Western Area Power Administration August 2019 – Federal Register Recent Federal Regulation Documents

Boulder Canyon Project
Document Number: 2019-18220
Type: Notice
Date: 2019-08-23
Agency: Department of Energy, Western Area Power Administration
The Assistant Secretary for Electricity confirms, approves, and places into effect, on a final basis, the Boulder Canyon Project (BCP) base charge and rates for fiscal year (FY) 2020 under Rate Schedule BCP-F10. The base charge decreased by $3.3 million to $66.4 million, a 4.8% reduction from FY 2019. The reduction is primarily the result of an increase in non-power revenue projections for the Hoover Dam visitor center.
Pick-Sloan Missouri Basin Program-Eastern Division-Rate Order No. WAPA-188
Document Number: 2019-18163
Type: Notice
Date: 2019-08-22
Agency: Department of Energy, Western Area Power Administration
Western Area Power Administration (WAPA) proposes new formula rates for the Pick-Sloan Missouri Basin ProgramEastern Division (P- SMBPED) transmission and ancillary services. These rates will be used by WAPA's Upper Great Plains Region (UGP) to provide rate data to the Southwest Power Pool, Inc. (SPP), the Regional Transmission Organization of which UGP is a member. The existing rates for services expire on September 30, 2020. The proposed rates should not result in increased overall costs to customers compared to the current formula rates because the increase to the Operating Reserves rate is expected to be offset by a similar reduction in the transmission rate.