Western Area Power Administration November 2022 – Federal Register Recent Federal Regulation Documents

Loveland Area Projects-Rate Order No. WAPA-202
Document Number: 2022-25266
Type: Notice
Date: 2022-11-21
Agency: Department of Energy, Western Area Power Administration
The formula rates for the Rocky Mountain Region's (RMR) Loveland Area Projects (LAP) firm electric service and sale of surplus products have been confirmed, approved, and placed into effect on an interim basis (Provisional Formula Rates). LAP consists of the Fryingpan-Arkansas Project (Fry-Ark) and the Pick-Sloan Missouri Basin Program (P-SMBP)Western Division, which were integrated for marketing and rate-making purposes in 1989. These new formula rates replace the existing formula rates for these services under Rate Schedules L-F11, Firm Electric Service, and L-M2, Sale of Surplus Products, which expire on December 31, 2022. The LAP firm electric service rate is increasing 16.5 percent. There are no changes to the formula rate for sale of surplus products.
Pick-Sloan Missouri Basin Program-Eastern Division-Rate Order No. WAPA-203
Document Number: 2022-25267
Type: Notice
Date: 2022-11-21
Agency: Department of Energy, Western Area Power Administration
The formula rates for the Upper Great Plains Region (UGP) Pick-Sloan Missouri Basin ProgramEastern Division (P-SMBPED) firm power service, firm peaking power service, and sale of surplus products have been confirmed, approved, and placed into effect on an interim basis (Provisional Formula Rates). These new formula rates replace the existing formula rates for these services under Rate Schedules P-SED- F13, P-SED-FP13, and P-SED-M1, which expire on December 31, 2022. The P-SMBPED firm power service composite rate is increasing 16.3 percent. There are no changes to the formula rate for sale of surplus products.
Olmsted Powerplant Replacement Project-Rate Order No. WAPA-205
Document Number: 2022-24571
Type: Notice
Date: 2022-11-10
Agency: Department of Energy, Western Area Power Administration
The Colorado River Storage Project Management Center (CRSP MC) of the Western Area Power Administration (WAPA) proposes a new formula rate for the Olmsted Powerplant Replacement Project (Olmsted Project). The existing rate for this service under Rate Order WAPA-177 expires on May 6, 2023. There are no proposed changes to the existing formula rate in effect under Rate Order WAPA-177. WAPA proposes the new formula rate under Rate Order WAPA-205 will be effective May 1, 2023, through April 30, 2028.