Department of the Army, Corps of Engineers November 2008 – Federal Register Recent Federal Regulation Documents

Notice of Availability for the Final Supplemental Environmental Impact Statement/Subsequent Environmental Impact Report for the Pacific L.A. Marine Terminal LLC Crude Oil Terminal Project, Los Angeles County, CA
Document Number: E8-28379
Type: Notice
Date: 2008-11-28
Agency: Department of Defense, Department of the Army, Corps of Engineers
The U.S. Army Corps of Engineers, Los Angeles District (Regulatory Division), in coordination with the Port of Long Angeles, has completed a Final Supplemental Environmental Impact Statement/ Subsequent Environmental Impact Report (SEIS/SEIR) for the Pacific L.A. Marine Terminal LLC Crude Oil Terminal Project. The Port of Los Angeles requires authorization pursuant to Section 404 of the Clean Water Act and Section 10 of the River and Harbor Act to build a new crude oil marine terminal at Berth 408 on Pier 400 including: construction of a new marine terminal to receive crude oil from marine vessels and transfer the oil to tank farms facilities via a new 42-inch-diameter, high-volume pipeline; construction of two tank farms, Tank Farm Site 1 located on Pier 400 and Tank Farm Site 2 located on Pier 300 at Seaside Avenue/Terminal Way; construction of new pipelines to connect the new tank farm facilities to existing pipeline facilities, with the new tank farm facilities connected to the existing ExxonMobil Southwest Terminal on Terminal Island, the existing Ultramar/Valero Refinery on Anaheim Street near the Terminal Island Freeway, and to Plains All American pipeline systems near Henry Ford Avenue and Alameda Street via new and existing 36-inch, 24-inch, and 16-inch pipelines, and with all new pipelines installed belowground, with the exception of the water crossings at the Pier 400 causeway bridge and at the Valero utility/ pipe bridge that crosses the Dominguez Channel west of the Ultramar/ Valero Refinery. The new tank farm facilities would provide a total of 4.0 million barrels (bbl) of capacity, primarily receiving crude oil, partially refined crude oil, and occasional deliveries of Marine Gas Oil (MGO).
Intent To Prepare a Draft Environment Impact Statement (DEIS) for a Proposed Highway Between Bush, LA and I-12, in St. Tammany Parish
Document Number: E8-27438
Type: Notice
Date: 2008-11-19
Agency: Department of Defense, Department of the Army, Corps of Engineers
The U.S. Army Corps of Engineers, New Orleans District, Regulatory Branch has received a request for Department of the Army authorization from the Louisiana Department of Transportation and Development to construct a modern, high-speed, 4-lane arterial highway from the southern terminus of the current modern 4-lane arterial portion of LA 21 in Bush, LA to I-12 in St. Tammany Parish, a distance of between 17.4 and 21 miles. The project proposes work in wetlands and structural crossings of various waterways in the project area. The EIS will be used to ensure compliance with the National Environmental Policy Act (NEPA), to determine the least damaging, yet practicable alternative and as a basis for the permit decision.
Intent To Prepare a Draft Environmental Impact Statement for Conveyance and Seepage Control Features Project
Document Number: E8-27434
Type: Notice
Date: 2008-11-19
Agency: Department of Defense, Department of the Army, Corps of Engineers
The Conveyance and Seepage Control Features (CSCF) project is part of the Modified Water Deliveries to Everglades National Park Project and is authorized by the 1992 General Design Memorandum and Environmental Impact Statement titled Central and Southern Florida Project for Flood Control and Other Purposes Modified Water Deliveries to Everglades National Park. The project will address potential features of the L-67A and L-67C levees, the L-67A Borrow Canal, and the L-29 Levee. The L-67A and L-67C Levees prevent overland flow from Water Conservation Area (WCA) 3A to WCA 3B and are located in north-central Miami-Dade County, FL. The purpose of this project is to improve conveyance through the L-67A and L-67C Levees to allow water to flow from WCA 3A to WCA 3B. The Corps proposes to add conveyance structures to the L-67A Levee, as well as plugs to the L-67A Borrow Canal with a boat channel through the middle of each plug. The proposed modifications for L-67C Levee include gaps through the levee. The L-29 Levee may have to be modified as a result of increased conveyance through the L-67A and L-67C Levees.
Missouri River Recovery Implementation Committee; Meeting
Document Number: E8-27432
Type: Notice
Date: 2008-11-19
Agency: Department of Defense, Department of the Army, Corps of Engineers
In accordance with Section 5018(b) of the Water Resources Act of 2007, announcement is made of the following committee meeting: Name of Committee: Missouri River Recovery Implementation Committee. Date: December 16-18, 2008. Time: 8 a.m.-7 p.m. (December 16, 2008). 8 a.m.-7 p.m. (December 17, 2008). 7 a.m.-1 p.m. (December 18, 2008). Place: Doubletree Hotel Downtown, Omaha, NE 68102.
Intent To Prepare a Draft Environmental Impact Statement for the Proposed Gray's Beach Restoration Project, Waikiki, O'ahu, HI, Department of the Army Regulatory File Number POH-2007-192
Document Number: E8-27176
Type: Notice
Date: 2008-11-17
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In order to establish a stable, sandy beach seaward of the Sheraton Waikiki Hotel, its owners propose to construct three T-head groins extending seaward from the existing seawall which defines the hotel property boundary. They propose to pump sand from nearby marine deposits and place it between the groins to form a protected beach. The proposed project site, which is within the State of Hawai'i Conservation District, would remain state-owned. The project site is located within the navigable waters of the United States and the proposed activity is subject to the regulatory jurisdiction of the U.S. Army Corps of Engineers.
Notice of Availability of the Final Environmental Impact Statement/Section 404 Permit Application for the Southern Beltway Transportation Project from I-79 to the Mon/Fayette Expressway, Washington County, PA
Document Number: E8-26970
Type: Notice
Date: 2008-11-14
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (Corps), in cooperation with the Pennsylvania Turnpike Commission and the U.S. Environmental Protection Agency, as a Cooperating Agency, have prepared a Final Environmental Impact Statement (FEIS)/Section 404 Permit Application for the Southern Beltway Transportation Project from I-79 to the Mon/ Fayette Expressway in Washington County, PA. The overall purpose of the project is to provide transportation mobility safety improvements, to relieve congestion, and to support economic development plans in southwestern Pennsylvania. The FEIS assesses the environmental effects of the various alternatives developed to address the project needs.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.