Western Area Power Administration May 10, 2019 – Federal Register Recent Federal Regulation Documents

Mohave County Wind Farm Project Record of Decision
Document Number: 2019-09677
Type: Notice
Date: 2019-05-10
Agency: Department of Energy, Western Area Power Administration
NextEra Energy Resources, LLC (NextEra), through its entity Mohave County Wind Farm, LLC, proposes to develop its Mohave County Wind Farm Project (Project) and interconnect it to Western Area Power Administration's (WAPA) Mead-Peacock 345-kilovolt (kV) transmission line. The Project site is located in the White Hills of Mohave County, Arizona, on lands managed by the U.S. Department of Interior, Bureau of Land Management (BLM) and Bureau of Reclamation (Reclamation). Based in part on the analysis in the final environmental impact statement (Final EIS), WAPA has determined to allow NextEra's request for interconnection to WAPA's transmission system on the Mead-Peacock 345- kV transmission line; to construct, own, operate, and maintain a new Project switchyard and associated communications equipment; and to replace or upgrade certain equipment in the Mead Substation to accommodate the Project.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.