Western Area Power Administration June 28, 2024 – Federal Register Recent Federal Regulation Documents
Results 1 - 2 of 2
Pick-Sloan Missouri Basin Program-Eastern Division-Rate Order No. WAPA-213
The Upper Great Plains (UGP) region of the Western Area Power Administration (WAPA) proposes revised formula rates for the Pick-Sloan Missouri Basin Program (P-SMBP)Eastern Division (ED) firm power, firm peaking power service, and sale of surplus products. The existing formula rates for these services, under Rate Schedules P-SED-F14 and P- SED-FP14, and sale of surplus products, under formula rate schedule P- SED-M2, do not expire until December 31, 2027; however, the existing firm power and firm peaking power service rates no longer provide sufficient revenue to recover interest expense and repay investments. The formula rate for sale of surplus products is not changing but is being included in Rate Order No. WAPA-213 (WAPA-213) in order to make these rate schedules effective for the same time frame.
Loveland Area Projects-Rate Order No. WAPA-212
The Rocky Mountain (RM) region of the Western Area Power Administration (WAPA) proposes revised formula rates for the Loveland Area Projects (LAP) firm electric service (FES) and sale of surplus products. LAP consists of the Fryingpan-Arkansas Project (Fry-Ark) and the Pick-Sloan Missouri Basin Program (P-SMBP)Western Division (WD), which were integrated for marketing and rate-making purposes in 1989. The existing formula rates for these services, under Rate Schedules L- F12 and L-M3, do not expire until December 31, 2027; however, the existing FES rate no longer provides sufficient revenues to recover interest expense and repay investments. The formula rate for sale of surplus products is not changing but is being included in Rate Order No. WAPA-212 (WAPA-212) in order to make these rate schedules effective for the same time frame.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.