Department of Energy February 2013 – Federal Register Recent Federal Regulation Documents

Results 151 - 154 of 154
Energy Efficiency Program for Commercial and Industrial Equipment: Public Meeting and Availability of the Framework Document for Commercial and Industrial Pumps
Document Number: 2013-02171
Type: Proposed Rule
Date: 2013-02-01
Agency: Department of Energy
The U.S. Department of Energy (DOE) is considering energy conservation standards for commercial and industrial pumps. To inform interested parties and to facilitate this process, DOE has prepared a Framework Document that details the analytical approach and preliminary scope of the rulemaking, and identifies several issues on which DOE is particularly interested in receiving comments. DOE will hold a public meeting to discuss and receive comments on its planned analytical approach and issues it will address in this rulemaking proceeding. DOE welcomes written comments and relevant data from the public on any subject within the scope of this rulemaking. A copy of the Framework Document is available at: https://www1.eere.energy.gov/buildings/ appliancestandards/rulemaking.aspx/ruleid/14.
National Coal Council
Document Number: 2013-02167
Type: Notice
Date: 2013-02-01
Agency: Department of Energy
This notice announces a meeting of the National Coal Council (NCC). The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of these meetings be announced in the Federal Register.
Energy Conservation Program: Energy Conservation Standards for Small, Large, and Very Large Commercial Package Air Conditioning and Heating Equipment
Document Number: 2013-02164
Type: Proposed Rule
Date: 2013-02-01
Agency: Department of Energy
Pursuant to the American Energy Manufacturing Technical Corrections Act, the U.S. Department of Energy (DOE) is initiating an effort to determine whether to amend the current energy conservation standards for certain commercial air-conditioning and heating equipment. This notice seeks to solicit information from the public to help DOE determine whether national standards more stringent than those that are currently in place would result in a significant amount of additional energy savings and whether those national standards would be technologically feasible and economically justified. Separately, DOE also seeks information from the public on the merits of adopting the integrated energy efficiency ratio (IEER) as the energy efficiency descriptor for small, large, and very large air-cooled commercial air conditioners and heat pumps.
Small Generator Interconnection Agreements and Procedures
Document Number: 2013-01366
Type: Proposed Rule
Date: 2013-02-01
Agency: Department of Energy, Federal Energy Regulatory Commission
The Federal Energy Regulatory Commission (Commission) is proposing to revise the pro forma Small Generator Interconnection Procedures (SGIP) and pro forma Small Generator Interconnection Agreement (SGIA) originally set forth in Order No. 2006. The pro forma SGIP and SGIA establish the terms and conditions under which public utilities must provide interconnection service to Small Generating Facilities of no more than 20 megawatts (MW). In this Notice of Proposed Rulemaking (NOPR), the Commission proposes to modify the pro forma SGIP to: (1) Incorporate provisions that would provide an Interconnection Customer with the option of requesting from the Transmission Provider a pre-application report providing existing information about system conditions at a possible Point of Interconnection; (2) revise the 2 MW threshold for participation in the Fast Track Process included in section 2 of the pro forma SGIP; (3) revise the customer options meeting and the supplemental review following failure of the Fast Track screens so that the supplemental review is performed at the discretion of the Interconnection Customer and includes minimum load and other screens to determine if a Small Generating Facility may be interconnected safely and reliably; and (4) revise the pro forma SGIP Facilities Study Agreement to allow the Interconnection Customer the opportunity to provide written comments to the Transmission Provider on the upgrades required for interconnection. The Commission also proposes to clarify or correct certain sections of the pro forma SGIP and SGIA. The proposed reforms are intended to ensure that the time and cost to process small generator interconnect requests will be just and reasonable and not unduly discriminatory. To facilitate discussion of the proposed reforms, the Commission intends to hold a workshop at which stakeholders may discuss the proposals made in this NOPR. The workshop is to be held before the end of the comment period.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.