Energy Efficiency and Renewable Energy Office August 12, 2011 – Federal Register Recent Federal Regulation Documents
Results 1 - 2 of 2
Decision and Order Granting a Waiver to Fujitsu General Limited From the Department of Energy Commercial Package Air Conditioner and Heat Pump Test Procedures
This notice publishes the U.S. Department of Energy's (DOE) Decision and Order in Case No. CAC-033, which grants Fujitsu General Limited (Fujitsu) a waiver from the existing DOE test procedures applicable to commercial package air-source central air conditioners and heat pumps. The waiver is specific to the Fujitsu AIRSTAGE V-II Variable Refrigerant Flow (VRF) multi-split commercial heat pump models specified in Fujitsu's petition for waiver. As a condition of this waiver, Fujitsu must use the alternate test procedure set forth in this notice to test and rate these AIRSTAGE V-II VRF multi-split commercial heat pumps.
Decision and Order Granting a Waiver to Samsung From the Department of Energy Residential Clothes Washer Test Procedure
The U.S. Department of Energy (DOE) gives notice of the decision and order (Case No. CW-019) that grants to Samsung Electronics America, Inc. (Samsung) a waiver from the DOE clothes washer test procedure for determining the energy consumption of clothes washers for the basic models set forth in its petition for waiver. Under today's decision and order, Samsung shall be required to test and rate these clothes washers with larger clothes containers using an alternate test procedure that takes the larger capacities into account when measuring energy consumption.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.