Department of Energy March 2018 – Federal Register Recent Federal Regulation Documents

Results 151 - 166 of 166
Notice of Institution of Section 206 Proceeding and Refund Effective Date; RockGen Energy, LLC
Document Number: 2018-04379
Type: Notice
Date: 2018-03-05
Agency: Department of Energy, Federal Energy Regulatory Commission
Reliability Technical Conference; Notice of Technical Conference
Document Number: 2018-04378
Type: Notice
Date: 2018-03-05
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings
Document Number: 2018-04377
Type: Notice
Date: 2018-03-05
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings #1
Document Number: 2018-04376
Type: Notice
Date: 2018-03-05
Agency: Department of Energy, Federal Energy Regulatory Commission
Southwest Gas Corporation; Notice of Application
Document Number: 2018-04354
Type: Notice
Date: 2018-03-05
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings
Document Number: 2018-04305
Type: Notice
Date: 2018-03-02
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings #1
Document Number: 2018-04304
Type: Notice
Date: 2018-03-02
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings #1
Document Number: 2018-04303
Type: Notice
Date: 2018-03-02
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings
Document Number: 2018-04302
Type: Notice
Date: 2018-03-02
Agency: Department of Energy, Federal Energy Regulatory Commission
Proposed Agency Information Collection
Document Number: 2018-04286
Type: Notice
Date: 2018-03-02
Agency: Department of Energy
The Department of Energy (DOE) invites public comment on a proposed collection of information that DOE is developing for submission to the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1995.
Application for Presidential Permit; GridAmerica Holdings Inc.
Document Number: 2018-04285
Type: Notice
Date: 2018-03-02
Agency: Department of Energy
GridAmerica Holdings Inc. (GridAmerica) has applied for a Presidential permit to construct, operate, maintain, and connect an electric transmission line across the United States border with Canada.
Combined Notice of Filings
Document Number: 2018-04140
Type: Notice
Date: 2018-03-01
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings #1
Document Number: 2018-04139
Type: Notice
Date: 2018-03-01
Agency: Department of Energy, Federal Energy Regulatory Commission
Pieridae Energy (USA), Ltd.
Document Number: 2018-04135
Type: Notice
Date: 2018-03-01
Agency: Department of Energy
The Office of Fossil Energy (FE) of the Department of Energy (DOE) gives notice of receipt of two related Notices of Change in Control (Notice or, collectively, Notices) filed by Pieridae Energy (USA), Ltd. (Pieridae US) in the above-referenced docket. The first Notice, filed on May 21, 2017, described a planned change in control of Pieridae Energy Limited, the parent company of Pieridae US. In the second Notice, filed on November 1, 2017, Pieridae US confirmed that the planned change in control had occurred. The Notices were filed under the Natural Gas Act (NGA).
Southern LNG Company, L.L.C.; Application for Blanket Authorization To Export Liquefied Natural Gas to Non-Free Trade Agreement Countries on a Short-Term Basis
Document Number: 2018-04121
Type: Notice
Date: 2018-03-01
Agency: Department of Energy
The Office of Fossil Energy (FE) of the Department of Energy (DOE) gives notice of receipt of an application (Application), filed on February 1, 2018, by Southern LNG Company, L.L.C. (Southern LNG). The Application requests blanket authorization to export domestically produced and previously imported liquefied natural gas (LNG) in an amount up to the equivalent of 255 billion cubic feet (Bcf) of natural gas on a cumulative basis over a two-year period, commencing on the date of the initial short-term export. The LNG would be exported from the Elba Liquefaction Project (Liquefaction Project), which is currently under construction at the Elba Island Terminal on Elba Island, Chatham County, Georgia. Southern LNG requests authorization to export the LNG to any country with the capacity to import LNG via ocean-going carrier and with which trade is not prohibited by U.S. law or policy, including both countries with which the United States has entered into a free trade agreement (FTA) requiring national treatment for trade in natural gas (FTA countries) and all other countries (non- FTA countries). Southern LNG seeks to export this LNG before commercial operations at the Liquefaction Project begin. Southern LNG requests this authorization on its own behalf and as agent for other entities who hold title to the natural gas at the time of export. Additional details can be found in Southern LNG's Application, posted on the DOE/ FE website at: https://energy.gov/fe/southern-lng-company-llc-18-15- lng-export-lng. Protests, motions to intervene, notices of intervention, and written comments are invited.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.