Department of the Army, Corps of Engineers December 2017 – Federal Register Recent Federal Regulation Documents

Intent To Prepare a Draft Integrated Environmental Impact Statement (EIS) for the New Jersey Back Bays (NJBB) Coastal Storm Risk Management (CSRM) Feasibility Study
Document Number: 2017-27952
Type: Notice
Date: 2017-12-27
Agency: Department of Defense, Department of the Army, Corps of Engineers
The action being taken by the U.S. Army Corps of Engineers (USACE) is an evaluation of CSRM problems, and an evaluation of alternative structural, non-structural, and natural and nature-based feature (NNBF) measures to address the CSRM problems in the coastal communities of the New Jersey Back Bays and Coastal Lakes in Monmouth, Ocean, Burlington, Atlantic, and Cape May Counties, New Jersey. The purpose of any consequent work would be to implement any one or a number of recommended plans and/or strategies that address CSRM problems evaluated in the feasibility study and integrated environmental impact statement.
Meeting of the Chief of Engineers Environmental Advisory Board
Document Number: 2017-27585
Type: Notice
Date: 2017-12-22
Agency: Department of Defense, Department of the Army, Corps of Engineers
The Department of the Army is publishing this notice to announce the following Federal advisory committee meeting of the Chief of Engineers, Environmental Advisory Board (EAB). This meeting is open to the public. For additional information about the EAB, please visit the committee's website at https://www.usace.army.mil/Missions/ Environmental/EnvironmentalAdvisoryBoard.aspx.
Availability of Elizabeth River and Southern Branch Navigation Improvements Draft General Reevaluation Report/Environmental Assessment
Document Number: 2017-26724
Type: Notice
Date: 2017-12-12
Agency: Department of Defense, Department of the Army, Corps of Engineers
The U.S. Army Corps of Engineers (USACE) in association with the nonfederal sponsor, the Virginia Port Authority, an agent of the Commonwealth of Virginia, announces the availability of the Elizabeth River and Southern Branch Navigation Improvements Draft General Reevaluation Report/Environmental Assessment (GRR/EA) for public review and comment. The purpose of this Draft GRR/EA is to evaluate alternatives that have the potential to improve the current and future operational efficiency of commercial vessels currently using the Norfolk Harbor federal channel in the Elizabeth River. Channel deepening alternatives were evaluated as well as the No Action/Future without Project Alternative. Pursuant to the National Environmental Policy Act (NEPA) of 1969, as amended, the USACE developed the draft GRR/EA to examine and assess the impacts of the project alternatives and determined that implementation of the Proposed Action would not result in significant impacts.
Notice of Intent To Prepare a Joint Environmental Impact Statement/Environmental Impact Report for the San Francisco Bay to Stockton General Reevaluation Report, San Francisco Bay, California
Document Number: 2017-26051
Type: Notice
Date: 2017-12-04
Agency: Department of Defense, Department of the Army, Corps of Engineers
In accordance with the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers (USACE) South Atlantic Division and the Port of Stockton are preparing an Environmental Impact Statement and Environmental Impact Report (EIS/EIR) to evaluate the efficiency of the movement of goods along the existing deep-draft navigation route extending from the Golden Gate, through San Pablo Bay and Carquinez Strait, to deep draft facilities at Avon, California. This Notice of Intent (NOI) represents a supplemental notice to the March 4, 2016, NOI released for the San Francisco Bay to Stockton Navigation Improvement Study. This supplemental NOI is being released to notify the public that the study scope has been reduced to only consider improvements within the portion of the navigation project extending from San Francisco Bay to Avon. Work is now being conducted on an EIS/EIR with a reduced scope and project footprint, which is anticipated to be issued for public review in 2018. This NOI also re- opens the public scoping period. The 2016 NOI proposed to deepen the John F. Baldwin channel from the West Richmond Channel through the Pinole Shoal Channel, Bulls Head Reach and Suisun Bay Channel to New York Slough Channel to a maximum depth of 45 feet mean lower low water (MLLW) and the Stockton Deep Water Ship Channel to a maximum depth of 40 feet MLLW. As of September, 2017, the portion of the authorized navigation project to the east of Avon is no longer under consideration for formulation of navigation improvements. The revised study area extends from Central San Francisco Bay to Avon only and includes the West Richmond Channel, Pinole Shoal Channel, and Bulls Head Reach portion of the Suisun Bay Channel (west of Avon). The current authorized depth of this study area is 45 feet mean lower low water (MLLW), but is currently maintained at 35 feet MLLW. The forthcoming EIS/EIR is a single purpose navigation improvement project to evaluate incremental deepening to a maximum depth of 38 feet MLLW within the channel reaches of the revised study area only.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.