Western Area Power Administration November 2023 – Federal Register Recent Federal Regulation Documents

Salt Lake City Area Integrated Projects and Colorado River Storage Project-Rate Order No. WAPA-206
Document Number: 2023-26049
Type: Notice
Date: 2023-11-27
Agency: Department of Energy, Western Area Power Administration
The provisional fixed rates for the Salt Lake City Area Integrated Projects (SLCA/IP) firm power service and the formula rates for the Colorado River Storage Project (CRSP) transmission services, ancillary services, sale of surplus products, and joint dispatch transmission service have been confirmed, approved, and placed into effect on an interim basis. The firm power rates under SLCA/IP Firm Power Rate Schedule SLIP-F12 expire December 31, 2023. Western Area Power Administration's (WAPA) CRSP Management Center (CRSP MC) is renewing all SLCA/IP and CRSP rates under one Federal Register notice (FRN), making all rates effective for the same period. These new rates replace existing firm power, transmission, ancillary services, sale of surplus products, and joint dispatch transmission service rates under Rate Orders No. WAPA-190, WAPA-195, and WAPA-199.
Extension of Public Comment Period for Central Valley Project Power, Transmission, and Ancillary Services; and the California-Oregon Transmission Project Transmission Service-Rate Order No. WAPA-207
Document Number: 2023-25432
Type: Notice
Date: 2023-11-17
Agency: Department of Energy, Western Area Power Administration
The Sierra Nevada Region (SN) of the Western Area Power Administration (WAPA) is extending the public comment period for 30 days on its proposed formula rates for Central Valley Project (CVP) power, transmission, and ancillary services; and California-Oregon Transmission Project (COTP) transmission service under Rate Order No. WAPA-207.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.