Western Area Power Administration July 2021 – Federal Register Recent Federal Regulation Documents
Results 1 - 1 of 1
Desert Southwest Region and Western Area Lower Colorado Balancing Authority-Rate Order No. WAPA-200
The Desert Southwest Region (DSW) of the Western Area Power Administration (WAPA) proposes to extend existing formula rates for Network Integration Transmission Service (Network) on the Parker-Davis Project (P-DP) and Pacific Northwest-Pacific Southwest Intertie Project (Intertie), along with formula rates for ancillary services, transmission losses, and unreserved use penalties applicable to Western Area Lower Colorado Balancing Authority. The existing formula rates under Rate Schedules PD-NTS4, INT-NTS4, DSW-SD4, DSW-RS4, DSW-FR4, DSW- EI4, DSW-SPR4, DSW-SUR4, DSW-GI2, DSW-TL1, and DSW-UU1 expire on September 30, 2021. These rate schedules would remain unchanged and would be extended through September 30, 2026.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.