CA
Document Number: 05-16821
Type: Notice
Date: 2005-08-24
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
The Bureau of Reclamation is extending the public review and comment period for the Draft EIS to Thursday, September 1, 2005. The notice of availability of the Draft EIS and notice of public hearings was published in the Federal Register on June 2, 2005, (70 FR 32370). The public review period was originally scheduled to end on August 1, 2005.
Central Valley Project Improvement Act, Criteria for Evaluating Water Conservation Plans
Document Number: 05-16818
Type: Notice
Date: 2005-08-24
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
To meet the requirements of the Central Valley Project Improvement Act of 1992 (CVPIA) and the Reclamation Reform Act of 1982, the Bureau of Reclamation (Reclamation) developed and published the Criteria for Evaluating Water Management Plans (Criteria). Note: For the purpose of this announcement, Water Management Plans are considered the same as Water Conservation Plans (Plans). The CVPIA requires Reclamation to evaluate, and revise if necessary, the Criteria every 3 years. Reclamation is publishing this notice to allow the public to comment on the revised 2005 draft Criteria. Public comment on the revised Criteria is invited at this time. The draft revision is available for review and comment. A copy of the draft revision can be found at the following Web site: https://www.usbr.gov/mp/watershare/ documents/2005DraftCriteria.pdf. A copy of the draft revision can be obtained by contacting persons at the address below. After the review period, if no significant changes are made based on comments from the public, the Criteria will be final. After the Criteria is final, it will be used to evaluate Plans.
Survey Plat Filing; Maine
Document Number: 05-16815
Type: Notice
Date: 2005-08-24
Agency: Department of the Interior, Bureau of Land Management, Land Management Bureau
The Bureau of Land Management (BLM) will file the plat of survey of the lands described below in the BLM-Eastern States, Springfield, Virginia, 30 calendar days from the date of publication in the Federal Register.
Announcement to Extend Comment Period on the Preparation of an Environmental Impact Statement on Excess Spoil Generation and Disposal and Stream Buffer Zone Rulemaking
Document Number: 05-16802
Type: Notice
Date: 2005-08-24
Agency: Department of the Interior, Office of Surface Mining Reclamation and Enforcement, Surface Mining Reclamation and Enforcement Office
We, the Office of Surface Mining Reclamation and Enforcement (OSM), are allowing additional time for the public to submit suggestions on significant issues and specific alternatives that we should consider in the planning and preparation on an environmental impact statement on the excess spoil generation and disposal and stream buffer zone rulemaking. We received multiple requests to extend the comment period by a week beyond the last public scoping meeting in order for the meeting participants to fully consider discussions within the meeting. We believe that this is reasonable request and are granting an extension of public comment period.
Migratory Bird Hunting; Approval of Tungsten-Iron-Copper-Nickel, Iron-Tungsten-Nickel Alloy, and Tungsten-Bronze (Additional Formulation), and Tungsten-Tin-Iron Shot Types as Nontoxic for Hunting Waterfowl and Coots; Availability of Environmental Assessments
Document Number: 05-16718
Type: Proposed Rule
Date: 2005-08-24
Agency: Fish and Wildlife Service, Department of the Interior
The U.S. Fish and Wildlife Service (we, us, or USFWS) proposes to approve four shot types or alloys for hunting waterfowl and coots and to change the listing of approved nontoxic shot types in 50 CFR 20.21(j) to reflect the cumulative approvals of nontoxic shot types and alloys. These four shot types or alloys were submitted to us separately, and we published advance notices of proposed rulemakings for these shot types under RINs 1018-AU04, 1018-AU09, 1018-AU13, and 1018-AU28, respectively. We now combine all these actions under RIN 1018-AU04. In addition, we propose to approve alloys of several metals because we have approved the metals individually at or near 100% in nontoxic shot.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.