Western Area Power Administration January 2008 – Federal Register Recent Federal Regulation Documents
Results 1 - 3 of 3
Proposed Information Collection To Be Submitted to the Office of Management and Budget (OMB) for Approval Under the Paperwork Reduction Act
The Western Area Power Administration (Western) invites public comment on a proposed collection of information that Western is developing for submission to the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1995.\1\ Western invites comments on: (1) Whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; (2) the accuracy of the agency's estimate of the burden of the proposed collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility, and clarity of the information to be collected; and (4) ways to minimize the burden of the collection of information on respondents, including through the use of automated collection techniques or other forms of information technology.
Record of Decision and Floodplain Statement of Findings for the Trinity Public Utilities District Direct Interconnection Project (DOE/EIS-0389)
The Western Area Power Administration (Western) intends to construct the Trinity Public Utilities District (PUD) Direct Interconnection Project (Project) in Trinity County, California. Consumers in the Trinity PUD service area routinely experience nearly 20,000 consumer hours per year in outages, according to the Trinity PUD. In the winter, many of the outages last three to four days before power can be restored. Western's Project would improve power system reliability in the area by providing a direct interconnection between Trinity PUD and Western's transmission system at the Trinity Power Plant. Western proposes to remove about 5.3 miles of existing 12- kilovolt (kV) distribution line, and construct, operate, and maintain about 16 miles of new 60-kV transmission line, a three-way switching structure and associated equipment, and a new switchyard. The Project would connect to Trinity PUD's system at its Lewiston Substation and at the new Weaverville Switchyard. Western is the lead Federal agency, and the U.S. Forest Service (USFS), U.S. Bureau of Land Management (BLM), and U.S. Bureau of Reclamation (Reclamation) are cooperating agencies that participated in the preparation of the environmental impact statement (EIS). Full implementation of the decision to construct this Project is contingent upon obtaining all applicable permits and approvals.
Salt Lake City Area Integrated Projects Firm Power, Colorado River Storage Project Transmission and Ancillary Services Rates-Rate Order No. WAPA-137
The Western Area Power Administration (Western) is proposing adjustments to the Salt Lake City Area Integrated Projects (SLCA/IP) firm power rates and the Colorado River Storage Project (CRSP) Transmission and Ancillary Services Rates. The SLCA/IP consists of the CRSP, Collbran, and Rio Grande projects, which were integrated for marketing and ratemaking purposes on October 1, 1987, and two participating projects of the CRSP that have power facilities, the Dolores and Seedskadee projects. The current rates, under Rate Schedule SLIP-F8, expire September 30, 2010, but are not sufficient to meet the SLCA/IP revenue requirements. The proposed rates will provide sufficient revenue to pay all annual costs, including operation, maintenance, and replacements (OM&R), interest expenses, and the required repayment of investment within the allowable period. The only proposed changes to the CRSP Transmission and Ancillary Services Rates are to change the expiration dates to September 30, 2010, in alignment with the SLCA/IP firm power rates. Western will prepare a brochure that provides detailed information on the rates to all interested parties. The proposed rates under Rate Schedules SLIP-F9, SP-PTP7, SP-NW3, SP-NFT6, SP-CF1, SP-SD3, SP-RS3, SP-EI3, SP-FR3, and SP-SSR3 are scheduled to go into effect on October 1, 2008. Publication of this Federal Register notice begins the formal process for the proposed rates.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.