Western Area Power Administration December 2024 – Federal Register Recent Federal Regulation Documents

Colorado River Storage Project-Rate Order No. WAPA-220
Document Number: 2024-30863
Type: Notice
Date: 2024-12-30
Agency: Department of Energy, Western Area Power Administration
The Colorado River Storage Project (CRSP) Management Center (MC) of the Western Area Power Administration (WAPA) proposes new formula rates for CRSP transmission and ancillary services for CRSP MC's costs to be recovered under the Southwest Power Pool's (SPP) Open Access Transmission Tariff (Tariff) should CRSP MC decide to become a member of SPP. The proposed formula rates will become effective on the latter of CRSP MC's membership date or the go-live date of the expansion of the SPP Regional Transmission Organization (RTO) into the Western Interconnection (scheduled for April 1, 2026, as of the date of this notice) and will remain in effect for 5 years from the effective date, which with an effective date of April 1, 2026, will be March 31, 2031, or until superseded.
Pick-Sloan Missouri Basin Program-Eastern Division-Rate Order No. WAPA-218
Document Number: 2024-30858
Type: Notice
Date: 2024-12-30
Agency: Department of Energy, Western Area Power Administration
The Upper Great Plains (UGP) region of the Western Area Power Administration (WAPA) proposes new formula rates for the Pick-Sloan Missouri Basin ProgramEastern Division (P-SMBPED) transmission and ancillary services for UGP's costs to be recovered under the Southwest Power Pool's (SPP) Open Access Transmission Tariff (Tariff) should UGP decide to expand its participation in SPP in the Western Interconnection. These rates will be used by UGP to provide rate data to SPP, the Regional Transmission Organization (RTO) of which UGP is a member, after SPP's planned expansion of the RTO into the Western Interconnection on April 1, 2026. The existing UGP rates for services expire on September 30, 2025, but are being extended under a separate rate process, Rate Order No, WAPA-217, to continue to provide existing rate data to SPP between October 1, 2025, and final implementation date of the planned RTO expansion into the Western Interconnection. The proposed rates will address UGP operating changes and new provisions and settlement requirements under the proposed revisions to SPP's Tariff filed with the Federal Energy Regulatory Commission (FERC) to accommodate their RTO expansion into the Western Interconnection. The proposed formula rates will become effective on the go-live date of the expansion of the SPP RTO into the Western Interconnection (scheduled for April 1, 2026, as of the date of this notice) and will remain in effect for five years from the effective date, which with an effective date of April 1, 2026, will be March 31, 2031, or until superseded.
Pick-Sloan Missouri Basin Program-Eastern Division-Rate Order No. WAPA-217
Document Number: 2024-30361
Type: Notice
Date: 2024-12-20
Agency: Department of Energy, Western Area Power Administration
The extension of the Upper Great Plains (UGP) region's existing Pick-Sloan Missouri Basin ProgramEastern Division (P-SMBP ED) transmission and ancillary services formula rates has been confirmed, approved, and placed into effect on an interim basis. The existing formula rates under Rate Schedules WAUGP-ATRR (Annual Transmission Revenue Requirement), WAUGP-AS1 (Scheduling, System Control, and Dispatch Service), WAUW-AS3 (Regulation and Frequency Response Service), WAUW- AS4 (Energy Imbalance Service), WAUW-AS5 (Operating ReserveSpinning Reserve Service), WAUW-AS6 (Operating ReserveSupplemental Reserve Service), and WAUW-AS7 (Generator Imbalance Service) are set to expire on September 30, 2025. This rate extension makes no changes to the existing formula rates and extends them through September 30, 2030.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.