Department of the Army, Corps of Engineers August 2018 – Federal Register Recent Federal Regulation Documents

Notice of Availability of the Final Missouri River Recovery Management Plan and Environmental Impact Statement
Document Number: 2018-18982
Type: Notice
Date: 2018-08-31
Agency: Department of Defense, Department of the Army, Corps of Engineers
The Kansas City and Omaha Districts of the U.S. Army Corps of Engineers (USACE), in cooperation with the U.S. Fish and Wildlife Service (USFWS), have developed the Missouri River Recovery Management Plan and Environmental Impact Statement (MRRMP-EIS). This document is a programmatic assessment of major federal actions necessary to avoid a finding of jeopardy to the pallid sturgeon (Scaphirhynchus albus), interior least tern (Sterna antillarum athalassos), and the Northern Great Plains piping plover (Charadrius melodus) caused by operation of the Missouri River Mainstem System and the Kansas River Reservoir System and operation and maintenance of the Missouri River Bank Stabilization and Navigation Project (BSNP) in accordance with the Endangered Species Act (ESA) of 1973, as amended. This programmatic document also assesses the Missouri River BSNP fish and wildlife mitigation project described in the 2003 Record of Decision (ROD) and authorized by the Water Resources Development Act (WRDA) of 1986, 1999, and 2007 as it relates to endangered species.
Notice of Intent To Prepare Supplement II to the Final Environmental Impact Statement, Mississippi River and Tributaries (MR&T) Project, Mississippi River Mainline Levees and Channel Improvement
Document Number: 2018-18723
Type: Notice
Date: 2018-08-29
Agency: Department of Defense, Department of the Army, Corps of Engineers
USACE is announcing the public scoping meeting dates, times, and locations and extending the scoping comment period for the Notice of Intent (NOI) to prepare Supplement II (SEIS II) to the Final Environmental Impact Statement, Mississippi River and Tributaries (MR&T) Project, Mississippi River Mainline Levees and Channel Improvement of 1976 (1976 EIS), as updated and supplemented by Supplement No. 1, Mississippi River and Tributaries Project, Mississippi River Mainline Levee Enlargement and Seepage Control of 1998 (SEIS I) to the 1976 EIS. The NOI was published in the Federal Register on July 13, 2018. The public comment period on the NOI was scheduled to end on October 1, 2018. USACE is extending the comment period by 14 days and will now consider comments received through October 15, 2018.
Availability of the Arlington National Cemetery Southern Expansion Project and Associated Roadway Realignment Draft Environmental Assessment, Arlington, VA
Document Number: 2018-17573
Type: Notice
Date: 2018-08-16
Agency: Department of Defense, Department of the Army, Corps of Engineers
The U.S. Army Corps of Engineers (USACE) Norfolk District, on behalf of the Arlington National Cemetery (ANC), announces the availability of a Draft Environmental Assessment (Draft EA) for the Arlington National Cemetery Southern Expansion Project and Associated Roadway Realignment project, for review and comment. The Draft EA evaluates the proposal to increase the cemetery's contiguous acreage, realign roadways, and maximize burial space by utilizing an area adjacent to the existing cemetery that includes the former Navy Annex site, located south of the existing cemetery, in Arlington, Virginia. The cemetery has been working with the owners and operators of the adjacent road network, Arlington County and the Virginia Department of Transportation, and the Federal Highway Administration, on a roadway realignment that supports the short- and long-term multimodal transportation system for the Commonwealth of Virginia and Arlington County.
Inland Waterways Users Board; Notice of Federal Advisory Committee Meeting
Document Number: 2018-17157
Type: Notice
Date: 2018-08-10
Agency: Department of Defense, Department of the Army, Corps of Engineers
The notice of an open meeting scheduled for August 30, 2018 published in the Federal Register on July 11, 2018 has a new date and time. The meeting will now be held on August 28, 2018 at 1:00 p.m.
Withdrawal of the Notice of Intent To Prepare an Environmental Impact Statement (EIS) for the City of Abilene, TX, Cedar Ridge Reservoir Water Supply Project
Document Number: 2018-16862
Type: Notice
Date: 2018-08-07
Agency: Department of Defense, Department of the Army, Corps of Engineers
The U.S. Army Corps of Engineers, Fort Worth District, Regulatory Division is notifying interested parties that it has withdrawn the Notice of Intent (NOI) to develop an EIS for the proposed Cedar Ridge Reservoir. The original NOI to Prepare an EIS was published in the Federal Register on Friday, April 13, 2018.
Availability of the Final Environmental Impact Statement for the Northern Integrated Supply Project, Larimer and Weld Counties, Colorado
Document Number: 2018-16861
Type: Notice
Date: 2018-08-07
Agency: Department of Defense, Department of the Army, Corps of Engineers
The comment period for the Availability of the Final Environmental Impact Statement for the Northern Integrated Supply Project, Larimer and Weld Counties, Colorado published in the Federal Register on Friday, July 20, 2018, and required comments be postmarked on or before September 4, 2018. The Corps is extending the deadline for submitting public comments to October 4, 2018.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.