Department of Energy December 5, 2013 – Federal Register Recent Federal Regulation Documents

Combined Notice of Filings #1
Document Number: 2013-29057
Type: Notice
Date: 2013-12-05
Agency: Department of Energy, Federal Energy Regulatory Commission
Monitoring System Conditions-Transmission Operations Reliability Standards; Interconnection Reliability Operations and Coordination Reliability Standards
Document Number: 2013-28629
Type: Proposed Rule
Date: 2013-12-05
Agency: Department of Energy, Federal Energy Regulatory Commission
Pursuant to section 215 of the Federal Power Act (FPA), the Commission proposes to remand revisions to the Transmission Operations and Interconnection Reliability Operations and Coordination Reliability Standards, developed by the North American Electric Reliability Corporation (NERC), which the Commission has certified as the Electric Reliability Organization responsible for developing and enforcing mandatory Reliability Standards. In addition, the Commission proposes to approve NERC's proposed revisions to Reliability Standard TOP-006-3.
Small Generator Interconnection Agreements and Procedures
Document Number: 2013-28515
Type: Rule
Date: 2013-12-05
Agency: Department of Energy, Federal Energy Regulatory Commission
In this Final Rule, the Federal Energy Regulatory Commission (Commission) is amending the pro forma Small Generator Interconnection Procedures (SGIP) and pro forma Small Generator Interconnection Agreement (SGIA) to: Incorporate provisions that provide an Interconnection Customer with the option of requesting from the Transmission Provider a pre-application report providing existing information about system conditions at a possible Point of Interconnection; revise the 2 megawatt (MW) threshold for participation in the Fast Track Process included in section 2 of the pro forma SGIP; revise the customer options meeting and the supplemental review following failure of the Fast Track screens so that the supplemental review is performed at the discretion of the Interconnection Customer and includes minimum load and other screens to determine if a Small Generating Facility may be interconnected safely and reliably; revise the pro forma SGIP Facilities Study Agreement to allow the Interconnection Customer the opportunity to provide written comments to the Transmission Provider on the upgrades required for interconnection; revise the pro forma SGIP and the pro forma SGIA to specifically include energy storage devices; and clarify certain sections of the pro forma SGIP and the pro forma SGIA. The reforms should ensure interconnection time and costs for Interconnection Customers and Transmission Providers are just and reasonable and help remedy undue discrimination, while continuing to ensure safety and reliability.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.