Southwestern Power Administration August 16, 2005 – Federal Register Recent Federal Regulation Documents

Integrated System Power Rates
Document Number: 05-16190
Type: Notice
Date: 2005-08-16
Agency: Department of Energy, Southwestern Power Administration
The Administrator, Southwestern Power Administration (Southwestern), has prepared Current and Revised 2005 Power Repayment Studies which show the need for an increase in annual revenues to meet cost recovery criteria. Such increased revenues are needed primarily to cover increased investments and replacements in hydroelectric generating and high-voltage transmission facilities and increased operation and maintenance expenses. The Administrator has developed proposed Integrated System rates, which are supported by a rate design study, to recover the required revenues. Beginning January 1, 2006, and thereafter, the proposed rates would increase annual system revenues approximately 7.1 percent from $124,552,200 to $133,342,029.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.