Notice of Availability of the Draft Supplemental Environmental Impact Statement (DSEIS) for the Nourishment of 25,000 Feet of Beach in Topsail Beach, Pender County, NC
Document Number: E8-17079
Type: Notice
Date: 2008-07-25
Agency: Department of Defense, Department of the Army, Corps of Engineers
The U.S. Army Corps of Engineers (USACE), Wilmington District, Wilmington Regulatory Field Office has received a request for Department of the Army authorization, pursuant to Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act, from the Town of Topsail Beach to conduct a one-time interim beach fill project to protect oceanfront development and infrastructure until such time that a federally authorized shore protection project can be implemented. While federal budget priorities have made it difficult to obtain funds for civil works projects in general and beach protection projects in particular, the projected earliest construction date for the federal project is 2012. A Draft General Reevaluation Report Environmental Impact Statement (GRR-EIS) has been prepared by the USACE and was released for public review and comment in June 2006 (USACE, 2006). Given the current status of the GRR-EIS and the need for Congressional authorization, funding, preparation of plans and specifications, and right-of-way acquisition, the federal project may not be implemented until Fiscal Year 2012, or possibly later. Accordingly, the Town would like to construct an interim project to protect its development and infrastructure during the period between now and the time the federal project is constructed. In order to account for any possible delays in the construction of the federal project, a construction date of 2016 was used in the development of the alternatives and economic analysis for the interim project. This would maintain the baseline conditions described in the Draft GRR and EIS.
Intent To Prepare an Environmental Impact Statement for Nebraska; Department of Roads Nebraska Highway 12 Niobrara East and West Project
Document Number: E8-17077
Type: Notice
Date: 2008-07-25
Agency: Department of Defense, Department of the Army, Corps of Engineers
The U.S. Army Corps of Engineers (Corps) is preparing an Environmental Impact Statement (EIS) to analyze the direct, indirect and cumulative effects of a proposed Nebraska State Highway project, Nebraska Highway 12 Niobrara East and West Project (project), by the Nebraska Department of Roads (NDOR). The project will provide a safe regional transportation corridor that meets Nebraska State Highway design standards. The project is needed due to interrupted use, high maintenance, roadway stability issues, driver safety during high water events, and the importance of maintaining Nebraska Highway 12 as a regional transportation corridor. Alternatives under consideration include: (1) Taking no action; (2) re-construction on existing alignment; (3) providing a new two-lane highway on new alignment; (4) reducing or eliminating existing flooding through evaluation of methods to reduce Lewis and Clark Lake elevation through operations and/or maintenance. NDOR and Corps have not selected a project alternative but will be exploring a range of alternatives through the National Environmental Policy Act (NEPA) process. Additional alternatives will be considered during the NEPA process. Construction of the project is expected to result in temporary and permanent impacts to jurisdictional waters of the United States, thereby requiring a Clean Water Act section 404 permit. The Corps has prepared a scoping document to familiarize other agencies, the public and interested organizations with the preliminary project alternatives and potential environmental issues that may be involved. The scoping document includes a description of the problems that create the need for the project, a preliminary list of project alternatives, and various environmental/resource issues that will be addressed in the EIS. Copies of the scoping document will be available at the public scoping meeting or can be requested by mail. The EIS will be prepared according to the Corps' procedures for implementing the National Environmental Policy Act (NEPA) of 1969, as amended, 42 U.S.C. 4332(2)(c), and consistent with the Corps' policy to facilitate public understanding and review of agency proposals.
Availability of Information Bulletin, for a Replacement Lock, Sault Locks Complex, Sault Sainte Marie, MI
Document Number: E8-17073
Type: Notice
Date: 2008-07-25
Agency: Department of Defense, Department of the Army, Department of the Army, Corps of Engineers
The U.S. Army Corps of Engineers (USACE), Detroit District, is issuing this notice to announce the availability of an Information Bulletin for a proposed Replacement Lock, Sault Locks Complex, Sault Sainte Marie, MI. This bulletin provides information on the National Environmental Policy Act (NEPA) review of the project that was presented in the Great Lakes Connecting Channels and Harbors Final Interim Feasibility Report and Environmental Impact Statement (EIS), 1986 and a Record of Environmental Consideration, 2000. Based upon the review of current site conditions and project plans, it appears that no new environmental impacts or issues have been identified since the 1986 FEIS and the 2000 Record of Environmental Consideration for the project. The planned construction of a second large lock at Sault Sainte Marie, MI, has been adequately assessed in accordance with NEPA and a Record of Decision (ROD) should be signed to allow construction to begin. The Bulletin is being provided for information and to solicit comments on any changed conditions or anticipated impacts that may effect the decision to sign the ROD.
Notice of Availability of a Supplemental Environmental Impact Statement/ Supplemental Environmental Impact Report (SEIS/SEIR) for the Port of Los Angeles Channel Deepening Project, Los Angeles, CA
Document Number: E8-16458
Type: Notice
Date: 2008-07-18
Agency: Department of Defense, Department of the Army, Corps of Engineers
The U.S. Army Corps of Engineers, Los Angeles District (USACE) and the Los Angeles Harbor Department (Port) have prepared a joint Supplemental Environmental Impact Statement/Supplemental Environmental Impact Report (SEIS/SEIR) for the Port of Los Angeles Channel Deepening Project, Los Angeles, California. This Draft SEIS/SEIR describes the affected resources and evaluates the potential impacts to those resources as a result of the Proposed Action and alternatives. The purpose of the Proposed Action is to dispose of approximately 3.0 million cubic yards of dredge material required to complete the Channel Deepening Project and to beneficially reuse the dredge material within the Port of Los Angeles. Three Alternatives have been analyzed in the Draft SEIS/SEIR, including No Action. Alternative 1, Port Development and Environmental Enhancement was developed with a focus on using dredge material for port development and environmental enhancement and would involve use and development of the following disposal sites: Berths 243-245, the Northwest Slip, CSWH Expansion, the Eelgrass Habitat Area, and LA-2. Alternative 2, Environmental Enhancement and Ocean Disposal was developed with a focus on environmental enhancement related uses of the remaining material and does not include any disposal options associated with port development. Under Alternative 2, dredge material would be disposed at the CSWH Expansion, Eelgrass Habitat Area, LA-2 and the Anchorage Road Soil Storage Site. Under Alternative 3, the No Action Alternative, no further dredging would take place and the Channel Deepening Project would not be completed. This Notice also serves as the Public Notice/Notice of Availability for the Section 404 Permit under Clean Water Act (CWA). A preliminary application has been received for a Department of the Army permit for the activity described herein. The Corps is considering an application submitted by the Port for a permit, in accordance with Section 404 of the CWA and Section 10 of the Rivers and Harbors Act, to complete dredging activities outside of the Federal Channel and placement of the dredge material in waters of the United States in the Port of Los Angeles. This SEIS/SEIR would be used by the Corps as part of their application review process. The Corps and the Port independently determined under the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA), respectively, that there are potential significant environmental impacts associated with the proposed action, and an Environmental Impact Statement and Environmental Impact Report are required.
United States Marine Corps Restricted Area and Danger Zone, Neuse River and Tributaries, Marine Corps Air Station Cherry Point, NC
Document Number: E8-16454
Type: Rule
Date: 2008-07-18
Agency: Department of Defense, Department of the Army, Corps of Engineers
The Corps of Engineers is amending its regulations to designate an existing rifle range fan as a danger zone. The military exercise area is located within the Rifle Range of Marine Corps Air Station Cherry Point, North Carolina, along the Neuse River. The danger zone will only be activated by the Marine Corps Air Station Cherry Point during range operational hours. The Marine Corps will advise residents in the vicinity of the range fan thus ensuring their safety by alerting them to temporary potential hazardous conditions which may exist as a result of small arms exercises. There will be no change in the use of the existing exercise area. The area will be marked on navigation charts to ensure security and safety for the public. Entry points into the danger zone will be prominently marked with signage indicating the boundary of the danger zone. The placement of aids to navigation and regulatory markers will be installed in accordance with the requirements of the United States Coast Guard. If the proposed signage exceeds nationwide permit and/or regional general permit conditions, the Commander, United States Marine Corps, Marine Corps Air Station Cherry Point, North Carolina, will seek additional Department of the Army authorizations.
Intent To Prepare a Draft Environmental Impact Statement for Potential Multipurpose Projects for Ecosystem Restoration, Flood Risk Management, and Recreation Development Within and Along Johnson Creek, Arlington, Tarrant County, TX
Document Number: E8-16446
Type: Notice
Date: 2008-07-18
Agency: Department of Defense, Department of the Army, Corps of Engineers
The study is being conducted in response to the authority contained in the Consolidated Appropriations Act, 2008. Pertinent text is quoted below:
Intent To Prepare a Joint Environmental Impact Statement/Environmental Impact Report for the Corte Madera Creek Flood Control Project, Marin County, CA
Document Number: E8-15329
Type: Notice
Date: 2008-07-07
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (Corps) authorized through the Flood Control Act of 1962, Public Law No. 87-4, 87th Congress, 2nd Session, approved October 23, 1962, and amended by Section 204 of Pub. L. No. 89-789, the Flood Control Act of 1966, and the Water Resources Development Act of 1986, will address channel modification opportunities to Unit 4 of Corte Madera Creek, Marin County, CA. The purpose of the Corte Madera Creek Flood Control Project is to provide flood risk management for Corte Madera Creek, from the upstream end of the existing Unit 3 concrete channel to Sir Francis Drake Boulevard at the border of Ross and San Anselmo. Although Units 1, 2, and 3 channel modifications were completed in 1971, public concerns led to a delay in the planned actions for Unit 4. In 1996, Marin County requested the completion of Unit 4 by the Corps, and damages incurred by the December 2005 flood have also renewed public interest in finding solutions to minimize the risk of future floods. Since 1971, additional technical studies were conducted that provide another opportunity to formulate and review new alternatives in order to complete the project. This is a notice of intent to prepare a joint Environmental Impact Statement/ Environmental Impact Report (EIS/EIR) to consider all reasonable alternatives and to evaluate potential impacts associated with the proposed actions. The U.S. Army Corps of Engineers is the lead agency for this project under the National Environmental Policy Act (NEPA) and Marin County Flood Control and Water Conservation District Zone 9 is the lead agency under the California Environmental Quality Act (CEQA).