Southwestern Power Administration August 29, 2005 – Federal Register Recent Federal Regulation Documents
Results 1 - 2 of 2
Sam Rayburn Dam Power Rate
The Administrator, Southwestern Power Administration (Southwestern), has prepared Current and Revised 2005 Power Repayment Studies that show the need for an increase in annual revenues to meet cost recovery criteria. Such increased revenues are required due to significant increases in expected U.S. Army Corps of Engineers' generation investment and slight increases in operations and maintenance expenses at the project. The Administrator has developed a proposed Sam Rayburn Dam rate schedule, which is supported by a power repayment study, to recover the required revenues. Beginning January 1, 2006, the proposed rate would increase annual revenues 12 percent from $2,513,724 to $2,816,064.
Robert D. Willis Power Rate
The Administrator, Southwestern Power Administration (Southwestern), has prepared Current and Revised 2005 Power Repayment Studies that show the need for an increase in annual revenues to meet cost recovery criteria. Such increased revenues are required primarily due to significant increases in expected U.S. Army Corps of Engineers' generation investment and increases in operations and maintenance expenses at the project. The Administrator has developed a proposed Robert D. Willis rate schedule, which is supported by a power repayment study, to recover the required revenues. Beginning January 1, 2006, the proposed rates would increase annual revenues approximately 43.1 percent from $452,952 to $648,096.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.