Southwestern Power Administration 2021 – Federal Register Recent Federal Regulation Documents
Results 1 - 5 of 5
Integrated System Rate Schedules
The Administrator, Southwestern Power Administration (Southwestern) has approved and placed into effect on an interim basis Rate Order No. SWPA-77, which extends the following existing Southwestern Integrated System rate schedules: Rate Schedule P-13A, Wholesale Rates for Hydro Peaking Power; Rate Schedule NFTS-13A, Wholesale Rates for Non-Federal Transmission/Interconnection Facilities Service; and Rate Schedule EE-13, Wholesale Rates for Excess Energy. This is an interim rate action effective October 1, 2021, extending for a period of two years through September 30, 2023.
Robert D. Willis Hydropower Project Rate Schedule
The Administrator, Southwestern Power Administration (Southwestern) has approved and placed into effect on an interim basis Rate Order No. SWPA-79, which extends the following existing Southwestern Robert D. Willis Hydropower Project rate: Rate Schedule RDW-15, Wholesale Rates for Hydro Power and Energy. This is an interim rate action effective October 1, 2021, extending for a period of two years through September 30, 2023.
Sam Rayburn Dam Rate Schedule
The Administrator, Southwestern Power Administration (Southwestern) has approved and placed into effect on an interim basis Rate Order No. SWPA-78, which extends the following existing Southwestern Sam Rayburn Dam Hydropower Project rate schedule: Rate Schedule SRD-15, Wholesale Rates for Hydro Power and Energy. This is an interim rate action effective October 1, 2021, extending for a period of two years through September 30, 2023.
2021 Continuation of Temporary Power Sales Program
Southwestern Power Administration (Southwestern) is accepting new applications under its Temporary Power Sales Program for 2021. Electric utility organizations interested in participating in the Temporary Power Sales Program should notify Southwestern of their interest by providing the information requested in the enclosed Resource Data Form B-2 and/or Resource Data Form L-2 to Southwestern.
Integrated System, Sam Rayburn Dam, and Robert D. Willis Rate Schedules
The Administrator, Southwestern Power Administration (Southwestern), is proposing a two-year extension to the currently approved rate schedules for the Integrated System, the Sam Rayburn Dam, and the Robert Douglas Willis Hydropower Project (Robert D. Willis) for the period of October 1, 2021 to September 30, 2023. Southwestern's current Integrated System rate schedules (P-13A, NFTS-13A, and EE-13), the Sam Rayburn Dam rate schedule (SRD-15), and the Robert D. Willis rate schedule (RDW-15), expire September 30, 2021.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.