Department of the Army, Corps of Engineers June 3, 2016 – Federal Register Recent Federal Regulation Documents
Results 1 - 1 of 1
Availability of a Draft Integrated Feasibility Report (Feasibility Report/Environmental Impact Statement), Flood Risk Management Study, Little Colorado River at Winslow, Navajo County, AZ
The U.S. Army Corps of Engineers (Corps), in cooperation with Navajo County Flood Control District, announces the availability of a Draft Integrated Feasibility Report (Draft IFR) including Feasibility Report and Environmental Impact Statement (EIS) for the Little Colorado River at Winslow Flood Risk Management Study, Navajo County, AZ for review and comment. The study evaluates alternatives to reduce the risk of damages and to reduce the life, safety, and health risks caused by flooding of the Little Colorado River (LCR) to the City of Winslow, surrounding community, and public and private infrastructure. A Notice of Intent to prepare the Draft EIS was published in the Federal Register on February 27, 2009 (74 FR 8918).
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.