Western Area Power Administration April 2021 – Federal Register Recent Federal Regulation Documents

Colorado River Storage Project-Rate Order No. WAPA-195
Document Number: 2021-08494
Type: Notice
Date: 2021-04-23
Agency: Department of Energy, Western Area Power Administration
The Colorado River Storage Project Management Center (CRSP MC) of the Western Area Power Administration (WAPA) proposes a 5-year, Colorado River Storage Project (CRSP) Joint Dispatch Transmission Service (JDTS) formula rate for use under the Western Energy Imbalance Service (WEIS) Market through September 30, 2026. The proposed rate is unchanged from the existing rate for short-term sales of JDTS under Rate Schedule SP-NFJDT expiring September 30, 2021.
Loveland Area Projects and Western Area Colorado Missouri Balancing Authority-Rate Order No. WAPA-197
Document Number: 2021-08192
Type: Notice
Date: 2021-04-21
Agency: Department of Energy, Western Area Power Administration
The Rocky Mountain Region (RMR) of the Western Area Power Administration (WAPA) proposes to convert its existing rates for short- term sales for RMR to use under the WEIS Market to new long-term formula rates for use October 1, 2021, through September 30, 2024. The existing formula rates (approved under the WAPA Administrator's short- term rate authority) expire on September 30, 2021. No changes are being proposed to the existing formula rates under the rates for short-term sales Rate Schedules L-NFJDT (joint dispatch transmission), L-AS4 (energy imbalance), L-AS9 (generator imbalance), and L-AS7 (balancing authority real power losses).
Loveland Area Projects, Western Area Colorado Missouri Balancing Authority, and Colorado River Storage Project-Rate Order No. WAPA-196
Document Number: 2021-08191
Type: Notice
Date: 2021-04-21
Agency: Department of Energy, Western Area Power Administration
The Rocky Mountain Region (RMR) of the Western Area Power Administration (WAPA) proposes to extend existing formula rates for the Loveland Area Projects (LAP), the Western Area Colorado Missouri Balancing Authority (WACM), and the Colorado River Storage Project (CRSP) through September 30, 2024. The extended formula rates are unchanged from the existing formula rates applicable to LAP transmission services under rate schedules L-NT1 (network), L-FPT1 (firm point-to-point), L-NFPT1 (non-firm point-to-point), and L-UU1 (unreserved use), and applicable to LAP, WACM, and CRSP ancillary services under rate schedules L-AS1 (scheduling and dispatch), L-AS2 (reactive supply and voltage control (VAR) support), L-AS3 (regulation), L-AS5 (spinning reserves), and L-AS6 (supplemental reserves) that expire on September 30, 2021.
Boulder Canyon Project
Document Number: 2021-07702
Type: Notice
Date: 2021-04-15
Agency: Department of Energy, Western Area Power Administration
The Desert Southwest Region (DSW) of the Western Area Power Administration (WAPA) is proposing an adjustment to the base charge and rates for fiscal year (FY) 2022 Boulder Canyon Project (BCP) electric service under Rate Schedule BCP-F10. The proposal would increase the base charge 9 percent from $65.4 million in FY 2021 to $71.3 million in FY 2022. The change is primarily the result of an increase in Bureau of Reclamation's (Reclamation) replacement costs, an increase in WAPA's operations and maintenance expenses and replacement costs, and a decrease in prior year carryover funds from FY 2021. The proposed base charge and rates would go into effect on October 1, 2021 and remain in effect through September 30, 2022. Publication of this Federal Register notice will initiate the public process.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.