Department of the Army, Corps of Engineers October 2018 – Federal Register Recent Federal Regulation Documents

Intent To Prepare an Environmental Impact Statement for Nebraska Department of Transportation U.S. Highway 275 West Point to Scribner Project
Document Number: 2018-23451
Type: Notice
Date: 2018-10-31
Agency: Department of Defense, Department of the Army, Corps of Engineers
The U.S. Army Corps of Engineers (Corps) is preparing an Environmental Impact Statement (EIS) in accordance with the National Environmental Policy Act (NEPA) for U.S. Highway 275 (US-275) West Point to Scribner Project (Project) sponsored by the Nebraska Department of Transportation (NDOT). NDOT proposes to expand US-275 from a two-lane highway to a four-lane expressway along an approximately 20-mile segment from northwest of West Point to southeast of Scribner, including a bypass around Scribner (referred to as ``Scribner Bypass''), in Cuming and Dodge Counties, Nebraska. Construction of the Project is expected to impact jurisdictional waters of the United States, thereby requiring a Clean Water Act Section 404 permit. Additionally, NDOT is proposing to build segments of the Scribner Bypass on an existing federally authorized levee, which would require a Section 408 authorization. The Project may also affect Natural Resources Conservation Service (NRCS) Wetland Reserve Program (WRP) easements. Due to these requirements, the Corps has determined an EIS is necessary for the Project. The Corps has determined that the provisions of Executive Order 13807 (``One Federal Decision'') apply to this Project. One Federal Decision is intended to streamline federal permitting processes, including environmental reviews and authorization decisions, for major infrastructure projects.
Joint Notice of Availability for the Coastal Texas Protection and Restoration Study Draft Integrated Feasibility Report and Environmental Impact Statement
Document Number: 2018-23450
Type: Notice
Date: 2018-10-26
Agency: Department of Defense, Department of the Army, Corps of Engineers
Pursuant to the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers, Galveston District (USACE) announces the release of the Draft Integrated Feasibility Report and Environmental Impact Statement (DIFR-EIS) for the Tentatively Selected Plan (TSP) of the Coastal Texas Protection and Restoration Study, Texas. The DIFR-EIS documents the existing condition of environmental resources in and around areas considered for development, and potential impacts on those resources as a result of implementing the alternatives. This public notice is also issued for the purpose of advising all known interested parties that there is pending before the Texas Commission on Environmental Quality (TCEQ) a decision on water quality certification. A copy of the public notice, with a description of work, has been made available for review in the TCEQ's Austin office.
Inland Waterways Users Board Meeting Notice
Document Number: 2018-23448
Type: Notice
Date: 2018-10-26
Agency: Department of Defense, Department of the Army, Corps of Engineers
The Department of the Army is publishing this notice to announce the following Federal advisory committee meeting of the U.S. Army Corps of Engineers, Inland Waterways Users Board (Board). This meeting is open to the public. For additional information about the Board, please visit the committee's website at https:// www.iwr.usace.army.mil/Missions/Navigation/ InlandWaterwaysUsersBoard.aspx.
Notice of Availability of the Final Missouri River Recovery Management Plan and Environmental Impact Statement
Document Number: 2018-22145
Type: Notice
Date: 2018-10-12
Agency: Department of Defense, Department of the Army, Corps of Engineers
The Notice of Availability for the Final Missouri River Recovery Management Plan and Environmental Impact Statement (MRRMP- FEIS) published in the Federal Register on Friday, August 31, 2018, stated the waiting period for signature of the MRRMP-FEIS Record of Decision would end on October 9, 2018. The U.S. Army Corps of Engineers previously extended the waiting period through October 22, 2018 with a notice published in the Federal Register on Friday, September 28, 2018. Through this notice, the U.S. Army Corps of Engineers is extending the waiting period again through November 9, 2018.
Availability of a Final Integrated Feasibility Report (Feasibility Report/Environmental Impact Statement), Little Colorado River at Winslow, Navajo County, Arizona, Flood Risk Management Project
Document Number: 2018-22134
Type: Notice
Date: 2018-10-12
Agency: Department of Defense, Department of the Army, Corps of Engineers
The U.S. Army Corps of Engineers (Corps), in cooperation with Navajo County Flood Control District, announces the availability of a Final Integrated Feasibility Report (Final IFR) including Feasibility Report and Environmental Impact Statement (EIS) for the Little Colorado River at Winslow, Navajo County, Arizona Flood Risk Management Project for review and comment. The study evaluates alternatives to reduce the risk of damages and to reduce the life, safety, and health risks caused by flooding of the Little Colorado River (LCR) to the City of Winslow, surrounding community, and public and private infrastructure.
Notice of Availability of the Draft Environmental Impact Statement for the Lake Ralph Hall Regional Water Supply Reservoir Project, Fannin County, TX
Document Number: 2018-21538
Type: Notice
Date: 2018-10-05
Agency: Department of Defense, Department of the Army, Corps of Engineers
The U.S. Army Corps of Engineers (USACE) Fort Worth District has prepared a Draft Environmental Impact Statement (EIS) to analyze the direct, indirect and cumulative effects of the construction of the Lake Ralph Hall Regional Water Supply Reservoir Project in Fannin County, TX, proposed by the Upper Trinity Regional Water District (UTRWD). This action requires authorization from USACE under Section 404 of the Clean Water Act for construction and operation of the proposed project. The proposed project is a regional water supply project intended to provide approximately 34,050 acre-feet (AF) per year of new water for 20 water providers, special districts, and municipalities in Denton County and small portions of Dallas, Collin, Grayson, Wise and Cooke counties to the extent that Denton County Customers' service areas extend outside the County. Construction of the reservoir and support facilities would result in permanent direct impacts to waters of the U.S. of approximately 8 acres of wetlands and 384 acres of other waters including streams, impoundments, and ponds. The proposed project pipeline will cross 59 streams with 11,893 lineal feet of temporary impact as well as 0.4 acres of stock tanks.
Availability of the Final Integrated City of Norfolk Coastal Storm Risk Management Feasibility Study Report/Environmental Impact Statement, Norfolk, VA
Document Number: 2018-21537
Type: Notice
Date: 2018-10-03
Agency: Department of Defense, Department of the Army, Corps of Engineers
The U.S. Army Corps of Engineers (USACE) Norfolk District, in cooperation with our non-federal sponsor, the City of Norfolk, announce the availability of a Final Integrated Feasibility Report and Environmental Impact Statement (Final IFR/EIS) and Draft Record of Decision (ROD) for the City of Norfolk Coastal Storm Risk Management Feasibility Study, for review and comment. The study evaluates identified flood risks and develops and evaluates coastal storm risk management measures for the City of Norfolk. These measures were formulated to reduce flood risk to residents, industries and businesses which are critical to the Nation's economy in ways that support the long-term resilience due to sea level rise, local subsidence and storms, within the City of Norfolk. Pursuant to the National Environmental Policy Act (NEPA) of 1969, as amended, the USACE determined that the project has the potential to have significant environmental impacts, and developed the Final EIS and Draft ROD to examine and assess the impacts of all proposed action.