Southeastern Power Administration August 2020 – Federal Register Recent Federal Regulation Documents

Notice of Interim Approval of Rate Schedules for Cumberland System
Document Number: 2020-18822
Type: Notice
Date: 2020-08-27
Agency: Department of Energy, Southeastern Power Administration
The Administrator for the Southeastern Power Administration (Southeastern) has confirmed and approved, on an interim basis, new rate schedules CBR-1-J, CSI-1-J, CEK-1-J, CM-1-J, CC-1-K, CK-1-J, CTV- 1-J, CTVI-1-C, and Replacement-3. The rate schedules are approved on an interim basis through September 30, 2025, and are subject to confirmation and approval by the Federal Energy Regulatory Commission (FERC) on a final basis.
Notice of Interim Approval of Rate Schedules for Kerr-Philpott System
Document Number: 2020-18821
Type: Notice
Date: 2020-08-27
Agency: Department of Energy, Southeastern Power Administration
The Administrator for the Southeastern Power Administration (Southeastern) has confirmed and approved, on an interim basis, new rate schedules VA-1-D, VA-2-D, VA-3-D, VA-4-D, DEP-1-D, DEP-2-D, DEP-3- D, DEP-4-D, AP-1-D, AP-2-D, AP-3-D, AP-4-D, NC-1-D, and Replacement-2- C. These rate schedules are applicable to Southeastern power sold to existing preference customers in the Virginia and North Carolina service area. The rate schedules are approved on an interim basis through September 30, 2025, and are subject to confirmation and approval by the Federal Energy Regulatory Commission (FERC) on a final basis.