Integrated System Rate Schedule Changes
The Administrator, Southwestern Power Administration (Southwestern), has determined that revisions to the Real Power Losses provisions within existing rate schedules P-06 and NFTS-06 are required. The Federal Energy Regulatory Commission (FERC) confirmed and approved such rates on February 27, 2007 in Docket No. EF07-4011-000 (118 FERC ]62,162) for the period from October 1, 2006 through September 30, 2010. Since the proposed rate schedule revisions are limited only to Real Power Losses, the net result of the 2006 Integrated System Power Repayment Studies, which was the basis for the existing rate schedules, will not be altered. Southwestern held several meetings during FY 2008 with customers to discuss the proposed rate schedule revisions and provide opportunity for input in the development of the final rate schedules. As a result of these informal meetings, it was determined that the revised rate schedule provisions can provide cost-savings and operational benefits to Southwestern's transmission customers and are consistent with (FERC) Order No. 888.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.