Department of Energy 2017 – Federal Register Recent Federal Regulation Documents
Results 901 - 950 of 1,901
Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps
The Department of Energy (DOE) has postponed the effectiveness of certain provisions of a final rule, published in the Federal Register on January 5, 2017, that amends the test procedure and specific certification, compliance, and enforcement provisions for central air conditioners and heat pumps. Specifically, DOE postponed the effectiveness of two provisions of a recently issued rule that require outdoor unit models to be tested under the outdoor unit with no match if they meet either of the two following conditions: The outdoor unit is approved for use with a refrigerant that has a 95 [deg]F midpoint saturation absolute pressure that is +/- 18 percent of the 95 [deg]F saturation absolute pressure for HCFC-22; or the unit is shipped requiring the addition of more than two pounds of refrigerant to meet the charge required for testing under the rule and the factory charge is not equal to or greater than 70% of the outdoor unit internal volume times the liquid density of refrigerant at 95 [deg]F.
Public Hearing on The Navajo Nation Tribal Government Weatherization Assistance Program
The Department of Energy (DOE) is announcing an ``Administrative Review Hearing on The Navajo Nation Tribal Government Weatherization Assistance Program.'' The Navajo Nation Tribal Government requested this administrative review hearing to review DOE's decision to cancel negotiations for financial assistance award #DE- EE0007932 and future DOE Weatherization Assistance Program (WAP) financial assistance awards to The Navajo Nation Tribal Government.
Application To Amend Presidential Permit; Vermont Electric Power Company, Inc., as Agent for the Joint Owners of the Highgate Interconnection Facilities
Vermont Electric Power Company, Inc. (``VELCO''), as operating-and-management agent for the Joint Owners of the Highgate Transmission Interconnection Facilities (the ``Highgate Joint Owners'') filed an application to amend PP-82, issued on May 14, 1985 and amended on March 1, 1994, September 3, 2003, February 7, 2005 and again on May 3, 2016. VELCO requested that DOE reflect changes in ownership of the Highgate Transmission Facility.
Energy Conservation Program: Test Procedures for Compressors
On January 4, 2017, the U.S. Department of Energy (``DOE'') published a final rule establishing new test procedures for certain varieties of compressors. The final rule established definitions, materials incorporated by reference, sampling plans, representations requirements, enforcement provisions and test procedures for certain varieties of compressors. Since that time, DOE has received correspondence, raising concerns that certain issues and information may not have been fully considered during the original rulemaking proceeding and also indicating further clarification may be needed to implement the rule as adopted. As a result, by this RFI, DOE is soliciting further data and information regarding the compressor test procedure and announcing that DOE will not seek to enforce the test procedure rule for 180 days (i.e., until December 30, 2017) while it considers the data and information already submitted and any further material submitted in response to this request for information.
Environmental Management Site-Specific Advisory Board, Northern New Mexico
This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Northern New Mexico. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.
Energy Conservation Program: Energy Conservation Standards for Walk-In Cooler and Freezer Refrigeration Systems
The Energy Policy and Conservation Act of 1975 (``EPCA''), as amended, prescribes energy conservation standards for various consumer products and certain commercial and industrial equipment, including walk-in coolers and walk-in freezers. This final rule details a series of energy conservation standards pertaining to certain discrete classes of refrigeration systems used in this equipment. These standards, which are consistent with recommendations presented by a working group that included refrigeration system manufacturers, installers, and energy efficiency advocates, have been determined to result in the significant conservation of energy and achieve the maximum improvement in energy efficiency that is technologically feasible and economically justified.
Notice of Availability for Public Comment of Interconnection Facilities Studies Summary Prepared for the Proposed Northern Pass Transmission Project
Northern Pass Transmission LLC (NPT) applied to the U.S. Department of Energy (DOE) for a Presidential permit to construct, operate, maintain, and connect an electric transmission line across the U.S. border with Canada, currently referred to as the Northern Pass Project. NPT would construct and operate an overhead high-voltage direct current (HVDC) electric transmission line that is to originate at an HVDC converter station near Sherbrooke, Qu[eacute]bec, Canada; connect to a facility in Franklin, New Hampshire, that will convert the line's direct current to alternating current (AC); and continue from there to its southern terminus in Deerfield, New Hampshire. The proposed facilities will be capable of transmitting up to 1,090 megawatts (MW) of power. The amended applications are summarized below. DOE hereby announces the availability for public comment of a summary of the interconnection facilities studies prepared for the NPT project.
Eagle LNG Partners Jacksonville II LLC; Application for Long-Term, Multi-Contract Authorization To Export Liquefied Natural Gas to Non-Free Trade Agreement Nations
The Office of Fossil Energy (FE) of the Department of Energy (DOE) gives notice of receipt of an application (Application), filed on June 15, 2017, by Eagle LNG Partners Jacksonville II LLC (Eagle Maxville), requesting long-term, multi-contract authorization to export domestically produced liquefied natural gas (LNG) in a volume equivalent to 7.7 million cubic feet per day of natural gas, or approximately 0.01 billion cubic feet (Bcf) per day (2.8 Bcf per year). Eagle Maxville seeks authorization to export this LNG from its LNG production and storage facility in Jacksonville, Duval County, Florida (the Maxville Facility), which is anticipated to begin commercial operation in September 2017. Eagle Maxville requests authorization to export this LNG to countries with which trade is not prohibited by U.S. law or policy, including both countries with which the United States has entered into a free trade agreement (FTA) requiring national treatment for trade in natural gas (FTA countries) and all other countries (non-FTA countries). At the Maxville Facility, Eagle Maxville anticipates it will process domestically produced natural gas into LNG, temporarily store the produced LNG, and load the LNG into cryogenic transport trailers or approved ISO IMO7-TVAC-ASME LNG (ISO) containers for transportation by truck to port facilities for transfer into vessels or other ocean-going container ships. Eagle Maxville is requesting this authorization on its own behalf and as agent for other entities who hold title to the natural gas at the time of export. Eagle Maxville requests the authorization for a 20-year term to commence on the earlier date of the first export or five years from the date of a final order granting export authorization. Eagle Maxville filed the Application under section 3 of the Natural Gas Act (NGA). Additional details can be found in Eagle Maxville's Application, posted on the DOE/FE Web site at https://www.energy.gov/fe/downloads/eagle-lng- partners-jacksonville-ii-llc-fe-dkt-no-17-79-lng. Protests, motions to intervene, notices of intervention, and written comments are invited.
Pick-Sloan Missouri Basin Program-Eastern Division-Rate Order No. WAPA-180
Western Area Power Administration (WAPA) is proposing revised rates for Pick-Sloan Missouri Basin ProgramEastern Division (P-SMBP ED) firm power and firm peaking power service, and a new formula rate for sales of surplus products. Current firm power and firm peaking power service rates, under Rate Schedules P-SED-F12 and P-SED-FP12, are in effect through December 31, 2019. WAPA is proposing to lower the overall charges for firm power and firm peaking power service by 19 percent, as a result of rebalancing the charge components in formula-based Rate Schedules P-SED-F12 and P- SED-FP12 by reducing the drought adder component, increasing the base component, and removing the voltage discount. The proposed rates will provide sufficient revenue to pay all annual costs, including interest expense, and repay investments within the allowable periods. In addition, WAPA is proposing a new formula rate for the sale of surplus products under Rate Schedule P-SED-M1. This new rate schedule will allow for the sale of generation and generation- related products in excess of WAPA's P-SMBPED firm power obligations at market rates. WAPA will prepare a brochure providing detailed information on these proposed rates prior to the public information forums listed below. This brochure will be posted to WAPA's Web site at https://www.wapa.gov/regions/UGP/rates/Pages/2018-firm-rate- adjustment.aspx. If approved, the proposed rates, under Rate Schedules P-SED-F13, P-SED-FP13, and P-SED-M1 would become effective on January 1, 2018, and would remain in effect through December 31, 2022, or until superseded. Publication of this Federal Register notice begins the formal process for the proposed rate adjustment and new sale of surplus products formula rate.
Loveland Area Projects-Rate Order No. WAPA-179
The Western Area Power Administration (WAPA) is proposing revised rates for the Loveland Area Projects (LAP) firm electric service and modifications to the existing rate schedule for Sale of Surplus Products. Current firm electric service rates, under Rate Schedule L-F10, are in effect through December 31, 2019, and the formula rate for the sale of surplus products, under Rate Schedule L- M1, is in effect through September 30, 2021. LAP consists of the Fryingpan-Arkansas Project (Fry-Ark) and the Pick-Sloan Missouri Basin Program (P-SMBP)Western Division (WD), which were integrated for marketing and rate-making purposes in 1989. WAPA is proposing to lower the overall LAP firm electric service charges by 14 percent, as a result of rebalancing the charge components in formula-based Rate Schedule L-F10 by reducing the drought adder component and increasing the base component. The proposed rates will provide sufficient revenue to pay all annual costs, including interest expense, and repay investments within the allowable periods. In addition, WAPA is proposing to modify Rate Schedule L-M1, which allows for the sale of generation and generation-related products in excess of LAP's firm electric service obligations, to add ``energy'' as a surplus product. WAPA will prepare a brochure providing detailed information on these proposed rates prior to the public information forums listed below. This brochure will be posted to WAPA's Web site at: https:// www.wapa.gov/regions/RM/rates/Pages/2018-Rate-AdjustmentFirm- Power.aspx. If approved, the proposed rates under Rate Schedules L-F11 and L-M2 would become effective on January 1, 2018, and would remain in effect through December 31, 2022, or until superseded. Publication of this Federal Register notice begins the formal process for the proposed rate adjustment and proposed rate modifications.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.