Western Area Power Administration June 2023 – Federal Register Recent Federal Regulation Documents

Desert Southwest Region-Rate Order No. WAPA-209
Document Number: 2023-13974
Type: Notice
Date: 2023-06-30
Agency: Department of Energy, Western Area Power Administration
The Desert Southwest Region (DSW) of the Western Area Power Administration (WAPA) proposes new formula rates for firm and nonfirm point-to-point (P2P) and network integration (Network) transmission service. DSW also proposes to revise the existing formula rates for Parker-Davis Project (PDP) firm electric service (FES) and firm transmission service of Salt Lake City Area/Integrated Projects (SLCA/ IP) power. The proposed new formula rates and revisions to existing formula rates would combine the transmission service rates of the Central Arizona Project (CAP), the southern portion of the Pacific Northwest-Pacific Southwest Intertie Project (Intertie), and PDP; and the facilities use charge for the Electrical District No. 5 to Palo Verde Hub Project (ED5-PVH). DSW's proposed formula rates will be effective January 1, 2024, through September 30, 2028. Publication of this Federal Register notice begins the formal process for the proposed formula rates.
Pacific Northwest-Pacific Southwest Intertie Project and Parker-Davis Project-Rate Order No. WAPA-210
Document Number: 2023-13368
Type: Notice
Date: 2023-06-23
Agency: Department of Energy, Western Area Power Administration
The Desert Southwest Region (DSW) of the Western Area Power Administration (WAPA) proposes to extend the existing transmission service rates for the Pacific Northwest-Pacific Southwest Intertie Project (Intertie) and the existing transmission and firm electric service formula rates for the Parker-Davis Project (PDP) through September 30, 2024. The existing rates and formula rates remain unchanged under Rate Schedules INT-FT5, INT-NFT4, PD-F7, PD-FT7, PD- FCT7, and PD-NFT7, which expire on September 30, 2023.
Salt Lake City Area Integrated Projects and Colorado River Storage Project-Rate Order No. WAPA-206
Document Number: 2023-13282
Type: Notice
Date: 2023-06-22
Agency: Department of Energy, Western Area Power Administration
The Colorado River Storage Project (CRSP) Management Center (MC) of the Western Area Power Administration (WAPA) proposes a new Salt Lake City Area Integrated Projects (SLCA/IP) firm power rate and updated effective dates for existing CRSP transmission, joint dispatch transmission, ancillary services, and sale of surplus products formula rates. The current firm power rate expires December 31, 2023. The CRSP transmission services, ancillary services, and surplus products rates that expire September 30, 2025, and the CRSP joint dispatch transmission service rate that expires September 30, 2024, are included in Rate Order No. WAPA-206 to make all the rate schedules effective for the same timeframe. The firm power service rate is proposed to remain the same. No material changes are proposed to the other rate schedules aside from updating the effective dates.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.